期刊文献+
共找到743篇文章
< 1 2 38 >
每页显示 20 50 100
An Elite-Class Teaching-Learning-Based Optimization for Reentrant Hybrid Flow Shop Scheduling with Bottleneck Stage
1
作者 Deming Lei Surui Duan +1 位作者 Mingbo Li Jing Wang 《Computers, Materials & Continua》 SCIE EI 2024年第4期47-63,共17页
Bottleneck stage and reentrance often exist in real-life manufacturing processes;however,the previous research rarely addresses these two processing conditions in a scheduling problem.In this study,a reentrant hybrid ... Bottleneck stage and reentrance often exist in real-life manufacturing processes;however,the previous research rarely addresses these two processing conditions in a scheduling problem.In this study,a reentrant hybrid flow shop scheduling problem(RHFSP)with a bottleneck stage is considered,and an elite-class teaching-learning-based optimization(ETLBO)algorithm is proposed to minimize maximum completion time.To produce high-quality solutions,teachers are divided into formal ones and substitute ones,and multiple classes are formed.The teacher phase is composed of teacher competition and teacher teaching.The learner phase is replaced with a reinforcement search of the elite class.Adaptive adjustment on teachers and classes is established based on class quality,which is determined by the number of elite solutions in class.Numerous experimental results demonstrate the effectiveness of new strategies,and ETLBO has a significant advantage in solving the considered RHFSP. 展开更多
关键词 Hybrid flow shop scheduling REENTRANT bottleneck stage teaching-learning-based optimization
下载PDF
Competitive and Cooperative-Based Strength Pareto Evolutionary Algorithm for Green Distributed Heterogeneous Flow Shop Scheduling
2
作者 Kuihua Huang Rui Li +2 位作者 Wenyin Gong Weiwei Bian Rui Wang 《Intelligent Automation & Soft Computing》 SCIE 2023年第8期2077-2101,共25页
This work aims to resolve the distributed heterogeneous permutation flow shop scheduling problem(DHPFSP)with minimizing makespan and total energy consumption(TEC).To solve this NP-hard problem,this work proposed a com... This work aims to resolve the distributed heterogeneous permutation flow shop scheduling problem(DHPFSP)with minimizing makespan and total energy consumption(TEC).To solve this NP-hard problem,this work proposed a competitive and cooperative-based strength Pareto evolutionary algorithm(CCSPEA)which contains the following features:1)An initialization based on three heuristic rules is developed to generate a population with great diversity and convergence.2)A comprehensive metric combining convergence and diversity metrics is used to better represent the heuristic information of a solution.3)A competitive selection is designed which divides the population into a winner and a loser swarms based on the comprehensive metric.4)A cooperative evolutionary schema is proposed for winner and loser swarms to accelerate the convergence of global search.5)Five local search strategies based on problem knowledge are designed to improve convergence.6)Aproblem-based energy-saving strategy is presented to reduce TEC.Finally,to evaluate the performance of CCSPEA,it is compared to four state-of-art and run on 22 instances based on the Taillard benchmark.The numerical experiment results demonstrate that 1)the proposed comprehensive metric can efficiently represent the heuristic information of each solution to help the later step divide the population.2)The global search based on the competitive and cooperative schema can accelerate loser solutions convergence and further improve the winner’s exploration.3)The problembased initialization,local search,and energy-saving strategies can efficiently reduce the makespan and TEC.4)The proposed CCSPEA is superior to the state-of-art for solving DHPFSP. 展开更多
关键词 Distributed heterogeneous flow shop scheduling green scheduling SPEA2 competitive and cooperative
下载PDF
A Decomposition and Coordination Scheduling Method for Flow-shop Problem Based on TOC 被引量:7
3
作者 张宏远 席裕庚 谷寒雨 《自动化学报》 EI CSCD 北大核心 2005年第2期182-187,共6页
There are many flow shop problems of throughput (denoted by FSPT) with constraints of due date in real production planning and scheduling. In this paper, a decomposition and coordination algorithm is proposed based on... There are many flow shop problems of throughput (denoted by FSPT) with constraints of due date in real production planning and scheduling. In this paper, a decomposition and coordination algorithm is proposed based on the analysis of FSPT and under the support of TOC (theory of constraint). A flow shop is at first decomposed into two subsystems named PULL and PUSH by means of bottleneck. Then the subsystem is decomposed into single machine scheduling problems,so the original NP-HARD problem can be transferred into a serial of single machine optimization problems finally. This method reduces the computational complexity, and has been used in a real project successfully. 展开更多
关键词 约束理论 flow-shop分解协调算法 TOC 瓶颈
下载PDF
Differential evolution algorithm for hybrid flow-shop scheduling problems 被引量:9
4
作者 Ye Xu Ling Wang 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2011年第5期794-798,共5页
Aiming at the hybrid flow-shop (HFS) scheduling that is a complex NP-hard combinatorial problem with wide engineering background, an effective algorithm based on differential evolution (DE) is proposed. By using a... Aiming at the hybrid flow-shop (HFS) scheduling that is a complex NP-hard combinatorial problem with wide engineering background, an effective algorithm based on differential evolution (DE) is proposed. By using a special encoding scheme and combining DE based evolutionary search and local search, the exploration and exploitation abilities are enhanced and well balanced for solving the HFS problems. Simulation results based on some typical problems and comparisons with some existing genetic algorithms demonstrate the proposed algorithm is effective, efficient and robust for solving the HFS problems. 展开更多
关键词 hybrid flow-shop (HFS) scheduling differential evolution (DE) local search.
