期刊文献+
共找到2,504篇文章
< 1 2 126 >
每页显示 20 50 100
Enhancing Renewable Energy Integration:A Gaussian-Bare-Bones Levy Cheetah Optimization Approach to Optimal Power Flow in Electrical Networks
1
作者 Ali S.Alghamdi Mohamed A.Zohdy Saad Aldoihi 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第8期1339-1370,共32页
In the contemporary era,the global expansion of electrical grids is propelled by various renewable energy sources(RESs).Efficient integration of stochastic RESs and optimal power flow(OPF)management are critical for n... In the contemporary era,the global expansion of electrical grids is propelled by various renewable energy sources(RESs).Efficient integration of stochastic RESs and optimal power flow(OPF)management are critical for network optimization.This study introduces an innovative solution,the Gaussian Bare-Bones Levy Cheetah Optimizer(GBBLCO),addressing OPF challenges in power generation systems with stochastic RESs.The primary objective is to minimize the total operating costs of RESs,considering four functions:overall operating costs,voltage deviation management,emissions reduction,voltage stability index(VSI)and power loss mitigation.Additionally,a carbon tax is included in the objective function to reduce carbon emissions.Thorough scrutiny,using modified IEEE 30-bus and IEEE 118-bus systems,validates GBBLCO’s superior performance in achieving optimal solutions.Simulation results demonstrate GBBLCO’s efficacy in six optimization scenarios:total cost with valve point effects,total cost with emission and carbon tax,total cost with prohibited operating zones,active power loss optimization,voltage deviation optimization and enhancing voltage stability index(VSI).GBBLCO outperforms conventional techniques in each scenario,showcasing rapid convergence and superior solution quality.Notably,GBBLCO navigates complexities introduced by valve point effects,adapts to environmental constraints,optimizes costs while considering prohibited operating zones,minimizes active power losses,and optimizes voltage deviation by enhancing the voltage stability index(VSI)effectively.This research significantly contributes to advancing OPF,emphasizing GBBLCO’s improved global search capabilities and ability to address challenges related to local minima.GBBLCO emerges as a versatile and robust optimization tool for diverse challenges in power systems,offering a promising solution for the evolving needs of renewable energy-integrated power grids. 展开更多
关键词 Renewable energy integration optimal power flow stochastic renewable energy sources gaussian-bare-bones levy cheetah optimizer electrical network optimization carbon tax optimization
下载PDF
Design of Power Communication Data Network Management System and Implementation of Data Acquisition Module
2
作者 Yue Zhang Zefeng Jian Hao Wang 《Journal of Electronic Research and Application》 2021年第6期1-5,共5页
The power communication network is a separate network from the power grid whose primary purpose is to ensure the power grid's safe operation.This paper expounds the composition of the comprehensive network managem... The power communication network is a separate network from the power grid whose primary purpose is to ensure the power grid's safe operation.This paper expounds the composition of the comprehensive network management architecture of the power communication data network and the implementation of the data acquisition module in the network management system through theoretical analysis,for the reference of relevant personnel,in order to better promote the collection of power grid communication network data. 展开更多
关键词 Electric power communication Network management system design Data acquisition
下载PDF
Identification of Key Links in Electric Power Operation Based-Spatiotemporal Mixing Convolution Neural Network
3
作者 Lei Feng Bo Wang +2 位作者 Fuqi Ma Hengrui Ma Mohamed AMohamed 《Computer Systems Science & Engineering》 SCIE EI 2023年第8期1487-1501,共15页
As the scale of the power system continues to expand,the environment for power operations becomes more and more complex.Existing risk management and control methods for power operations can only set the same risk dete... As the scale of the power system continues to expand,the environment for power operations becomes more and more complex.Existing risk management and control methods for power operations can only set the same risk detection standard and conduct the risk detection for any scenario indiscriminately.Therefore,more reliable and accurate security control methods are urgently needed.In order to improve the accuracy and reliability of the operation risk management and control method,this paper proposes a method for identifying the key links in the whole process of electric power operation based on the spatiotemporal hybrid convolutional neural network.To provide early warning and control of targeted risks,first,the video stream is framed adaptively according to the pixel changes in the video stream.Then,the optimized MobileNet is used to extract the feature map of the video stream,which contains both