期刊文献+
共找到762篇文章
< 1 2 39 >
每页显示 20 50 100
Q-Learning-Assisted Meta-Heuristics for Scheduling Distributed Hybrid Flow Shop Problems
1
作者 Qianyao Zhu Kaizhou Gao +2 位作者 Wuze Huang Zhenfang Ma Adam Slowik 《Computers, Materials & Continua》 SCIE EI 2024年第9期3573-3589,共17页
The flow shop scheduling problem is important for the manufacturing industry.Effective flow shop scheduling can bring great benefits to the industry.However,there are few types of research on Distributed Hybrid Flow S... The flow shop scheduling problem is important for the manufacturing industry.Effective flow shop scheduling can bring great benefits to the industry.However,there are few types of research on Distributed Hybrid Flow Shop Problems(DHFSP)by learning assisted meta-heuristics.This work addresses a DHFSP with minimizing the maximum completion time(Makespan).First,a mathematical model is developed for the concerned DHFSP.Second,four Q-learning-assisted meta-heuristics,e.g.,genetic algorithm(GA),artificial bee colony algorithm(ABC),particle swarm optimization(PSO),and differential evolution(DE),are proposed.According to the nature of DHFSP,six local search operations are designed for finding high-quality solutions in local space.Instead of randomselection,Q-learning assists meta-heuristics in choosing the appropriate local search operations during iterations.Finally,based on 60 cases,comprehensive numerical experiments are conducted to assess the effectiveness of the proposed algorithms.The experimental results and discussions prove that using Q-learning to select appropriate local search operations is more effective than the random strategy.To verify the competitiveness of the Q-learning assistedmeta-heuristics,they are compared with the improved iterated greedy algorithm(IIG),which is also for solving DHFSP.The Friedman test is executed on the results by five algorithms.It is concluded that the performance of four Q-learning-assisted meta-heuristics are better than IIG,and the Q-learning-assisted PSO shows the best competitiveness. 展开更多
关键词 Distributed scheduling hybrid flow shop META-HEURISTICS local search Q-LEARNING
下载PDF
An Elite-Class Teaching-Learning-Based Optimization for Reentrant Hybrid Flow Shop Scheduling with Bottleneck Stage
2
作者 Deming Lei Surui Duan +1 位作者 Mingbo Li Jing Wang 《Computers, Materials & Continua》 SCIE EI 2024年第4期47-63,共17页
Bottleneck stage and reentrance often exist in real-life manufacturing processes;however,the previous research rarely addresses these two processing conditions in a scheduling problem.In this study,a reentrant hybrid ... Bottleneck stage and reentrance often exist in real-life manufacturing processes;however,the previous research rarely addresses these two processing conditions in a scheduling problem.In this study,a reentrant hybrid flow shop scheduling problem(RHFSP)with a bottleneck stage is considered,and an elite-class teaching-learning-based optimization(ETLBO)algorithm is proposed to minimize maximum completion time.To produce high-quality solutions,teachers are divided into formal ones and substitute ones,and multiple classes are formed.The teacher phase is composed of teacher competition and teacher teaching.The learner phase is replaced with a reinforcement search of the elite class.Adaptive adjustment on teachers and classes is established based on class quality,which is determined by the number of elite solutions in class.Numerous experimental results demonstrate the effectiveness of new strategies,and ETLBO has a significant advantage in solving the considered RHFSP. 展开更多
关键词 Hybrid flow shop scheduling REENTRANT bottleneck stage teaching-learning-based optimization
下载PDF
A Discrete Artificial Bee Colony Algorithm for Minimizing the Total Flow Time in the Blocking Flow Shop Scheduling 被引量:10
3
作者 邓冠龙 徐震浩 顾幸生 《Chinese Journal of Chemical Engineering》 SCIE EI CAS CSCD 2012年第6期1067-1073,共7页