下载PDF
A novel hybrid estimation of distribution algorithm for solving hybrid flowshop scheduling problem with unrelated parallel machine 被引量:9
5
作者 孙泽文 顾幸生 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第8期1779-1788,共10页
The hybrid flow shop scheduling problem with unrelated parallel machine is a typical NP-hard combinatorial optimization problem, and it exists widely in chemical, manufacturing and pharmaceutical industry. In this wor... The hybrid flow shop scheduling problem with unrelated parallel machine is a typical NP-hard combinatorial optimization problem, and it exists widely in chemical, manufacturing and pharmaceutical industry. In this work, a novel mathematic model for the hybrid flow shop scheduling problem with unrelated parallel machine(HFSPUPM) was proposed. Additionally, an effective hybrid estimation of distribution algorithm was proposed to solve the HFSPUPM, taking advantage of the features in the mathematic model. In the optimization algorithm, a new individual representation method was adopted. The(EDA) structure was used for global search while the teaching learning based optimization(TLBO) strategy was used for local search. Based on the structure of the HFSPUPM, this work presents a series of discrete operations. Simulation results show the effectiveness of the proposed hybrid algorithm compared with other algorithms. 展开更多
关键词 车间调度问题 分布估计算法 混合估计 并行机 流水 组合优化问题 求解 数学模型
下载PDF
Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop 被引量:1
6
作者 Wangming Li Dong Han +2 位作者 Liang Gao Xinyu Li Yang Li 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2022年第1期112-131,共20页
The connection between production scheduling and transportation scheduling is getting closer in smart manufacturing system, and both of those problems are summarized as NP-hard problems. However, only a few studies ha... The connection between production scheduling and transportation scheduling is getting closer in smart manufacturing system, and both of those problems are summarized as NP-hard problems. However, only a few studies have considered them simultaneously. This paper solves the integrated production and transportation scheduling problem(IPTSP) in hybrid flow shops, which is an extension of the hybrid flow shop scheduling problem(HFSP). In addition to the production scheduling on machines, the transportation scheduling process on automated guided vehicles(AGVs)is considered as another optimization process. In this problem, the transfer tasks of jobs are performed by a certain number of AGVs. To solve it, we make some preparation(including the establishment of task pool, the new solution representation and the new solution evaluation), which can ensure that satisfactory solutions can be found efficiently while appropriately reducing the scale of search space. Then, an effective genetic tabu search algorithm is used to minimize the makespan. Finally, two groups of instances are designed and three types of experiments are conducted to evaluate the performance of the proposed method. The results show that the proposed method is effective to solve the integrated production and transportation scheduling problem. 展开更多
关键词 Hybrid flow shop Integrated scheduling Task pool Hybrid algorithm
下载PDF
Anomalies in Special Permutation Flow Shop Scheduling Problems 被引量:1
7
作者 Lin Gui Liang Gao Xinyu Li 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2020年第3期53-59,共7页
