With the increase in the power receiving proportion and an insufficient peak regulation capacity of the local units, the receiving-end power grid struggles to achieve peak regulation in valley time. To solve this prob...With the increase in the power receiving proportion and an insufficient peak regulation capacity of the local units, the receiving-end power grid struggles to achieve peak regulation in valley time. To solve this problem while considering the potential of the large-scale charge load of electric vehicles(EVs), an aggregator-based demand response(DR) mechanism for EVs that are participating in the peak regulation in valley time is proposed in this study. In this aggregator-based DR mechanism, the profits for the power grid’s operation and the participation willingness of the EV owners are considered. Based on the characteristics of the EV charging process and the day-ahead unit generation scheduling, a rolling unit commitment model with the DR is established to maximize the social welfare. In addition, to improve the efficiency of the optimization problem solving process and to achieve communication between the independent system operator(ISO) and the aggregators, the clustering algorithm is utilized to extract typical EV charging patterns. Finally, the feasibility and benefits of the aggregator-based DR mechanism for saving the costs and reducing the peak-valley difference of the receiving-end power grid are verified through case studies.展开更多
We conduct analysis on the urban construction's demand for land, tourism's demand for land, infant industry's demand for land and infrastructure's demand for land in Hainan Province, respectively, and ...We conduct analysis on the urban construction's demand for land, tourism's demand for land, infant industry's demand for land and infrastructure's demand for land in Hainan Province, respectively, and forecast the amount of newly-added land in Hainan Province in 2015 compared to 2008. Based on regional characteristics, we analyze the main problems in land use in Hainan Province, and work out the regional land use regulation plan, to provide scientific guidance for the building of International tourist island in Hainan Province.展开更多
基金supported by the Science and Technology Project from the State Grid Shanghai Municipal Electric Power Company of China (52094019006U)the Shanghai Rising-Star Program (18QB1400200)。
文摘With the increase in the power receiving proportion and an insufficient peak regulation capacity of the local units, the receiving-end power grid struggles to achieve peak regulation in valley time. To solve this problem while considering the potential of the large-scale charge load of electric vehicles(EVs), an aggregator-based demand response(DR) mechanism for EVs that are participating in the peak regulation in valley time is proposed in this study. In this aggregator-based DR mechanism, the profits for the power grid’s operation and the participation willingness of the EV owners are considered. Based on the characteristics of the EV charging process and the day-ahead unit generation scheduling, a rolling unit commitment model with the DR is established to maximize the social welfare. In addition, to improve the efficiency of the optimization problem solving process and to achieve communication between the independent system operator(ISO) and the aggregators, the clustering algorithm is utilized to extract typical EV charging patterns. Finally, the feasibility and benefits of the aggregator-based DR mechanism for saving the costs and reducing the peak-valley difference of the receiving-end power grid are verified through case studies.
基金Supported by Department of Land,Environment & Resources of Hainan Province (20118)
文摘We conduct analysis on the urban construction's demand for land, tourism's demand for land, infant industry's demand for land and infrastructure's demand for land in Hainan Province, respectively, and forecast the amount of newly-added land in Hainan Province in 2015 compared to 2008. Based on regional characteristics, we analyze the main problems in land use in Hainan Province, and work out the regional land use regulation plan, to provide scientific guidance for the building of International tourist island in Hainan Province.