A discrete artificial bee colony algorithm is proposed for solving the blocking flow shop scheduling problem with total flow time criterion. Firstly, the solution in the algorithm is represented as job permutation. Se... A discrete artificial bee colony algorithm is proposed for solving the blocking flow shop scheduling problem with total flow time criterion. Firstly, the solution in the algorithm is represented as job permutation. Secondly, an initialization scheme based on a variant of the NEH (Nawaz-Enscore-Ham) heuristic and a local search is designed to construct the initial population with both quality and diversity. Thirdly, based on the idea of iterated greedy algorithm, some newly designed schemes for employed bee, onlooker bee and scout bee are presented. The performance of the proposed algorithm is tested on the well-known Taillard benchmark set, and the computational results demonstrate the effectiveness of the discrete artificial bee colony algorithm. In addition, the best known solutions of the benchmark set are provided for the blocking flow shop scheduling problem with total flow time criterion. 展开更多
关键词 blocking flow shop scheduling artificial bee colony algorithm total flow time
下载PDF
A Decomposition and Coordination Scheduling Method for Flow-shop Problem Based on TOC 被引量:7
4
作者 张宏远 席裕庚 谷寒雨 《自动化学报》 EI CSCD 北大核心 2005年第2期182-187,共6页
There are many flow shop problems of throughput (denoted by FSPT) with constraints of due date in real production planning and scheduling. In this paper, a decomposition and coordination algorithm is proposed based on... There are many flow shop problems of throughput (denoted by FSPT) with constraints of due date in real production planning and scheduling. In this paper, a decomposition and coordination algorithm is proposed based on the analysis of FSPT and under the support of TOC (theory of constraint). A flow shop is at first decomposed into two subsystems named PULL and PUSH by means of bottleneck. Then the subsystem is decomposed into single machine scheduling problems,so the original NP-HARD problem can be transferred into a serial of single machine optimization problems finally. This method reduces the computational complexity, and has been used in a real project successfully. 展开更多
关键词 约束理论 flow-shop分解协调算法 TOC 瓶颈
下载PDF
Integrated Production and Transportation Scheduling Method in Hybrid Flow Shop 被引量:2
5
作者 Wangming Li Dong Han +2 位作者 Liang Gao Xinyu Li Yang Li 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2022年第1期112-131,共20页
The connection between production scheduling and transportation scheduling is getting closer in smart manufacturing system, and both of those problems are summarized as NP-hard problems. However, only a few studies ha... The connection between production scheduling and transportation scheduling is getting closer in smart manufacturing system, and both of those problems are summarized as NP-hard problems. However, only a few studies have considered them simultaneously. This paper solves the integrated production and transportation scheduling problem(IPTSP) in hybrid flow shops, which is an extension of the hybrid flow shop scheduling problem(HFSP). In addition to the production scheduling on machines, the transportation scheduling process on automated guided vehicles(AGVs)is considered as another optimization process. In this problem, the transfer tasks of jobs are performed by a certain number of AGVs. To solve it, we make some preparation(including the establishment of task pool, the new solution representation and the new solution evaluation), which can ensure that satisfactory solutions can be found efficiently while appropriately reducing the scale of search space. Then, an effective genetic tabu search algorithm is used to minimize the makespan. Finally, two groups of instances are designed and three types of experiments are conducted to evaluate the performance of the proposed method. The results show that the proposed method is effective to solve the integrated production and transportation scheduling problem. 展开更多
关键词 Hybrid flow shop Integrated scheduling Task pool Hybrid algorithm
下载PDF
Anomalies in Special Permutation Flow Shop Scheduling Problems 被引量:2
6
作者 Lin Gui Liang Gao Xinyu Li 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2020年第3期53-59,共7页