Recent researches show that there are some anomalies,which are not satisfied with common sense,appearing in some special permutation flow shop scheduling problems(PFSPs).These anomalies can be divided into three diffe... Recent researches show that there are some anomalies,which are not satisfied with common sense,appearing in some special permutation flow shop scheduling problems(PFSPs).These anomalies can be divided into three different types,such as changing the processing time of some operations,changing the number of total jobs and changing the number of total machines.This paper summarizes these three types of anomalies showing in the special PFSPs and gives some examples to make them better understood.The extended critical path is proposed and the reason why these anomalies happen in special PFSPs is given:anomalies will occur in these special PFSPs when the time of the operations on the reverse critical path changes.After that,the further reason for these anomalies is presented that when any one of these three types of anomalies happens,the original constraint in the special PFSPs is destroyed,which makes the anomalies appear.Finally,the application of these anomalies in production practice is given through examples and also with the possible research directions.The main contribution of this research is analyzing the intial reason why the anomalies appear in special PFSPs and pointing out the application and the possible research directions of all these three types of anomalies. 展开更多
关键词 scheduling Permutation flow shop ANOMALY
下载PDF
An effective discrete artificial bee colony algorithm for flow shop scheduling problem with intermediate buffers 被引量:3
8
作者 张素君 顾幸生 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第9期3471-3484,共14页
An effective discrete artificial bee colony(DABC) algorithm is proposed for the flow shop scheduling problem with intermediate buffers(IBFSP) in order to minimize the maximum completion time(i.e makespan). The effecti... An effective discrete artificial bee colony(DABC) algorithm is proposed for the flow shop scheduling problem with intermediate buffers(IBFSP) in order to minimize the maximum completion time(i.e makespan). The effective combination of the insertion and swap operator is applied to producing neighborhood individual at the employed bee phase. The tournament selection is adopted to avoid falling into local optima, while, the optimized insert operator embeds in onlooker bee phase for further searching the neighborhood solution to enhance the local search ability of algorithm. The tournament selection with size 2 is again applied and a better selected solution will be performed destruction and construction of iterated greedy(IG) algorithm, and then the result replaces the worse one. Simulation results show that our algorithm has a better performance compared with the HDDE and CHS which were proposed recently. It provides the better known solutions for the makespan criterion to flow shop scheduling problem with limited buffers for the Car benchmark by Carlier and Rec benchmark by Reeves. The convergence curves show that the algorithm not only has faster convergence speed but also has better convergence value. 展开更多
关键词 车间调度问题 有限缓冲区 群算法 流水 应用 离散 最大完工时间 局部搜索能力
下载PDF
Flow shop rescheduling problem under rush orders 被引量:2
9
作者 胡燕海 严隽琪 +1 位作者 叶飞帆 于军合 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2005年第10期1040-1046,共7页