time-series and static spatial scene information.The feature maps are combined and non-linearly mapped to realize the identification of dynamic operating scenes.Finally,training samples and test samples are produced by using the whole process image of a power company in Xinjiang as a case study,and the proposed algorithm is compared with the unimproved MobileNet.The experimental results demonstrated that the method proposed in this paper can accurately identify the type and start and end time of each operation link in the whole process of electric power operation,and has good real-time performance.The average accuracy of the algorithm can reach 87.8%,and the frame rate is 61 frames/s,which is of great significance for improving the reliability and accuracy of security control methods. 展开更多
关键词 Security risk management key links identifications electric power operation spatiotemporal mixing convolution neural network MobileNet network
下载PDF
Hybrid Power Bank Deployment Model for Energy Supply Coverage Optimization in Industrial Wireless Sensor Network
4
作者 Hang Yang Xunbo Li Witold Pedrycz 《Intelligent Automation & Soft Computing》 SCIE 2023年第8期1531-1551,共21页
Energy supply is one of the most critical challenges of wireless sensor networks(WSNs)and industrial wireless sensor networks(IWSNs).While research on coverage optimization problem(COP)centers on the network’s monito... Energy supply is one of the most critical challenges of wireless sensor networks(WSNs)and industrial wireless sensor networks(IWSNs).While research on coverage optimization problem(COP)centers on the network’s monitoring coverage,this research focuses on the power banks’energy supply coverage.The study of 2-D and 3-D spaces is typical in IWSN,with the realistic environment being more complex with obstacles(i.e.,machines).A 3-D surface is the field of interest(FOI)in this work with the established hybrid power bank deployment model for the energy supply COP optimization of IWSN.The hybrid power bank deployment model is highly adaptive and flexible for new or existing plants already using the IWSN system.The model improves the power supply to a more considerable extent with the least number of power bank deployments.The main innovation in this work is the utilization of a more practical surface model with obstacles and training while improving the convergence speed and quality of the heuristic algorithm.An overall probabilistic coverage rate analysis of every point on the FOI is provided,not limiting the scope to target points or areas.Bresenham’s algorithm is extended from 2-D to 3-D surface to enhance the probabilistic covering model for coverage measurement.A dynamic search strategy(DSS)is proposed to modify the artificial bee colony(ABC)and balance the exploration and exploitation ability for better convergence toward eliminating NP-hard deployment problems.Further,the cellular automata(CA)is utilized to enhance the convergence speed.The case study based on two typical FOI in the IWSN shows that the CA scheme effectively speeds up the optimization process.Comparative experiments are conducted on four benchmark functions to validate the effectiveness of the proposed method.The experimental results show that the proposed algorithm outperforms the ABC and gbest-guided ABC(GABC)algorithms.The results show that the proposed energy coverage optimization method based on the hybrid power bank deployment model generates more accurate results than the results obtained by similar algorithms(i.e.,ABC,GABC).The proposed model is,therefore,effective and efficient for optimization in the IWSN. 展开更多
关键词 Industrial wireless sensor network hybrid power bank deployment model:energy supply coverage optimization artificial bee colony algorithm radio frequency numerical function optimization
下载PDF
Protection Strategies against Cascading Failure for Power Systems of Ring Network 被引量:1
5
作者 Arun Kumar Hnin Yu Shwe Peter Han Joo Chong 《Communications and Network》 2016年第2期67-78,共12页
Power grid vulnerability is a key issue with large blackouts, causing power disruption for millions of people. The complexity of power grid, together with excessive number of components, makes it difficult to be model... Power grid vulnerability is a key issue with large blackouts, causing power disruption for millions of people. The complexity of power grid, together with excessive number of components, makes it difficult to be modeled. Currently, researchers use complex networks to model and study the performance of power grids. In fact, power grids can be modeled into a complex network by making use of ring network topology, with substations and transmission lines denoted as nodes and edges, respectively. In this paper, three protection schemes are proposed and their effectiveness in protecting the power network under high and low-load attacks is studied. The proposed schemes, namely, Cascaded Load Cut-off (CLC), Cascaded Load Overflow (CLO) and Adaptive-Cascaded Load Overflow (A-CLO), improve the robustness of the power grids, i.e., decrease the value of critical tolerance. Simulation results show that CLC and CLO protection schemes are more effective in improving the robustness of networks than the A-CLO protection scheme. However, the CLC protection scheme is effective only at the expense that certain percentage of the network will have no power supply. Thus, results show that the CLO protection scheme dominates the other protection schemes, CLC and A-CLO, in terms of the robustness of the network, improved with the precise amount of load cut-off determined. 展开更多