Recent researches show that there are some anomalies,which are not satisfied with common sense,appearing in some special permutation flow shop scheduling problems(PFSPs).These anomalies can be divided into three diffe... Recent researches show that there are some anomalies,which are not satisfied with common sense,appearing in some special permutation flow shop scheduling problems(PFSPs).These anomalies can be divided into three different types,such as changing the processing time of some operations,changing the number of total jobs and changing the number of total machines.This paper summarizes these three types of anomalies showing in the special PFSPs and gives some examples to make them better understood.The extended critical path is proposed and the reason why these anomalies happen in special PFSPs is given:anomalies will occur in these special PFSPs when the time of the operations on the reverse critical path changes.After that,the further reason for these anomalies is presented that when any one of these three types of anomalies happens,the original constraint in the special PFSPs is destroyed,which makes the anomalies appear.Finally,the application of these anomalies in production practice is given through examples and also with the possible research directions.The main contribution of this research is analyzing the intial reason why the anomalies appear in special PFSPs and pointing out the application and the possible research directions of all these three types of anomalies. 展开更多
关键词 scheduling Permutation flow shop ANOMALY
下载PDF
Flow shop rescheduling problem under rush orders 被引量:2
7
作者 胡燕海 严隽琪 +1 位作者 叶飞帆 于军合 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2005年第10期1040-1046,共7页
In the environment of customization, disturbances such as rush orders and material shortages often occur in the manufacturing system, so rescheduling is necessary for the manufacturing system. The rescheduling methodo... In the environment of customization, disturbances such as rush orders and material shortages often occur in the manufacturing system, so rescheduling is necessary for the manufacturing system. The rescheduling methodology should be able to dispose of the disturbance efficiently so as to keep production going smoothly. This aims researching flow shop rescheduling problem (FSRP) necessitated by rush orders. Disjunctive graph is employed to demonstrate the FSRP. For a flow shop processing n jobs, after the original schedule has been made, and z out of n jobs have been processed in the flow shop, x rush orders come, so the original n jobs together with x rush orders should be rescheduled immediately so that the rush orders would be processed in the shortest time and the original jobs could be processed subject to some optimized criteria. The weighted mean flow time of both original jobs and rush orders is used as objective function. The weight for rush orders is much bigger than that of the original jobs, so the rush orders should be processed early in the new schedule. The ant colony optimization (ACO) algorithm used to solve the rescheduling problem has a weakness in that the search may fall into a local optimum. Mutation operation is employed to enhance the ACO performance. Numerical experiments demonstrated that the proposed algorithm has high computation repeatability and efficiency. 展开更多
关键词 flow shop rescheduling Dynamic scheduling Rush order Ant colony optimization Mutation operation
下载PDF
An effective discrete artificial bee colony algorithm for flow shop scheduling problem with intermediate buffers 被引量:3
8
作者 张素君 顾幸生 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第9期3471-3484,共14页
An effective discrete artificial bee colony(DABC) algorithm is proposed for the flow shop scheduling problem with intermediate buffers(IBFSP) in order to minimize the maximum completion time(i.e makespan). The effecti... An effective discrete artificial bee colony(DABC) algorithm is proposed for the flow shop scheduling problem with intermediate buffers(IBFSP) in order to minimize the maximum completion time(i.e makespan). The effective combination of the insertion and swap operator is applied to producing neighborhood individual at the employed bee phase. The tournament selection is adopted to avoid falling into local optima, while, the optimized insert operator embeds in onlooker bee phase for further searching the neighborhood solution to enhance the local search ability of algorithm. The tournament selection with size 2 is again applied and a better selected solution will be performed destruction and construction of iterated greedy(IG) algorithm, and then the result replaces the worse one. Simulation results show that our algorithm has a better performance compared with the HDDE and CHS which were proposed recently. It provides the better known solutions for the makespan criterion to flow shop scheduling problem with limited buffers for the Car benchmark by Carlier and Rec benchmark by Reeves. The convergence curves show that the algorithm not only has faster convergence speed but also has better convergence value. 展开更多
