This paper presents a novel approach for electrical distribution network expansion planning using multi-objective particle swarm optimization (PSO). The optimization objectives are: investment and operation cost, ener...This paper presents a novel approach for electrical distribution network expansion planning using multi-objective particle swarm optimization (PSO). The optimization objectives are: investment and operation cost, energy losses cost, and power congestion cost. A two-phase multi-objective PSO algorithm is employed to solve this optimization problem, which can accelerate the convergence and guarantee the diversity of Pareto-optimal front set as well. The feasibility and effectiveness of both the proposed multi-objective planning approach and the improved multi-objective PSO have been verified by the 18-node typical system.展开更多
This paper uses a novel scenario generation method for tackling the uncertainties of wind power in the transmission network expansion planning(TNEP)problem.A heuristic moment matching(HMM)method is first applied to ge...This paper uses a novel scenario generation method for tackling the uncertainties of wind power in the transmission network expansion planning(TNEP)problem.A heuristic moment matching(HMM)method is first applied to generate the typical scenarios for capturing the stochastic features of wind power,including expectation,standard deviation,skewness,kurtosis,and correlation of multiple wind farms.Then,based on the typical scenarios,a robust TNEP problem is presented and formulated.The solution of the problem is robust against all the scenarios that represent the stochastic features of wind power.Three test systems are used to verify the HMM method and is compared against Taguchi’s Orthogonal Array(OA)method.The simulation results show that the HMM method has better performance than the OA method in terms of the trade-off between robustness and economy.Additionally,the main factors influencing the planning scheme are studied,including the number of scenarios,wind farm capacity,and penalty factors,which provide a reference for system operators choosing parameters.展开更多
Transmission network expansion can significantly improve the penetration level of renewable generation.However,existing studies have not explicitly revealed and quantified the trade-off between the investment cost and...Transmission network expansion can significantly improve the penetration level of renewable generation.However,existing studies have not explicitly revealed and quantified the trade-off between the investment cost and penetration level of renewable generation.This paper proposes a distributionally robust optimization model to minimize the cost of transmission network expansion under uncertainty and maximize the penetration level of renewable generation.The proposed model includes distributionally robust joint chance constraints,which maximize the minimum expectation of the renewable utilization probability among a set of certain probability distributions within an ambiguity set.The proposed formulation yields a twostage robust optimization model with variable bounds of the uncertain sets,which is hard to solve.By applying the affine decision rule,second-order conic reformulation,and duality,we reformulate it into a single-stage standard robust optimization model and solve it efficiently via commercial solvers.Case studies are carried on the Garver 6-bus and IEEE 118-bus systems to illustrate the validity of the proposed method.展开更多
基金financial supports and the strategic platform for innovation&research provided by Danish national project iPower.
文摘This paper presents a novel approach for electrical distribution network expansion planning using multi-objective particle swarm optimization (PSO). The optimization objectives are: investment and operation cost, energy losses cost, and power congestion cost. A two-phase multi-objective PSO algorithm is employed to solve this optimization problem, which can accelerate the convergence and guarantee the diversity of Pareto-optimal front set as well. The feasibility and effectiveness of both the proposed multi-objective planning approach and the improved multi-objective PSO have been verified by the 18-node typical system.
基金supported in part by the National Natural Science Foundation of China under Grant No.51377027The National Basic Research Program of China under Grant No.2013CB228205by Innovation Project of Guangxi Graduate Education under Grant No.YCSZ2015053.
文摘This paper uses a novel scenario generation method for tackling the uncertainties of wind power in the transmission network expansion planning(TNEP)problem.A heuristic moment matching(HMM)method is first applied to generate the typical scenarios for capturing the stochastic features of wind power,including expectation,standard deviation,skewness,kurtosis,and correlation of multiple wind farms.Then,based on the typical scenarios,a robust TNEP problem is presented and formulated.The solution of the problem is robust against all the scenarios that represent the stochastic features of wind power.Three test systems are used to verify the HMM method and is compared against Taguchi’s Orthogonal Array(OA)method.The simulation results show that the HMM method has better performance than the OA method in terms of the trade-off between robustness and economy.Additionally,the main factors influencing the planning scheme are studied,including the number of scenarios,wind farm capacity,and penalty factors,which provide a reference for system operators choosing parameters.
基金supported by the National Natural Science Foundation of China(No.52077136)。
文摘Transmission network expansion can significantly improve the penetration level of renewable generation.However,existing studies have not explicitly revealed and quantified the trade-off between the investment cost and penetration level of renewable generation.This paper proposes a distributionally robust optimization model to minimize the cost of transmission network expansion under uncertainty and maximize the penetration level of renewable generation.The proposed model includes distributionally robust joint chance constraints,which maximize the minimum expectation of the renewable utilization probability among a set of certain probability distributions within an ambiguity set.The proposed formulation yields a twostage robust optimization model with variable bounds of the uncertain sets,which is hard to solve.By applying the affine decision rule,second-order conic reformulation,and duality,we reformulate it into a single-stage standard robust optimization model and solve it efficiently via commercial solvers.Case studies are carried on the Garver 6-bus and IEEE 118-bus systems to illustrate the validity of the proposed method.