关键词 Electric power Grid Cascading Failure Protection Schemes NETWORKS
下载PDF
Discussion on the Integrated Communication System of Local Electric Power Network in China
6
作者 Zhang Guanyuan Gao Yun (Communication Department of Nanjing Automation Research Institute) 《Electricity》 1998年第4期50-53,共4页
This paper describes current situation and special requirements of local electric power communication network in China. The paper discusses the disadvantages of SDH and fiber loop carrier system applied to electric po... This paper describes current situation and special requirements of local electric power communication network in China. The paper discusses the disadvantages of SDH and fiber loop carrier system applied to electric power communication network. It presents a new Communication System-IDS-2000 integrated digital communication system. The paper introduces the characteristics and application of IDS-2000 system in the local electric power communication network. 展开更多
关键词 DEDICATED electric power COMMUNICATION NETWORK optical fiber COMMUNICATION SDH intelligent PCM TERMINAL UNIFORM NETWORK management systems
下载PDF
Optimum Simultaneous Allocation of Renewable Energy DG and Capacitor Banks in Radial Distribution Network
7
作者 Sivasangari Rajeswaran Kamaraj Nagappan 《Circuits and Systems》 2016年第11期3556-3564,共10页
Nowadays the optimal allocation of distributed generation (DG) in the distribution network becomes the popular research area in restructuring of power system. The capacitor banks introduced in the distribution network... Nowadays the optimal allocation of distributed generation (DG) in the distribution network becomes the popular research area in restructuring of power system. The capacitor banks introduced in the distribution networks for reactive power compensation also have the capacity to minimize the real and reactive power losses occurred in the system. Hence, this research integrates the allocation of renewable energy DG and capacitor banks in the radial distribution network to minimize the real power loss occurred in the system. A two-stage methodology is used for simultaneous allocation of renewable DG and capacitor banks. The optimum location of renewable energy DG and capacitor banks is determined using the distributed generation sitting index (DGSI) ranking method and the optimum sizing of DG and capacitor banks is found out for simultaneous placement using weight improved particle swarm optimization algorithm (WIPSO) and self adaptive differential evolution algorithm (SADE). This two-stage methodology reduces the burden of SADE and WIPSO algorithm, by using the DGSI index in determining the optimal location. Hence the computational time gets reduced which makes them suitable for online applications. By using the above methodology, a comprehensive performance analysis is done on IEEE 33 bus and 69 bus RDNs and the results are discussed in detail. 展开更多
关键词 Distributed Generation Capacitor banks Real power Loss Radial Distribution Network Distributed Generation Sitting Index WIPSO SADE
下载PDF
Assessing Micro-generation's and Non-linear Loads' Impact in the Power Quality of Low Voltage Distribution Networks
8
作者 Paulo Bonifacio Susana Viana +1 位作者 Luis Rodrigues Ana Estanqueiro 《Journal of Energy and Power Engineering》 2013年第12期2321-2335,共15页
关键词 风力涡轮发电机 非线性负载 低压配电网 评估 电能质量 微型 电力电子变换器 太阳能光伏
下载PDF
Determination of Effective Load Shedding Schemes in Electric Power Plants 被引量:1
9
作者 Godwin Effiong Priye Kenneth Ainah Jackson Karniliyus 《Energy and Power Engineering》 2020年第10期555-567,共13页
The ability of power system to survive the transition from preloading state to the gradual increase in load and thereafter reach an acceptable operational condition is an indication of transient stability of the syste... The ability of power system to survive the transition from preloading state to the gradual increase in load and thereafter reach an acceptable operational condition is an indication of transient stability of the system. The study analyzed load shedding scheme through the use of empirical measurement tools and load-flow simulation techniques. It was geared towards determining effective load shedding strategies to reduce unnecessary overload in order to achieve dynamic stability of the electric power network in the Export Free Trade Zone, Calabar, Nigeria. From the tests and the measurements taken, it was observed that the real and reactive powers from the generator and the mechanical power from the turbine engine were stable when the load shedding controller was