With the construction of the Three Gorges Reservoir dam,frequent reservoir landslide events have been recorded.In recent years,multi-row stabilizing piles(MRSPs)have been used to stabilize massive reservoir landslides...With the construction of the Three Gorges Reservoir dam,frequent reservoir landslide events have been recorded.In recent years,multi-row stabilizing piles(MRSPs)have been used to stabilize massive reservoir landslides in China.In this study,two centrifuge model tests were carried out to study the unreinforced and MRSP-reinforced slopes subjected to reservoir water level(RWL)operation,using the Taping landslide as a prototype.The results indicate that the RWL rising can provide lateral support within the submerged zone and then produce the inward seepage force,eventually strengthening the slope stability.However,a rapid RWL drawdown may induce outward seepage forces and a sudden debuttressing effect,consequently reducing the effective soil normal stress and triggering partial pre-failure within the RWL fluctuation zone.Furthermore,partial deformation and subsequent soil structure damage generate excess pore water pressures,ultimately leading to the overall failure of the reservoir landslide.This study also reveals that a rapid increase in the downslope driving force due to RWL drawdown significantly intensifies the lateral earth pressures exerted on the MRSPs.Conversely,the MRSPs possess a considerable reinforcement effect on the reservoir landslide,transforming the overall failure into a partial deformation and failure situated above and in front of the MRSPs.The mechanical transfer behavior observed in the MRSPs demonstrates a progressive alteration in relation to RWL fluctuations.As the RWL rises,the mechanical states among MRSPs exhibit a growing imbalance.The shear force transfer factor(i.e.the ratio of shear forces on pile of the n th row to that of the first row)increases significantly with the RWL drawdown.This indicates that the mechanical states among MRSPs tend toward an enhanced equilibrium.The insights gained from this study contribute to a more comprehensive understanding of the failure mechanisms of reservoir landslides and the mechanical behavior of MRSPs in reservoir banks.展开更多
Three dimensional analysis was performed by regarding vibration isolation performance cast-in-place concrete thin-wall pipe pile (PCC) and using the finite element analysis software ANSYS. The ground vertical amplitud...Three dimensional analysis was performed by regarding vibration isolation performance cast-in-place concrete thin-wall pipe pile (PCC) and using the finite element analysis software ANSYS. The ground vertical amplitude was analyzed behind the single row cast-in-place concrete thin-wall pipe pile after the source vibration, and the influencing factors were also studied. The results indicate that in the one time of wavelength before the barrier, the oscillation amplitude is weakened; meanwhile the range which covers 4 times wavelength behind the barrier has a good vibration isolation effect, when the distance is larger than the barrier latter 4 times wavelength vibration isolation expiration.展开更多
Combined with practical engineering, based on the introduction of soil arching theory, we explore the impact of barrier piles in blind sheet-pile bank connecting structure. Besides, we build a plane strain model by AB...Combined with practical engineering, based on the introduction of soil arching theory, we explore the impact of barrier piles in blind sheet-pile bank connecting structure. Besides, we build a plane strain model by ABAQUS sot'cware to study the impact of cross section type, the pile spacing and soil properties on soil arching effect. We find that cross section type of the pile has a certain influence on soil stress distribution in front of the barrier piles by comparing circular cross section and rectangular cross section. We also find that clear distance between the barrier piles and cohesive force of the soil have a great influence on that impact. We can increase clear distance between the barrier piles appropriately to improve the efficiency of construction and reduce the proiect cost.展开更多
基金funded by Chongqing Natural Science Key Program of China(Grant No.cstc2020jcyj-zdxmX0019)China Geological Survey Program(Grant No.DD20190637/DD20221748).
文摘With the construction of the Three Gorges Reservoir dam,frequent reservoir landslide events have been recorded.In recent years,multi-row stabilizing piles(MRSPs)have been used to stabilize massive reservoir landslides in China.In this study,two centrifuge model tests were carried out to study the unreinforced and MRSP-reinforced slopes subjected to reservoir water level(RWL)operation,using the Taping landslide as a prototype.The results indicate that the RWL rising can provide lateral support within the submerged zone and then produce the inward seepage force,eventually strengthening the slope stability.However,a rapid RWL drawdown may induce outward seepage forces and a sudden debuttressing effect,consequently reducing the effective soil normal stress and triggering partial pre-failure within the RWL fluctuation zone.Furthermore,partial deformation and subsequent soil structure damage generate excess pore water pressures,ultimately leading to the overall failure of the reservoir landslide.This study also reveals that a rapid increase in the downslope driving force due to RWL drawdown significantly intensifies the lateral earth pressures exerted on the MRSPs.Conversely,the MRSPs possess a considerable reinforcement effect on the reservoir landslide,transforming the overall failure into a partial deformation and failure situated above and in front of the MRSPs.The mechanical transfer behavior observed in the MRSPs demonstrates a progressive alteration in relation to RWL fluctuations.As the RWL rises,the mechanical states among MRSPs exhibit a growing imbalance.The shear force transfer factor(i.e.the ratio of shear forces on pile of the n th row to that of the first row)increases significantly with the RWL drawdown.This indicates that the mechanical states among MRSPs tend toward an enhanced equilibrium.The insights gained from this study contribute to a more comprehensive understanding of the failure mechanisms of reservoir landslides and the mechanical behavior of MRSPs in reservoir banks.
基金Project(50679017) supported by the National Natural Science Foundation of China
文摘Three dimensional analysis was performed by regarding vibration isolation performance cast-in-place concrete thin-wall pipe pile (PCC) and using the finite element analysis software ANSYS. The ground vertical amplitude was analyzed behind the single row cast-in-place concrete thin-wall pipe pile after the source vibration, and the influencing factors were also studied. The results indicate that in the one time of wavelength before the barrier, the oscillation amplitude is weakened; meanwhile the range which covers 4 times wavelength behind the barrier has a good vibration isolation effect, when the distance is larger than the barrier latter 4 times wavelength vibration isolation expiration.
文摘Combined with practical engineering, based on the introduction of soil arching theory, we explore the impact of barrier piles in blind sheet-pile bank connecting structure. Besides, we build a plane strain model by ABAQUS sot'cware to study the impact of cross section type, the pile spacing and soil properties on soil arching effect. We find that cross section type of the pile has a certain influence on soil stress distribution in front of the barrier piles by comparing circular cross section and rectangular cross section. We also find that clear distance between the barrier piles and cohesive force of the soil have a great influence on that impact. We can increase clear distance between the barrier piles appropriately to improve the efficiency of construction and reduce the proiect cost.