With the widespread of new energy vehicles, charging piles have alsobeen continuously installed and constructed. In order to make the number of pilesmeet the needs of the development of new energy vehicles, this study...With the widespread of new energy vehicles, charging piles have alsobeen continuously installed and constructed. In order to make the number of pilesmeet the needs of the development of new energy vehicles, this study aims toapply the method of system dynamics and combined with the grey prediction theory to determine the parameters as well as to simulate and analyze the ratio ofvehicles to chargers. Through scenario analysis, it is predicted that by 2030, thisratio will gradually decrease from 1.79 to 1. In order to achieve this ratio as 1:1, itis necessary to speed up the construction of public charging station or privatecharging station. Due to global warming, the attitudes of countries towards fuelvehicles have become increasingly tough. There is huge uncertainty in the growthrate of electric vehicles. Therefore, it is recommended that the construction ofcharging station be deployed in advance to avoid hindering the development ofelectric vehicles in the future.展开更多
文摘With the widespread of new energy vehicles, charging piles have alsobeen continuously installed and constructed. In order to make the number of pilesmeet the needs of the development of new energy vehicles, this study aims toapply the method of system dynamics and combined with the grey prediction theory to determine the parameters as well as to simulate and analyze the ratio ofvehicles to chargers. Through scenario analysis, it is predicted that by 2030, thisratio will gradually decrease from 1.79 to 1. In order to achieve this ratio as 1:1, itis necessary to speed up the construction of public charging station or privatecharging station. Due to global warming, the attitudes of countries towards fuelvehicles have become increasingly tough. There is huge uncertainty in the growthrate of electric vehicles. Therefore, it is recommended that the construction ofcharging station be deployed in advance to avoid hindering the development ofelectric vehicles in the future.