switched on, as compared to when it was off. The engine speed, the bus-bar frequency and the output voltage of the generator stabilized within a shorter time (about 8 seconds) when the controller was switched on than when it was on the off condition. Also, there were noticeable fluctuations in the speed of the remaining two generators. It became stable at about 12 seconds after the loss. The variations were 0.3 per cent of the nominal speed value. The excitation voltage fluctuated from 1.2 (pu) to 4.5 (pu) when the bus voltage dipped as a result of additional load. It then came down and stabilized at 1.8 (pu) after few swings. This confirmed that the stability of power system is much enhanced when load shedding controllers are effectively configured on the network. 展开更多
关键词 power system Transient Stability Load Shedding Scheme Electric power Network
下载PDF
Distributed Secondary Control and Optimal Power Sharing in Microgrids 被引量:14
10
作者 Gang Chen Ening Feng 《IEEE/CAA Journal of Automatica Sinica》 SCIE EI 2015年第3期304-312,共9页
We address the control problem of microgrids and present a fully distributed control system which consists of primary controller,secondary controller,and optimal active power sharing controller.Different from the exis... We address the control problem of microgrids and present a fully distributed control system which consists of primary controller,secondary controller,and optimal active power sharing controller.Different from the existing control structure in microgrids,all these controllers are implemented as local controllers at each distributed generator.Thus,the requirement for a central controller is obviated.The performance analysis of the proposed control systems is provided,and the finite-time convergence properties for distributed secondary frequency and voltage controllers are achieved.Moreover,the distributed control system possesses the optimal active power sharing property.In the end,a microgrid test system is investigated to validate the effectiveness of the proposed control strategies. 展开更多
关键词 MICROGRID droop control distributed control optimal control
下载PDF
Transmission Characteristics of the Electric Power Dispatching Data Network 被引量:2
11
作者 LI Gaowang JU Wenyun DUAN Xianzhong SHI Dongyuan 《中国电机工程学报》 EI CSCD 北大核心 2012年第22期I0019-I0019,共1页
关键词 调度数据网络 传输特性 电力系统 数据传输模型 指示器
下载PDF
Application of artificial neural network and information theory to detection of insulators
12
作者 李卫东 唐丽艳 +1 位作者 宋家骅 柳焯 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2000年第3期32-36,共5页
Information theory is used to obtain the information gain for each identification feature, and this gain is used as the weight factor for this feature to stress the role of effective feature, and the ART model based o... Information theory is used to obtain the information gain for each identification feature, and this gain is used as the weight factor for this feature to stress the role of effective feature, and the ART model based on artificial neural network theory is then used for identification thereby forming the detection system for poor insulators. Exper iments and calculations show this approach is correct and feasible. 展开更多
关键词 INFORMATION GAIN artificial NEURAL NETWORK electrical power system DETECTION of insulators
下载PDF
Global Harmonic Rate Assessment in the Electricity Distribution Network in Niamey City:Case Studies of Domestic,Industrial and Hospital Substations 被引量:1
13
作者 Abdourahimoun Daouda Saidou Madougou Abdoul Aziz Ibrahim 《Energy and Power Engineering》 2017年第12期786-801,共16页
Like others countries of the world, in Niger also, we are witnessing an increasing use of non-linear electric loads in the domestic, hospital and industrial sectors. However, these loads degrade the shape of the elect... Like others countries of the world, in Niger also, we are witnessing an increasing use of non-linear electric loads in the domestic, hospital and industrial sectors. However, these loads degrade the shape of the electrical signal and cause disastrous effects to the equipment of the distribution system and the devices which are connected to the network. This article highlights the presence of electric harmonics in the distribution network in Niamey city. In order to do this, measurements were taken at the secondary level of the substations using an energy quality analyze r (FLUKE 1735). By using this measuring instrument, we quantified the voltage and current Total Harmonic Distortion (THD) in the three substations. The results obtained show that, although the statutable rates set by the standards are not exceeded for phase conductors, the neutral contains a very critical percentage of distortion on the residential and hospital substations. Moreover, this assessment made it possible to observe the variation of harmonics in the presence of voltage drops. 展开更多
关键词 Electric power Distribution Network Harmonic Disturbance Total Harmonic Distortion(THD) power Quality Distribution Network
下载PDF
Avian-power line interactions in the Gobi Desert of Mongolia:are mitigation actions effective?