关键词 discrete artificial bee colony algorithm flow shop scheduling problem with intermediate buffers destruction and construction tournament selection
下载PDF
A Cross Entropy-Genetic Algorithm for m-Machines No-Wait Job-ShopScheduling Problem 被引量:5
9
作者 Budi Santosa Muhammad Arif Budiman Stefanus Eko Wiratno 《Journal of Intelligent Learning Systems and Applications》 2011年第3期171-180,共10页
No-wait job-shop scheduling (NWJSS) problem is one of the classical scheduling problems that exist on many kinds of industry with no-wait constraint, such as metal working, plastic, chemical, and food industries. Seve... No-wait job-shop scheduling (NWJSS) problem is one of the classical scheduling problems that exist on many kinds of industry with no-wait constraint, such as metal working, plastic, chemical, and food industries. Several methods have been proposed to solve this problem, both exact (i.e. integer programming) and metaheuristic methods. Cross entropy (CE), as a new metaheuristic, can be an alternative method to solve NWJSS problem. This method has been used in combinatorial optimization, as well as multi-external optimization and rare-event simulation. On these problems, CE implementation results an optimal value with less computational time in average. However, using original CE to solve large scale NWJSS requires high computational time. Considering this shortcoming, this paper proposed a hybrid of cross entropy with genetic algorithm (GA), called CEGA, on m-machines NWJSS. The results are compared with other metaheuritics: Genetic Algorithm-Simulated Annealing (GASA) and hybrid tabu search. The results showed that CEGA providing better or at least equal makespans in comparison with the other two methods. 展开更多
关键词 no-wait JOB shop scheduling Cross ENTROPY GENETIC Algorithm Combinatorial Optimization
下载PDF
Differential evolution algorithm for hybrid flow-shop scheduling problems 被引量:9
10
作者 Ye Xu Ling Wang 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2011年第5期794-798,共5页
Aiming at the hybrid flow-shop (HFS) scheduling that is a complex NP-hard combinatorial problem with wide engineering background, an effective algorithm based on differential evolution (DE) is proposed. By using a... Aiming at the hybrid flow-shop (HFS) scheduling that is a complex NP-hard combinatorial problem with wide engineering background, an effective algorithm based on differential evolution (DE) is proposed. By using a special encoding scheme and combining DE based evolutionary search and local search, the exploration and exploitation abilities are enhanced and well balanced for solving the HFS problems. Simulation results based on some typical problems and comparisons with some existing genetic algorithms demonstrate the proposed algorithm is effective, efficient and robust for solving the HFS problems. 展开更多
关键词 hybrid flow-shop (HFS) scheduling differential evolution (DE) local search.
下载PDF
A novel hybrid estimation of distribution algorithm for solving hybrid flowshop scheduling problem with unrelated parallel machine 被引量:9
11
作者 孙泽文 顾幸生 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第8期1779-1788,共10页
The hybrid flow shop scheduling problem with unrelated parallel machine is a typical NP-hard combinatorial optimization problem, and it exists widely in chemical, manufacturing and pharmaceutical industry. In this wor... The hybrid flow shop scheduling problem with unrelated parallel machine is a typical NP-hard combinatorial optimization problem, and it exists widely in chemical, manufacturing and pharmaceutical industry. In this work, a novel mathematic model for the hybrid flow shop scheduling problem with unrelated parallel machine(HFSPUPM) was proposed. Additionally, an effective hybrid estimation of distribution algorithm was proposed to solve the HFSPUPM, taking advantage of the features in the mathematic model. In the optimization algorithm, a new individual representation method was adopted. The(EDA) structure was used for global search while the teaching learning based optimization(TLBO) strategy was used for local search. Based on the structure of the HFSPUPM, this work presents a series of discrete operations. Simulation results show the effectiveness of the proposed hybrid algorithm compared with other algorithms. 展开更多