In the environment of customization, disturbances such as rush orders and material shortages often occur in the manufacturing system, so rescheduling is necessary for the manufacturing system. The rescheduling methodo... In the environment of customization, disturbances such as rush orders and material shortages often occur in the manufacturing system, so rescheduling is necessary for the manufacturing system. The rescheduling methodology should be able to dispose of the disturbance efficiently so as to keep production going smoothly. This aims researching flow shop rescheduling problem (FSRP) necessitated by rush orders. Disjunctive graph is employed to demonstrate the FSRP. For a flow shop processing n jobs, after the original schedule has been made, and z out of n jobs have been processed in the flow shop, x rush orders come, so the original n jobs together with x rush orders should be rescheduled immediately so that the rush orders would be processed in the shortest time and the original jobs could be processed subject to some optimized criteria. The weighted mean flow time of both original jobs and rush orders is used as objective function. The weight for rush orders is much bigger than that of the original jobs, so the rush orders should be processed early in the new schedule. The ant colony optimization (ACO) algorithm used to solve the rescheduling problem has a weakness in that the search may fall into a local optimum. Mutation operation is employed to enhance the ACO performance. Numerical experiments demonstrated that the proposed algorithm has high computation repeatability and efficiency. 展开更多
关键词 最优化标准 动态时序安排 群体优化 突变操作
下载PDF
A Novel Particle Swarm Optimization for Flow Shop Scheduling with Fuzzy Processing Time 被引量:1
10
作者 牛群 顾幸生 《Journal of Donghua University(English Edition)》 EI CAS 2008年第2期115-122,共8页
Since in most practical cases the processing time of scheduling is not deterministic, flow shop scheduling model with fuzzy processing time is established. It is assumed that the processing times of jobs on the machin... Since in most practical cases the processing time of scheduling is not deterministic, flow shop scheduling model with fuzzy processing time is established. It is assumed that the processing times of jobs on the machines are described by triangular fuzzy sets. In order to find a sequence that minimizes the mean makespan and the spread of the makespan, Lee and Li fuzzy ranking method is adopted and modified to solve the problem. Particle swarm optimization (PSO) is a population-based stochastic approximation algorithm that has been applied to a wide range of problems, but there is little reported in respect of application to scheduling problems because of its unsuitability for them. In the paper, PSO is redefined and modified by introducing genetic operations such as crossover and mutation to update the particles, which is called GPSO and successfully employed to solve the formulated problem. A series of benchmarks with fuzzy processing time are used to verify GPSO. Extensive experiments show the feasibility and effectiveness of the proposed method. 展开更多
关键词 旅行商问题 数学规划 粒子群最优化 模糊处理时间
下载PDF
A two-stage flexible flow-shop scheduling problem with m identical parallel machines on one stage and a batch processor on the other stage 被引量:1
11
作者 何龙敏 孙世杰 程明宝 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2008年第5期674-678,共5页
This paper considers a hybrid two-stage flow-shop scheduling problem with m identical parallel machines on one stage and a batch processor on the other stage. The processing time of job Jj on any of m identical parall... This paper considers a hybrid two-stage flow-shop scheduling problem with m identical parallel machines on one stage and a batch processor on the other stage. The processing time of job Jj on any of m identical parallel machines is aj≡ a (j∈N), and the processing time of job Jj is bj(j∈N) on a batch processor M. We take makespan (Cmax) as our minimization objective. In this paper, for the problem of FSMP-BI (m identical parallel machines on the first stage and a batch processor on the second stage), based on the algorithm given by Sung and Choung for the problem of 1| rj, BI | Cmax under the constraint of the given processing sequence, we develop an optimal dynamic programming Algorithm H1 for it in max{O(nlogn), O(nB)} time. A max{O(nlogn), O(nB)} time symmetric Algorithm H2 is given then for the problem of BI-FSMP (a batch processor on the first stage and m identical parallel machines on the second stage). 展开更多