14
作者 Adrian Orihuela-Torres Juan MPérez-García +3 位作者 Zebensui Morales-Reyes Lara Naves-Alegre JoséASánchez-Zapata Esther Sebastián-González 《Avian Research》 CSCD 2021年第3期382-390,共9页
Background:Electrocution and collisions on power lines are among the leading causes of non-natural mortality for birds.Power lines are exponentially increasing,particularly in developing countries,but mitigation strat... Background:Electrocution and collisions on power lines are among the leading causes of non-natural mortality for birds.Power lines are exponentially increasing,particularly in developing countries,but mitigation strategies to prevent bird mortality are questionable.Mongolia combines a recently increased power line network,an abundant raptor population,a dangerous crossarm configuration and a habitat with no natural perches,producing many bird-power line interactions.Our aim is to assess the bird mortality caused by power lines in the Gobi Desert of Mongolia,to determine the factors increasing the risk of bird electrocution,and to evaluate the effectiveness of used retrofitting measures.Methods:In July 2019 we covered 132.9 km of 15 kV power lines checking 1092 poles.We also conducted bird tran-sects to record raptor and corvid richness and abundance,to assess species vulnerability to electrocution.Results:We recorded 76 electrocuted birds of 7 species.Electrocution rate was 6.96 birds/100 poles.The most affected species were Common Raven(Corvus corax)and Upland Buzzard(Buteo hemilasius),highlighting the electro-cution of 5 endangered Saker Falcons(Falco cherrug).By contrast,we only recorded 8 individuals of 5 species collid-ing with wires,the most affected being Pallas’s Sandgrouse(Syrrhaptes paradoxus).About 76.1%of sampled poles had some mitigation measure.Of these,96.6%were brush perch deflectors and 3.4%rotating-mirrors perch deter-rents.We found differences in electrocution rates among crossarm configurations,with the strain insulator with one jumper being the most lethal.Additionally,we found no correlation between bird abundance and electrocution rates,suggesting that some species are more sensitive to electrocution.Although no differences in total bird electrocu-tion rates were detected between poles with and without perch deterrents,when bird size is considered,deterrents reduced the mortality rate of small birds,while they were ineffective for medium-sized birds.Conclusions:Despite the widespread use of perch deterrents in the Mongolian power line network,there is still an alarming electrocution rate.This strategy is ineffective and some mechanisms,such as brush perch deflectors,may increase the electrocution rate for some medium-sized birds.Finally,we propose strategies to minimize the avian electrocution rate in the Gobi Desert. 展开更多
关键词 Collision Crossarm configuration ELECTROCUTION Electric infrastructures Perch deterrent power line network RAPTOR
下载PDF
Fault Diagnosis Based on Graph Theory and Linear Discriminant Principle in Electric Power Network
15
作者 Yagang ZHANG Qian MA +2 位作者 Jinfang ZHANG Jing MA Zengping WANG 《Wireless Sensor Network》 2010年第1期62-69,共8页
In this paper, we adopt a novel topological approach to fault diagnosis. In our researches, global information will be introduced into electric power network, we are using mainly BFS of graph theory algorithms and lin... In this paper, we adopt a novel topological approach to fault diagnosis. In our researches, global information will be introduced into electric power network, we are using mainly BFS of graph theory algorithms and linear discriminant principle to resolve fast and exact analysis of faulty components and faulty sections, and finally accomplish fault diagnosis. The results of BFS and linear discriminant are identical. The main technical contributions and innovations in this paper include, introducing global information into electric power network, developing a novel topological analysis to fault diagnosis. Graph theory algorithms can be used to model many different physical and abstract systems such as transportation and communication networks, models for business administration, political science, and psychology and so on. And the linear discriminant is a procedure used to classify an object into one of several a priori groupings dependent on the individual characteristics of the object. In the study of fault diagnosis in electric power network, graph theory algorithms and linear discriminant technology must also have a good prospect of application. 展开更多