关键词 hybrid estimation of distribution algorithm teaching learning based optimization strategy hybrid flow shop unrelated parallel machine scheduling
下载PDF
Combined Timetabling Procedure and Complete Local Search for No-Wait Job Shop Scheduling with Total Tardiness 被引量:1
12
作者 杨玉珍 顾幸生 《Journal of Donghua University(English Edition)》 EI CAS 2014年第2期83-91,共9页
The strong non-deterministic polynomial-hard( NP-hard)character of job shop scheduling problem( JSSP) has been acknowledged widely and it becomes stronger when attaches the nowait constraint,which widely exists in man... The strong non-deterministic polynomial-hard( NP-hard)character of job shop scheduling problem( JSSP) has been acknowledged widely and it becomes stronger when attaches the nowait constraint,which widely exists in many production processes,such as chemistry process, metallurgical process. However,compared with the massive research on traditional job shop problem,little attention has been paid on the no-wait constraint.Therefore,in this paper, we have dealt with this problem by decomposing it into two sub-problems, the timetabling and sequencing problems,in traditional frame work. A new efficient combined non-order timetabling method,coordinated with objective of total tardiness,is proposed for the timetabling problems. As for the sequencing one,we have presented a modified complete local search with memory combined by crossover operator and distance counting. The entire algorithm was tested on well-known benchmark problems and compared with several existing algorithms.Computational experiments showed that our proposed algorithm performed both effectively and efficiently. 展开更多
关键词 job shop scheduling no-wait TIMETABLING TARDINESS complete local search with memory
下载PDF
A Novel Particle Swarm Optimization for Flow Shop Scheduling with Fuzzy Processing Time 被引量:1
13
作者 牛群 顾幸生 《Journal of Donghua University(English Edition)》 EI CAS 2008年第2期115-122,共8页
Since in most practical cases the processing time of scheduling is not deterministic, flow shop scheduling model with fuzzy processing time is established. It is assumed that the processing times of jobs on the machin... Since in most practical cases the processing time of scheduling is not deterministic, flow shop scheduling model with fuzzy processing time is established. It is assumed that the processing times of jobs on the machines are described by triangular fuzzy sets. In order to find a sequence that minimizes the mean makespan and the spread of the makespan, Lee and Li fuzzy ranking method is adopted and modified to solve the problem. Particle swarm optimization (PSO) is a population-based stochastic approximation algorithm that has been applied to a wide range of problems, but there is little reported in respect of application to scheduling problems because of its unsuitability for them. In the paper, PSO is redefined and modified by introducing genetic operations such as crossover and mutation to update the particles, which is called GPSO and successfully employed to solve the formulated problem. A series of benchmarks with fuzzy processing time are used to verify GPSO. Extensive experiments show the feasibility and effectiveness of the proposed method. 展开更多
关键词 flow shop scheduling FUZZY PSO
下载PDF
Flow Shop Scheduling Problem with Convex Resource Allocation and Learning Effect 被引量:1
14
作者 Xinna Geng Jibo Wang Chou-Jung Hsu 《Journal of Computer and Communications》 2018年第1期239-246,共8页
