Practical Equivalent Method of Power Network Based on PSASP Short-Circuit Calculation Program
1
作者 Haini Qu Mingnian Li +1 位作者 Xiu Yang Pengfei Zhang 《Energy and Power Engineering》 2017年第4期683-692,共10页
When using the ATP-EMTP software to simulate the electromagnetic transient of local line or nearby line for a large area power grid, it is necessary to divide the area grid into internal network and external network s... When using the ATP-EMTP software to simulate the electromagnetic transient of local line or nearby line for a large area power grid, it is necessary to divide the area grid into internal network and external network so as to make the external network simple for the restriction of the simulation calculation scale of software. Based on the existing equivalence method, in this paper we proposed a practical equivalent method using the short-circuit calculation program of PSASP. In this way, we completed the equivalence of northwest power grid operating at the large mode of summer 2016. By comparing the power flow and the characteristics of short-circuit in the system before and after the equivalence, this equivalent method is proved to be correct. 展开更多
关键词 PSASP short-circuit calculation PRACTICAL EQUIVALENCE
下载PDF
Research of Pure Electric Ferry System and Its Short-Circuit Protection and Calculation
2
作者 Xiusong Yan Zechao Xu +1 位作者 Xingyu Yao Ning Wang 《Journal of Energy and Power Engineering》 2021年第1期8-15,共8页
System control and safety reliability are important links of the marine DC (Direct Current) power system. The simulationmodel is built by Matlab/Simulink, the battery and super-capacitor are supplied to the system thr... System control and safety reliability are important links of the marine DC (Direct Current) power system. The simulationmodel is built by Matlab/Simulink, the battery and super-capacitor are supplied to the system through a three-phase interleaved DC/DCconverter, the fuse and disconnector switch combination are used as the protection device, and the short-circuit point is set betweeneach branch and the DC distribution board, performing short-circuit simulation. This paper also proposes a short-circuit calculationmethod for super-capacitors based on the simplified model of series RC (Resistors & Capacitors), and verifies its correctness throughsimulation data. The results show that the introduction of a three-phase interleaved DC/DC converter reduces the current ripple andmakes the system control more convenient;short-circuit calculation and simulation have determined the short-circuit withstandcapability of the DC distribution board, and verified the feasibility of the fuse selection method and the short-circuit calculation methodof the super-capacitor. This provides reliable verification for the application and calculation of the actual project. 展开更多
关键词 Matlab/simulink simulation three-phase interleaved DC/DC battery and super-capacitor short-circuit protection and calculation
下载PDF
Partitioning Calculation Method of Short-Circuit Current for High Proportion DG Access to Distribution Network
3
作者 Wei Wang Qingzhu Shao +4 位作者 Shaoliang Wang Yiwei Zhao Yuanbo Ye Duanchao Li Mengyu Wu 《Energy Engineering》 EI 2024年第9期2569-2584,共16页
Aiming at the problemthat the traditional short-circuit current calculationmethod is not applicable to Distributed Generation(DG)accessing the distribution network,the paper proposes a short-circuit current partitioni... Aiming at the problemthat the traditional short-circuit current calculationmethod is not applicable to Distributed Generation(DG)accessing the distribution network,the paper proposes a short-circuit current partitioning calculation method considering the degree of voltage drop at the grid-connected point of DG.Firstly,the output characteristics of DG in the process of low voltage ride through are analyzed,and the equivalent output model of DG in the fault state is obtained.Secondly,by studying the network voltage distribution law after fault in distribution networks under different DG penetration rates,the degree of voltage drop at the grid-connected point of DG is used as a partition index to partition the distribution network.Then,iterative computation is performed within each partition,and data are transferred between partitions through split nodes to realize the fast partition calculation of short-circuit current for high proportion DG access to distribution network,which solves the problems of long iteration time and large calculation error of traditional short-circuit current.Finally,a 62-node real distribution network model containing a high proportion of DG access is constructed onMATLAB/Simulink,and the simulation verifies the effectiveness of the short-circuit current partitioning calculation method proposed in the paper,and its calculation speed is improved by 48.35%compared with the global iteration method. 展开更多
关键词 High proportion DG short-circuit calculation low voltage ride through partition iteration
下载PDF