关键词 平行性 最佳算法 分批处理 数学分析
下载PDF
MODIFIED BOTTLENECK-BASED PROCEDURE FOR LARGE-SCALE FLOW-SHOP SCHEDULING PROBLEMS WITH BOTTLENECK
12
作者 ZUO Yan GU Hanyu XI Yugeng 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2006年第3期356-361,共6页
A new bottleneck-based heuristic for large-scale flow-shop scheduling problems with a bottleneck is proposed, which is simpler but more tailored than the shifting bottleneck (SB) procedure. In this algorithm, a sche... A new bottleneck-based heuristic for large-scale flow-shop scheduling problems with a bottleneck is proposed, which is simpler but more tailored than the shifting bottleneck (SB) procedure. In this algorithm, a schedule for the bottleneck machine is first constructed optimally and then the non-bottleneck machines are scheduled around the bottleneck schedule by some effective dispatching rules. Computational results show that the modified bottleneck-based procedure can achieve a tradeoff between solution quality and computational time comparing with SB procedure for medium-size problems. Furthermore it can obtain a good solution in quite short time for large-scale scheduling problems. 展开更多
关键词 flow-shop scheduling problem Heuristic Bottleneck machine
下载PDF
Scheduling on 2-Machine Flow Shops Considering Disturbance on Job Processing Times
13
作者 Bo Guo Yasuo NonakaDepartment of Industrial Management and Engineering, Science University of Tokyo, 1-3 Kagurazaka, Shinjuku-ku, Tokyo 162, Japan 《International Journal of Plant Engineering and Management》 1998年第1期6-13,共8页
In this paper the scheduling problem to minimize the expected makespan is discussed on two-machine flow shops with random disturbance on job processing times. The problem is represented by a stochastic programming mod... In this paper the scheduling problem to minimize the expected makespan is discussed on two-machine flow shops with random disturbance on job processing times. The problem is represented by a stochastic programming model. We approximate the stochastic problem by a deterministic problem which can be solved by Johnson's rule. The estimation of approximation error is also discussed by analyzing the stochastic model and its approximate LP model. 展开更多
关键词 scheduling flow shops stochastic disturbance
下载PDF
MULTI-SHOP SCHEDULING PROBLEM 被引量:2
14
作者 HU Yanhai YAN Junqi +2 位作者 MA Dengzhe YE Feifan ZHANG Jie 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2007年第3期109-112,共4页
A new concept of multi-shop (M ) is put forward which contains all basic shops including open shop (O), job shop (J ), flow shop (F ) and hybrid flow shop (H ) so that these basic shop can be scheduled toget... A new concept of multi-shop (M ) is put forward which contains all basic shops including open shop (O), job shop (J ), flow shop (F ) and hybrid flow shop (H ) so that these basic shop can be scheduled together. Several algorithms including ant colony optimization (ACO), most work remaining (MWR), least work remaining (LWR), longest processing time (LPT) and shortest processing time (SPT) are used for scheduling the M. Numerical experiments of the M adopting data of some car and reC series