In the imaging observation system, imaging task scheduling is an important topic. Most scholars study the imaging task scheduling from the perspective of static priority, and only a few from the perspective of dynamic...In the imaging observation system, imaging task scheduling is an important topic. Most scholars study the imaging task scheduling from the perspective of static priority, and only a few from the perspective of dynamic priority. However,the priority of the imaging task is dynamic in actual engineering. To supplement the research on imaging observation, this paper proposes the task priority model, dynamic scheduling strategy and Heuristic algorithm. At first, this paper analyzes the relevant theoretical basis of imaging observation, decomposes the task priority into four parts, including target priority, imaging task priority, track, telemetry & control(TT&C)requirement priority and data transmission requirement priority, summarizes the attribute factors that affect the above four types of priority in detail, and designs the corresponding priority model. Then, this paper takes the emergency tasks scheduling problem as the background, proposes the dynamic scheduling strategy and heuristic algorithm. Finally, the task priority model,dynamic scheduling strategy and heuristic algorithm are verified by experiments.展开更多
Considering the flexible attitude maneuver and the narrow field of view of agile Earth observation satellite(AEOS)together,a comprehensive task clustering(CTC)is proposed to improve the observation scheduling problem ...Considering the flexible attitude maneuver and the narrow field of view of agile Earth observation satellite(AEOS)together,a comprehensive task clustering(CTC)is proposed to improve the observation scheduling problem for AEOS(OSPFAS).Since the observation scheduling problem for AEOS with comprehensive task clustering(OSWCTC)is a dynamic combination optimization problem,two optimization objectives,the loss rate(LR)of the image quality and the energy consumption(EC),are proposed to format OSWCTC as a bi-objective optimization model.Harnessing the power of an adaptive large neighborhood search(ALNS)algorithm with a nondominated sorting genetic algorithm II(NSGA-II),a bi-objective optimization algorithm,ALNS+NSGA-II,is developed to solve OSWCTC.Based on the existing instances,the efficiency of ALNS+NSGA-II is analyzed from several aspects,meanwhile,results of extensive computational experiments are presented which disclose that OSPFAS considering CTC produces superior outcomes.展开更多
Aiming at the problem of resource allocation for digital array radar( DAR),a dwell scheduling algorithm is proposed in this paper. Firstly,the integrated priority of different radar tasks is designed,which ensures t...Aiming at the problem of resource allocation for digital array radar( DAR),a dwell scheduling algorithm is proposed in this paper. Firstly,the integrated priority of different radar tasks is designed,which ensures that the imaging tasks are scheduled without affecting the search and tracking tasks; Then,the optimal scheduling model of radar resource is established according to the constraints of pulse interleaving; Finally,a heuristic algorithm is used to solve the problem and a sparse-aperture cognitive ISAR imaging method is used to achieve partial precision tracking target imaging. Simulation results demonstrate that the proposed algorithm can both improve the performance of the radar system,and generate satisfactory imaging results.展开更多
Speckle filtering of synthetic aperture radar (SAR) images while preserving the spatial signal variability (texture and fine structures) still remains a challenge. Many algorithms have been proposed for the SAR imager...Speckle filtering of synthetic aperture radar (SAR) images while preserving the spatial signal variability (texture and fine structures) still remains a challenge. Many algorithms have been proposed for the SAR imagery despeckling. However, simulated annealing (SA) methods is one of excellent choices currently. A critical problem in the study on SA is to provide appropriate cooling schedules that ensure fast convergence to near-optimal solutions. This paper gives a new necessary and sufficient condition for the cooling schedule so that the algorithm state converges in all probability to the set of global minimum cost states. Moreover, it constructs an appropriate objective function for SAR image despeckling. An experimental result of the actual SAR image processing is obtained.展开更多
针对传统地铁施工进度管理方式下数据间协同效率低、缺乏形象化表达等问题,将建筑信息模型(BIM,Building Information Modeling)技术与地铁工程分部分项相结合,提出了基于BIM的地铁工程施工进度管理方案。通过建立地铁施工的工程分解结...针对传统地铁施工进度管理方式下数据间协同效率低、缺乏形象化表达等问题,将建筑信息模型(BIM,Building Information Modeling)技术与地铁工程分部分项相结合,提出了基于BIM的地铁工程施工进度管理方案。通过建立地铁施工的工程分解结构(EBS,Engineering Breakdown Structure)标准,构建BIM与分部分项的映射关系;施工点根据工序完成量填报施工进度并制定施工计划,自动生成施工报表,得到进度统计数据。在广州地铁十一号线施工总承包项目中的应用表明,该方案对线路级综合进度管理作用明显,实现了施工计划及施工过程的自动化、规范化管控和精细化管理,有效提高了施工进度管理水平和管理效率。展开更多
In the ‘‘Internet Plus" era, space-based information services require effective and fast image satellite scheduling. Most existing studies consider image satellite scheduling to be an optimization problem to so...In the ‘‘Internet Plus" era, space-based information services require effective and fast image satellite scheduling. Most existing studies consider image satellite scheduling to be an optimization problem to solve with searching algorithms in a batch-wise manner. No real-time speed method for satellite scheduling exists. In this paper, with the idea of building a real-time speed method, satellite scheduling is remodeled based on a Dynamic and Stochastic Knapsack Problem(DSKP), and the objective is to maximize the total expected profit. No existing algorithm could be able to solve this novel scheduling problem properly. With inspiration from the recent achievements in Deep Reinforcement Learning(DRL) in video games, AlphaGo and dynamic controlling,a novel DRL-based method is applied to training a neural network to schedule tasks. The numerical results show that the method proposed in this paper can achieve relatively good performance with real-time speed and immediate respond style.展开更多
基金supported by the National Natural Science Foundation of China(61773120,61473301,71501180,71501179,61603400)。
文摘In the imaging observation system, imaging task scheduling is an important topic. Most scholars study the imaging task scheduling from the perspective of static priority, and only a few from the perspective of dynamic priority. However,the priority of the imaging task is dynamic in actual engineering. To supplement the research on imaging observation, this paper proposes the task priority model, dynamic scheduling strategy and Heuristic algorithm. At first, this paper analyzes the relevant theoretical basis of imaging observation, decomposes the task priority into four parts, including target priority, imaging task priority, track, telemetry & control(TT&C)requirement priority and data transmission requirement priority, summarizes the attribute factors that affect the above four types of priority in detail, and designs the corresponding priority model. Then, this paper takes the emergency tasks scheduling problem as the background, proposes the dynamic scheduling strategy and heuristic algorithm. Finally, the task priority model,dynamic scheduling strategy and heuristic algorithm are verified by experiments.