In this paper, we consider the no-wait two-machine scheduling problem with convex resource allocation and learning effect under the condition of common due date assignment. We take the total earliness, tardiness and c... In this paper, we consider the no-wait two-machine scheduling problem with convex resource allocation and learning effect under the condition of common due date assignment. We take the total earliness, tardiness and common due date cost as the objective function, and find the optimal common due date, the resource allocation and the schedule of jobs to make the objective function minimum under the constraint condition that the total resource is limited. The corresponding algorithm is given and proved that the problem can be solved in polynomial time. 展开更多
关键词 Learning Effect no-wait flow shop CONVEX RESOURCE ALLOCATION
下载PDF
Competitive and Cooperative-Based Strength Pareto Evolutionary Algorithm for Green Distributed Heterogeneous Flow Shop Scheduling
15
作者 Kuihua Huang Rui Li +2 位作者 Wenyin Gong Weiwei Bian Rui Wang 《Intelligent Automation & Soft Computing》 SCIE 2023年第8期2077-2101,共25页
This work aims to resolve the distributed heterogeneous permutation flow shop scheduling problem(DHPFSP)with minimizing makespan and total energy consumption(TEC).To solve this NP-hard problem,this work proposed a com... This work aims to resolve the distributed heterogeneous permutation flow shop scheduling problem(DHPFSP)with minimizing makespan and total energy consumption(TEC).To solve this NP-hard problem,this work proposed a competitive and cooperative-based strength Pareto evolutionary algorithm(CCSPEA)which contains the following features:1)An initialization based on three heuristic rules is developed to generate a population with great diversity and convergence.2)A comprehensive metric combining convergence and diversity metrics is used to better represent the heuristic information of a solution.3)A competitive selection is designed which divides the population into a winner and a loser swarms based on the comprehensive metric.4)A cooperative evolutionary schema is proposed for winner and loser swarms to accelerate the convergence of global search.5)Five local search strategies based on problem knowledge are designed to improve convergence.6)Aproblem-based energy-saving strategy is presented to reduce TEC.Finally,to evaluate the performance of CCSPEA,it is compared to four state-of-art and run on 22 instances based on the Taillard benchmark.The numerical experiment results demonstrate that 1)the proposed comprehensive metric can efficiently represent the heuristic information of each solution to help the later step divide the population.2)The global search based on the competitive and cooperative schema can accelerate loser solutions convergence and further improve the winner’s exploration.3)The problembased initialization,local search,and energy-saving strategies can efficiently reduce the makespan and TEC.4)The proposed CCSPEA is superior to the state-of-art for solving DHPFSP. 展开更多
关键词 Distributed heterogeneous flow shop scheduling green scheduling SPEA2 competitive and cooperative
下载PDF
MODIFIED BOTTLENECK-BASED PROCEDURE FOR LARGE-SCALE FLOW-SHOP SCHEDULING PROBLEMS WITH BOTTLENECK
16
作者 ZUO Yan GU Hanyu XI Yugeng 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2006年第3期356-361,共6页
A new bottleneck-based heuristic for large-scale flow-shop scheduling problems with a bottleneck is proposed, which is simpler but more tailored than the shifting bottleneck (SB) procedure. In this algorithm, a sche... A new bottleneck-based heuristic for large-scale flow-shop scheduling problems with a bottleneck is proposed, which is simpler but more tailored than the shifting bottleneck (SB) procedure. In this algorithm, a schedule for the bottleneck machine is first constructed optimally and then the non-bottleneck machines are scheduled around the bottleneck schedule by some effective dispatching rules. Computational results show that the modified bottleneck-based procedure can achieve a tradeoff between solution quality and computational time comparing with SB procedure for medium-size problems. Furthermore it can obtain a good solution in quite short time for large-scale scheduling problems. 展开更多
关键词 flow-shop scheduling problem Heuristic Bottleneck machine
下载PDF
Scheduling on 2-Machine Flow Shops Considering Disturbance on Job Processing Times
17
