The Geheyan Power Station on the Qingjiang river has four inlet tunnels, on the right bank, with its excavation diameter of 11.3 m to 12.5 m, after lining diameter of 9.5 m, axis to axis spacing of 24 m. The thickness...The Geheyan Power Station on the Qingjiang river has four inlet tunnels, on the right bank, with its excavation diameter of 11.3 m to 12.5 m, after lining diameter of 9.5 m, axis to axis spacing of 24 m. The thickness of the pillar between tunnels should usually be more than two times of tunnel diameter to ensure the stability of surrounding rock during excavation. In this paper, the excavation methods of tunnels with the pillar thickness as small as the tunnel diameter, such as smooth surface blasting, shotcrete support protection, are emphatically discussed.展开更多
在新型电力系统中,亟待深度挖掘需求侧资源以提升系统灵活性和新能源消纳能力。在“新基建”背景下,5G基站作为一种新型需求侧资源正迅速发展。研究如何在保证基站备用需求的前提下,由铁塔公司组建含大规模5G基站的虚拟电厂(virtual pow...在新型电力系统中,亟待深度挖掘需求侧资源以提升系统灵活性和新能源消纳能力。在“新基建”背景下,5G基站作为一种新型需求侧资源正迅速发展。研究如何在保证基站备用需求的前提下,由铁塔公司组建含大规模5G基站的虚拟电厂(virtual power plant,VPP)并常态化参与需求响应。首先,提出了考虑储能动态备用容量的5G基站运行可行域构建方法,建立了5G基站VPP的聚合模型。然后,建立了5G基站VPP响应负荷准线的日前优化模型,提出了适合对大规模5G基站进行协调控制的日内解聚合方法。最后,建立了含高比例新能源的区域电网仿真算例。仿真结果表明,聚合大规模基站参与准线型需求响应,可以显著降低5G基站的运行成本,同时提高电网的新能源消纳能力。展开更多
为解决电力系统暂态过电压风险评估中输入特征集构建合理性不足、强相关性差等问题,提出一种考虑新能源多场站短路比MRSCR(multiple renewable energy stations short circuit ratio)的暂态过电压风险评估方法。首先,通过分析暂态过电...为解决电力系统暂态过电压风险评估中输入特征集构建合理性不足、强相关性差等问题,提出一种考虑新能源多场站短路比MRSCR(multiple renewable energy stations short circuit ratio)的暂态过电压风险评估方法。首先,通过分析暂态过电压数学模型,发现MRSCR与暂态过电压呈负相关性;然后,综合考虑MRSCR与其他影响系统暂态过电压的关键因素,构建多维输入特征集;最后,通过卷积神经网络建立输入特征与暂态过电压的高维映射,实现系统暂态过电压风险的快速、准确评估,并通过算例分析验证了所提方法的有效性、可行性。展开更多
文摘The Geheyan Power Station on the Qingjiang river has four inlet tunnels, on the right bank, with its excavation diameter of 11.3 m to 12.5 m, after lining diameter of 9.5 m, axis to axis spacing of 24 m. The thickness of the pillar between tunnels should usually be more than two times of tunnel diameter to ensure the stability of surrounding rock during excavation. In this paper, the excavation methods of tunnels with the pillar thickness as small as the tunnel diameter, such as smooth surface blasting, shotcrete support protection, are emphatically discussed.
文摘在新型电力系统中,亟待深度挖掘需求侧资源以提升系统灵活性和新能源消纳能力。在“新基建”背景下,5G基站作为一种新型需求侧资源正迅速发展。研究如何在保证基站备用需求的前提下,由铁塔公司组建含大规模5G基站的虚拟电厂(virtual power plant,VPP)并常态化参与需求响应。首先,提出了考虑储能动态备用容量的5G基站运行可行域构建方法,建立了5G基站VPP的聚合模型。然后,建立了5G基站VPP响应负荷准线的日前优化模型,提出了适合对大规模5G基站进行协调控制的日内解聚合方法。最后,建立了含高比例新能源的区域电网仿真算例。仿真结果表明,聚合大规模基站参与准线型需求响应,可以显著降低5G基站的运行成本,同时提高电网的新能源消纳能力。
文摘为解决电力系统暂态过电压风险评估中输入特征集构建合理性不足、强相关性差等问题,提出一种考虑新能源多场站短路比MRSCR(multiple renewable energy stations short circuit ratio)的暂态过电压风险评估方法。首先,通过分析暂态过电压数学模型,发现MRSCR与暂态过电压呈负相关性;然后,综合考虑MRSCR与其他影响系统暂态过电压的关键因素,构建多维输入特征集;最后,通过卷积神经网络建立输入特征与暂态过电压的高维映射,实现系统暂态过电压风险的快速、准确评估,并通过算例分析验证了所提方法的有效性、可行性。