文摘Considering the flexible attitude maneuver and the narrow field of view of agile Earth observation satellite(AEOS)together,a comprehensive task clustering(CTC)is proposed to improve the observation scheduling problem for AEOS(OSPFAS).Since the observation scheduling problem for AEOS with comprehensive task clustering(OSWCTC)is a dynamic combination optimization problem,two optimization objectives,the loss rate(LR)of the image quality and the energy consumption(EC),are proposed to format OSWCTC as a bi-objective optimization model.Harnessing the power of an adaptive large neighborhood search(ALNS)algorithm with a nondominated sorting genetic algorithm II(NSGA-II),a bi-objective optimization algorithm,ALNS+NSGA-II,is developed to solve OSWCTC.Based on the existing instances,the efficiency of ALNS+NSGA-II is analyzed from several aspects,meanwhile,results of extensive computational experiments are presented which disclose that OSPFAS considering CTC produces superior outcomes.
基金Supported by the National Natural Science Foundation of China(61471386)
文摘Aiming at the problem of resource allocation for digital array radar( DAR),a dwell scheduling algorithm is proposed in this paper. Firstly,the integrated priority of different radar tasks is designed,which ensures that the imaging tasks are scheduled without affecting the search and tracking tasks; Then,the optimal scheduling model of radar resource is established according to the constraints of pulse interleaving; Finally,a heuristic algorithm is used to solve the problem and a sparse-aperture cognitive ISAR imaging method is used to achieve partial precision tracking target imaging. Simulation results demonstrate that the proposed algorithm can both improve the performance of the radar system,and generate satisfactory imaging results.
基金ThisprojectwassupportedbytheNationalNaturalScienceFoundationofChina (No .6 98310 40 )
文摘Speckle filtering of synthetic aperture radar (SAR) images while preserving the spatial signal variability (texture and fine structures) still remains a challenge. Many algorithms have been proposed for the SAR imagery despeckling. However, simulated annealing (SA) methods is one of excellent choices currently. A critical problem in the study on SA is to provide appropriate cooling schedules that ensure fast convergence to near-optimal solutions. This paper gives a new necessary and sufficient condition for the cooling schedule so that the algorithm state converges in all probability to the set of global minimum cost states. Moreover, it constructs an appropriate objective function for SAR image despeckling. An experimental result of the actual SAR image processing is obtained.
文摘针对传统地铁施工进度管理方式下数据间协同效率低、缺乏形象化表达等问题,将建筑信息模型(BIM,Building Information Modeling)技术与地铁工程分部分项相结合,提出了基于BIM的地铁工程施工进度管理方案。通过建立地铁施工的工程分解结构(EBS,Engineering Breakdown Structure)标准,构建BIM与分部分项的映射关系;施工点根据工序完成量填报施工进度并制定施工计划,自动生成施工报表,得到进度统计数据。在广州地铁十一号线施工总承包项目中的应用表明,该方案对线路级综合进度管理作用明显,实现了施工计划及施工过程的自动化、规范化管控和精细化管理,有效提高了施工进度管理水平和管理效率。
基金co-supported by the Key Programs of the Chinese Academy of Sciences (No. ZDRW-KT-2016-2)the National High-tech Research and Development Program of China (No. 2015AA7013040)
文摘In the ‘‘Internet Plus" era, space-based information services require effective and fast image satellite scheduling. Most existing studies consider image satellite scheduling to be an optimization problem to solve with searching algorithms in a batch-wise manner. No real-time speed method for satellite scheduling exists. In this paper, with the idea of building a real-time speed method, satellite scheduling is remodeled based on a Dynamic and Stochastic Knapsack Problem(DSKP), and the objective is to maximize the total expected profit. No existing algorithm could be able to solve this novel scheduling problem properly. With inspiration from the recent achievements in Deep Reinforcement Learning(DRL) in video games, AlphaGo and dynamic controlling,a novel DRL-based method is applied to training a neural network to schedule tasks. The numerical results show that the method proposed in this paper can achieve relatively good performance with real-time speed and immediate respond style.