作者 Bo Guo Yasuo NonakaDepartment of Industrial Management and Engineering, Science University of Tokyo, 1-3 Kagurazaka, Shinjuku-ku, Tokyo 162, Japan 《International Journal of Plant Engineering and Management》 1998年第1期6-13,共8页
In this paper the scheduling problem to minimize the expected makespan is discussed on two-machine flow shops with random disturbance on job processing times. The problem is represented by a stochastic programming mod... In this paper the scheduling problem to minimize the expected makespan is discussed on two-machine flow shops with random disturbance on job processing times. The problem is represented by a stochastic programming model. We approximate the stochastic problem by a deterministic problem which can be solved by Johnson's rule. The estimation of approximation error is also discussed by analyzing the stochastic model and its approximate LP model. 展开更多
关键词 scheduling flow shops stochastic disturbance
下载PDF
Hybrid evolutionary algorithm for no-wait flow shops to minimize makespan and total flowtime 被引量:2
18
作者 廖小平 刘有根 李小平 《Journal of Southeast University(English Edition)》 EI CAS 2008年第4期450-454,共5页
The NP-hard no-wait flow shop scheduling problems with makespan and total flowtime minimization are considered. Objective increment properties of the problems are analyzed. A non-dominated classification method is int... The NP-hard no-wait flow shop scheduling problems with makespan and total flowtime minimization are considered. Objective increment properties of the problems are analyzed. A non-dominated classification method is introduced to class population individuals into Pareto fronts to improve searching efficiency. Besides investigating the crowding distance and the elitist solution strategy, two effective bi-criteria local search procedures based on objective increments are presented to improve searching effectiveness. Based on the properties and methods, a hybrid evolutionary algorithm is proposed for the considered problems and compared with the best existing algorithms. Experimental results show that the proposed algorithm is effective with high efficiency. 展开更多
关键词 no-wait flow shop objective increment MAKESPAN total flowtime evolutionary algorithm
下载PDF
MULTI-SHOP SCHEDULING PROBLEM 被引量:2
19
作者 HU Yanhai YAN Junqi +2 位作者 MA Dengzhe YE Feifan ZHANG Jie 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2007年第3期109-112,共4页
A new concept of multi-shop (M ) is put forward which contains all basic shops including open shop (O), job shop (J ), flow shop (F ) and hybrid flow shop (H ) so that these basic shop can be scheduled toget... A new concept of multi-shop (M ) is put forward which contains all basic shops including open shop (O), job shop (J ), flow shop (F ) and hybrid flow shop (H ) so that these basic shop can be scheduled together. Several algorithms including ant colony optimization (ACO), most work remaining (MWR), least work remaining (LWR), longest processing time (LPT) and shortest processing time (SPT) are used for scheduling the M. Numerical experiments of the M adopting data of some car and reC series benchmark instances are tested. The results show that the ACO algorithm has better performance for scheduling the M than the other algorithms, if minimizing the makespan ( Cmax^*) is taken as the objective function. As a comparison, the separate shops contained in the M are also scheduled by the ACO algorithm for the same objective function, when the completing time of the jobs in the previous shop is taken as the ready time of these jobs in the following shop. The results show that the M has the advantage of shortening the makespan upon separate shops. 展开更多
关键词 Multi-shop scheduling Mixed shop Hybrid flow shop HEURISTICS
下载PDF
基于遗传算法的混合Flow-shop调度方法 被引量:46
20
作者 王万良 姚明海 +1 位作者 吴云高 吴启迪 《系统仿真学报》 CAS CSCD 2002年第7期863-865,869,共4页
混合Flow-shop调度问题 (Hybrid flow-shop scheduling problem, HFSP),是一般Flow-shop调度问题的推广,由于在某些工序上存在并行机器,所以比一般的Flow-shop调度问题更复杂。本文提出了遗传算法求解混合Flow-shop调度问题的方法,给出... 混合Flow-shop调度问题 (Hybrid flow-shop scheduling problem, HFSP),是一般Flow-shop调度问题的推广,由于在某些工序上存在并行机器,所以比一般的Flow-shop调度问题更复杂。本文提出了遗传算法求解混合Flow-shop调度问题的方法,给出了一种新的编码方法,设计了相应的交叉和变异操作算子,能够保证个体的合法性,同时又具有遗传算法本身所要求的随机性。最后给出了某汽车发动机厂金加工车间的生产调度实例,表明了此算法的有效性。 展开更多
关键词 遗传算法 混合flow-shop调度问题 组合优化问题 数学规划
下载PDF
上一页 1 2 39 下一页 到第
使用帮助 返回顶部