benchmark instances are tested. The results show that the ACO algorithm has better performance for scheduling the M than the other algorithms, if minimizing the makespan ( Cmax^*) is taken as the objective function. As a comparison, the separate shops contained in the M are also scheduled by the ACO algorithm for the same objective function, when the completing time of the jobs in the previous shop is taken as the ready time of these jobs in the following shop. The results show that the M has the advantage of shortening the makespan upon separate shops. 展开更多
关键词 Multi-shop scheduling Mixed shop Hybrid flow shop HEURISTICS
下载PDF
基于遗传算法的混合Flow-shop调度方法 被引量:46
15
作者 王万良 姚明海 +1 位作者 吴云高 吴启迪 《系统仿真学报》 CAS CSCD 2002年第7期863-865,869,共4页
混合Flow-shop调度问题 (Hybrid flow-shop scheduling problem, HFSP),是一般Flow-shop调度问题的推广,由于在某些工序上存在并行机器,所以比一般的Flow-shop调度问题更复杂。本文提出了遗传算法求解混合Flow-shop调度问题的方法,给出... 混合Flow-shop调度问题 (Hybrid flow-shop scheduling problem, HFSP),是一般Flow-shop调度问题的推广,由于在某些工序上存在并行机器,所以比一般的Flow-shop调度问题更复杂。本文提出了遗传算法求解混合Flow-shop调度问题的方法,给出了一种新的编码方法,设计了相应的交叉和变异操作算子,能够保证个体的合法性,同时又具有遗传算法本身所要求的随机性。最后给出了某汽车发动机厂金加工车间的生产调度实例,表明了此算法的有效性。 展开更多
关键词 遗传算法 混合flow-shop调度问题 组合优化问题 数学规划
下载PDF
两机flow-shop类型模具热处理车间批调度算法 被引量:11
16
作者 黄锦钿 刘建军 +1 位作者 陈庆新 毛宁 《计算机集成制造系统》 EI CSCD 北大核心 2014年第7期1665-1674,共10页
总结模具热处理车间生产调度的特点,在工件动态到达的情况下,研究了两阶段均为批处理机、各批次加工时间为定值的流水车间批调度问题。以最小化最大完成时间为目标建立混合整数规划数学模型,证明问题是NP难并给出最优目标函数值的下界,... 总结模具热处理车间生产调度的特点,在工件动态到达的情况下,研究了两阶段均为批处理机、各批次加工时间为定值的流水车间批调度问题。以最小化最大完成时间为目标建立混合整数规划数学模型,证明问题是NP难并给出最优目标函数值的下界,构建并证明一种求解大规模问题最优解的算法。算法首先求解分批数量上下界,然后构造数学模型并求解在给定分批数量下对应的最优解,最后通过对比各给定分批数量下得到的解并得到全局最优解。对于小规模问题,通过与传统分枝定界法得到的最优解相比较,说明所提算法能得到问题的最优解且计算时间更短;对于大规模问题,在不同生产状况下随机产生多组数据、对所提算法进行验证,结果显示该算法是有效的。 展开更多
关键词 批调度 模具 热处理 流水车间
下载PDF
基于混合差分进化的混排Flow-shop分批优化调度 被引量:7
17
作者 王海燕 赵燕伟 +2 位作者 张景玲 史文浩 张立萍 《计算机集成制造系统》 EI CSCD 北大核心 2013年第7期1613-1625,共13页
考虑到实际环境中的订单批量性,研究Flow-shop制造过程分批优化调度。针对制造过程中不同产品所含批量之间允许交叉生产的情况,考虑传输批量大小约束,建立了问题模型。基于分批生产策略设计了一种混合差分进化算法来优化确定批量划分和... 考虑到实际环境中的订单批量性,研究Flow-shop制造过程分批优化调度。针对制造过程中不同产品所含批量之间允许交叉生产的情况,考虑传输批量大小约束,建立了问题模型。基于分批生产策略设计了一种混合差分进化算法来优化确定批量划分和排序优化。该算法采用两级染色体编码,对划分染色体和排序染色体分别采用前面所设计的进化过程。为了进一步缩短完工时间,在算法解码过程中基于分批传输策略进行二次划分,得到小传输子批。通过实验仿真对所提方法进行比较分析,验证了所设计划分方法的有效性以及算法的优化性能。 展开更多
关键词 流水车间 分批优化调度 差分进化算法 局部搜索
下载PDF
Flow-shop调度问题的遗传启发算法 被引量:19
18
作者 黄宇纯 王树青 王骥程 《信息与控制》 CSCD 北大核心 1996年第4期212-216,共5页
结合遗传算法和启发式规则,构造了一种新的遗传启发搜索算法,用于求解Flow-shop调度问题.通过分析和实例计算表明,算法能够有效地适用于大规模加工过程中调度问题的优化计算,在运行时间,适应性和最优率等方面都具有很好... 结合遗传算法和启发式规则,构造了一种新的遗传启发搜索算法,用于求解Flow-shop调度问题.通过分析和实例计算表明,算法能够有效地适用于大规模加工过程中调度问题的优化计算,在运行时间,适应性和最优率等方面都具有很好的搜索优势. 展开更多
关键词 Folw-shop调度 最优加工时间 遗传算法 算法
下载PDF
柔性Flow-Shop调度的遗传算法优化 被引量:18
19
作者 周辉仁 唐万生 魏颖辉 《计算机工程与应用》 CSCD 北大核心 2009年第30期224-226,233,共4页
柔性Flow-shop调度问题(Flexible Flow-shop Scheduling Problem,FFSP)是一般Flow-shop调度问题的推广,由于在某些工序上存在并行机器,所以比一般的Flow-shop调度问题更复杂。为了有效地解决柔性Flow-shop调度问题,用遗传算法求解,给出... 柔性Flow-shop调度问题(Flexible Flow-shop Scheduling Problem,FFSP)是一般Flow-shop调度问题的推广,由于在某些工序上存在并行机器,所以比一般的Flow-shop调度问题更复杂。为了有效地解决柔性Flow-shop调度问题,用遗传算法求解,给出了一种改进的编码方法,能够保证个体的合法性;并根据编码方法提出了矩阵解码方法。最后以某汽车发动机厂金加工车间的生产调度实例进行仿真,通过比较表明了算法的有效性。 展开更多
关键词 柔性flow-shop调度 遗传算法 编码方法 矩阵解码
下载PDF
改进协同粒子群优化算法及其在FlowShop调度中的应用 被引量:10
20
作者 虞斌能 焦斌 顾幸生 《华东理工大学学报(自然科学版)》 CAS CSCD 北大核心 2009年第3期468-474,共7页
针对协同粒子群优化算法存在的停滞现象,提出了一种改进的协同粒子群优化算法。采用优化法的子群协作方式,既保证了收敛速率,又可以防止陷入局部最优。同时引入综合学习策略,增加种群的多样性,防止种群出现停滞现象。在此基础上,又加入... 针对协同粒子群优化算法存在的停滞现象,提出了一种改进的协同粒子群优化算法。采用优化法的子群协作方式,既保证了收敛速率,又可以防止陷入局部最优。同时引入综合学习策略,增加种群的多样性,防止种群出现停滞现象。在此基础上,又加入了扰动机制,进一步避免算法陷入局部最优。采用该算法对3个经典函数进行测试,并将其应用于Flow Shop调度问题,仿真实验结果表明:新算法有效克服了停滞现象,增强了全局搜索能力,比基本协同粒子群优化算法的优化性能更好。 展开更多
关键词 粒子群优化算法 协同 优化 flowshop调度
下载PDF
上一页 1 2 38 下一页 到第
使用帮助 返回顶部