期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Multi-objective optimization of high-sulfur natural gas purif ication plant 被引量:1
1
作者 Jian-Feng Shang Zhong-Li Ji +1 位作者 Min Qiu Li-Min Ma 《Petroleum Science》 SCIE CAS CSCD 2019年第6期1430-1441,共12页
There exists large space to save energy of high-sulfur natural gas purification process.The multi-objective optimization problem has been investigated to effectively reduce the total comprehensive energy consumption a... There exists large space to save energy of high-sulfur natural gas purification process.The multi-objective optimization problem has been investigated to effectively reduce the total comprehensive energy consumption and further improve the production rate of purified gas.A steady-state simulation model of high-sulfur natural gas purification process has been set up by using ProMax.Seven key operating parameters of the purification process have been determined based on the analysis of comprehensive energy consumption distribution.To solve the problem that the process model does not converge in some conditions,back-propagation(BP)neural network has been applied to substitute the simulation model to predict the relative parameters in the optimization model.The uniform design method and the table U21(107)have been applied to design the experiment points for training and testing BP model.High prediction accuracy can be achieved by using the BP model.Nondominated sorting genetic algorithm-II has been developed to optimize the two objectives,and 100 Pareto optimal solutions have been obtained.Three optimal points have been selected and evaluated further.The results demonstrate that the total comprehensive energy consumption is reduced by 13.4%and the production rate of purified gas is improved by 0.2%under the optimized operating conditions. 展开更多
关键词 High-sulfur natural gas purifi cation plant Multi-objective optimization Process simulation model Thermodynamic analysis BP neural network Genetic algorithm
下载PDF
Pollutant Sources and Foaming Control Measures of Decarbonization Solution in Natural Gas Purification Plant
2
作者 Haibo Zheng 《Journal of Architectural Research and Development》 2021年第2期62-65,共4页
Yanbei project of Schlumberger Copower Oilfield Engineering Co.,Ltd.-natural gas purification plant decarbonization unit is equipped with two sets of decarbonization systems(parallel operation).The two sets of systems... Yanbei project of Schlumberger Copower Oilfield Engineering Co.,Ltd.-natural gas purification plant decarbonization unit is equipped with two sets of decarbonization systems(parallel operation).The two sets of systems adopt two tower process,full lean liquid circulation regeneration process,one tower absorption(absorption pressure 5.4mpag),one tower regeneration(regeneration temperature 95℃-110℃),purified natural gas carbon dioxide content≤2.5vol%,single set The treatment capacity is 2300 KM3/d.This paper introduces the problems existing in the decarbonization solution of the decarbonization unit in the natural gas purification plant in recent three years,analyzes the causes of pollutants affecting the quality of the decarbonization solution,and probes into the control measures for the pollution of the decarbonization solution,so as to provide reference. 展开更多
关键词 natural gas purification plant Decarbonization solution Foaming reason Control measures
下载PDF
Modeling and Simulation of Skid-mounted LNG Plants Using HYSYS Software 被引量:1
3
作者 黄志光 汪荣顺 +1 位作者 顾安忠 石玉美 《Journal of Donghua University(English Edition)》 EI CAS 2007年第1期1-5,共5页
This study presents three kinds of skid-mounted plants, including single mixed refrigerant cycle (MRC), nitrogen expander cycle, and natural gas (NG) Claude cycle. Hysys simulation shows that single MRC is the mos... This study presents three kinds of skid-mounted plants, including single mixed refrigerant cycle (MRC), nitrogen expander cycle, and natural gas (NG) Claude cycle. Hysys simulation shows that single MRC is the most efficient cycle among the three. The specific power of single MRC liquefiers is 1 485 k.l/kg, 15% higher than that of large liquefaction process. Considering the recovery of stranded-gas, commercial analysis suggests that the initial cost of LNG plants ranging from 1 to 100 ms/day can be paid back in 2 to 4 years. 展开更多
关键词 small-scale natural gas liquefaction plants process simulation economic effects Hysys software.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部