关键词 FAULT Diagnosis GRAPH Theory BFS LINEAR DISCRIMINANT PRINCIPLE Electric power Network
下载PDF
A lending contract for interconnection project between Northeast and North China Power Network signed
16
《Electricity》 2001年第1期48-48,共1页
关键词 bank A lending contract for interconnection project between Northeast and North China power Network signed
下载PDF
Reliability Assessment of Integrated Electricity and Natural Gas Transmission Systems in Presence of Power-to-gas and Combined Heat and Power Technologies
17
作者 Alireza Tabebordbar Mohammad Rastegar 《CSEE Journal of Power and Energy Systems》 SCIE EI CSCD 2023年第3期1193-1202,共10页
Assessing the reliability of integrated electricity and gas systems has become an important issue due to the strong dependence of these energy networks through the power-to-gas(P2G)and combined heat and power(CHP)tech... Assessing the reliability of integrated electricity and gas systems has become an important issue due to the strong dependence of these energy networks through the power-to-gas(P2G)and combined heat and power(CHP)technologies.The current work,initially,presents a detailed energy flow model for the integrated power and natural gas system in light of the P2G and CHP technologies.Considering the simultaneous load flow of networks,a contingency analysis procedure is proposed,and reliability is assessed through sequential Monte Carlo simulations.The current study examines the effect of independent and dependent operation of energy networks on the reliability of the systems.In particular,the effect of employing both P2G and CHP technologies on reliability criteria is evaluated.In addition,a series of sensitivity analysis are performed on the size and site of these technologies to investigate their effects on system reliability.The proposed method is implemented on an integrated IEEE 24-bus electrical power system and 20-node Belgian natural gas system.The simulation procedure certifies the proposed method for reliability assessment is practical and applicable.In addition,the results prove connection between energy networks through P2G and CHP technologies can improve reliability of networks if the site and size of technologies are properly determined. 展开更多
关键词 CHP technology P2G technology integrated electrical power and natural gas network reliability assessment sequential Monte Carlo simulation method
原文传递
Electric Power Marketing based on intelligence decision tree and artificial Neural Network
18
作者 NIU Wei-hua 《通讯和计算机(中英文版)》 2008年第1期27-30,共4页
关键词 电力市场 智能决策树 人工神经网络 数据处理
下载PDF
高比例新能源接入的主动配电网规划综述 被引量:3
19
作者 刘洪波 刘珅诚 +2 位作者 盖雪扬 刘永发 阎禹同 《发电技术》 CSCD 2024年第1期151-161,共11页
新能源以分布式电源的形式接入配电网,给系统带来了不可控性、随机性和波动性问题。借助现代电力电子、信息通信及自动控制等技术,灵活可控的主动配电网成为发展趋势,其中主动配电网规划是近年来研究的热点之一。综合国内外在这一领域... 新能源以分布式电源的形式接入配电网,给系统带来了不可控性、随机性和波动性问题。借助现代电力电子、信息通信及自动控制等技术,灵活可控的主动配电网成为发展趋势,其中主动配电网规划是近年来研究的热点之一。综合国内外在这一领域的研究成果,对主动配电网规划相关研究内容及其方法进行总结、分析及展望。对主动配电网基本结构进行了描述,介绍了配电网组成元素的特点;根据其控制变量的不同,对主动配电网规划模型进行了归类,总结了模型中的优化目标;针对常用模型求解算法及其优缺点进行分析、总结;通过对关键性问题的讨论,分析了未来主动配电网的发展趋势。 展开更多
关键词 电力系统 主动配电网规划 新能源 分布式电源
下载PDF
含分布式电源和电动汽车的配电网可靠性评估 被引量:1
20
作者 王辉 李旭阳 +3 位作者 王宝全 王一凡 方航 金子蓉 《重庆大学学报》 CAS CSCD 北大核心 2024年第1期115-126,共12页
针对目前大规模分布式电源和电动汽车接入配电网后,给配电网可靠性带来一定影响的问题,提出了一种含有分布式电源和电动汽车的新型配电网的可靠性评估方法。首先,考虑到风光出力的不确定性和相关性,选择拟合性最优的Frank-Copula函数,... 针对目前大规模分布式电源和电动汽车接入配电网后,给配电网可靠性带来一定影响的问题,提出了一种含有分布式电源和电动汽车的新型配电网的可靠性评估方法。首先,考虑到风光出力的不确定性和相关性,选择拟合性最优的Frank-Copula函数,建立了风光联合出力概率模型。其次,分析了电动汽车用户行为特征,提出了基于动态分时电价的电动汽车有序充放电控制策略。最后,基于改进IEEE-RBTS Bus6测试系统的主馈线F4,对系统的可靠性指标进行计算分析,结果表明所提的风光联合出力模型和有序充放电控制策略可以有效降低对配电网可靠性的影响。 展开更多
关键词 分布式电源 风光联合出力 电动汽车 有序充放电 配电网 可靠性评估
下载PDF
上一页 1 2 126 下一页 到第
使用帮助 返回顶部