期刊文献+
共找到164篇文章
< 1 2 9 >
每页显示 20 50 100
Non-equal-interval direct optimizing Verhulst model that x(n) be taken as initial value and its application 被引量:2
1
作者 Luo, Youxin Chen, Mianyun +1 位作者 Che, Xiaoyi He, Zheming 《Journal of Southeast University(English Edition)》 EI CAS 2008年第S1期17-21,共5页
To overcome the deficiencies of the existing Verhulst GM(1,1) model, based on the existing grey theory, a non-equal-interval direct optimum Verhulst GM(1,1) model is built which chooses a modified n-th component x(n) ... To overcome the deficiencies of the existing Verhulst GM(1,1) model, based on the existing grey theory, a non-equal-interval direct optimum Verhulst GM(1,1) model is built which chooses a modified n-th component x(n) of X(0) as the starting condition of the grey differential model. It optimizes a modified β value and the background value, and takes two times fitting optimization. The new model extends equal intervals to non-equal-intervals and is suitable for general data modelling and estimating parameters of the direct Verhulst GM(1,1). The new model does not need to pre-process the primitive data, nor accumulate generating operation (AGO) and inverse accumulated generating operation (IAGO). It is not only suitable for equal interval data modelling, but also for non-equal interval data modelling. As the new information is fully used and two times fitting optimization is taken, the fitting accuracy is the highest in all existing models. The example shows that the new model is simple and practical. The new model is worth expanding on and applying in data processing or on-line monitoring for tests, social sciences and other engineering sciences. 展开更多
关键词 grey system data processing Verhulst GM(1 1) non-equal interval direct modelling OPTIMUM background value two times fitting
下载PDF
Multi-Mode Resource Constrained Project Scheduling Models for Progress and Equal Time Interval Payments
2
作者 Yan Shangyao Wang Sin-Siang +1 位作者 Chen Miawjane Liu Jzu-Chun 《Journal of Modern Accounting and Auditing》 2014年第12期1187-1200,共14页
This study utilizes a time-precedence network technique to construct two models of multi-mode resource constrained project scheduling problem with discounted cash flows (MRCPSPDCF), individually including the progre... This study utilizes a time-precedence network technique to construct two models of multi-mode resource constrained project scheduling problem with discounted cash flows (MRCPSPDCF), individually including the progress payment (PP) and the payment at an equal time interval (ETI). The objective of each model is to maximize the net present value (NPV) for all cash flows in the project, subject to the related operational constraints. The models are characterized as NP-hard. A heuristic algorithm, coupled with two upper bound solutions, is proposed to efficiently solve the models and evaluate the heuristic algorithm performance which was not performed in past studies. The results show that the performance of proposed models and heuristic algorithm is good. 展开更多
关键词 project scheduling problem multi-mode resource constrained project scheduling problem with discountedcash flows (MRCPSPDCF) progress payment (PP) payment at an equal time interval (ETI) time-precedence network
下载PDF
Convergence Curve for Non-Blind Adaptive Equalizers
3
作者 Monika Pinchas 《Journal of Signal and Information Processing》 2016年第1期7-17,共11页
In this paper a closed-form approximated expression is proposed for the Intersymbol Interference (ISI) as a function of time valid during the entire stages of the non-blind adaptive deconvolution process and is suitab... In this paper a closed-form approximated expression is proposed for the Intersymbol Interference (ISI) as a function of time valid during the entire stages of the non-blind adaptive deconvolution process and is suitable for the noisy, real and two independent quadrature carrier input case. The obtained expression is applicable for type of channels where the resulting ISI as a function of time can be described with an exponential model having a single time constant. Based on this new expression for the ISI as a function of time, the convergence time (or number of iteration number required for convergence) of the non-blind adaptive equalizer can be calculated. Up to now, the equalizer’s performance (convergence time and ISI as a function of time) could be obtained only via simulation when the channel coefficients were known. The new proposed expression for the ISI as a function of time is based on the knowledge of the initial ISI and channel power (which is measurable) and eliminates the need to carry out any more the above mentioned simulation. Simulation results indicate a high correlation between the simulated and calculated ISI (based on our proposed expression for the ISI as a function of time) during the whole deconvolution process for the high as well as for the low signal to noise ratio (SNR) condition. 展开更多
关键词 non-Blind Adaptive equalizers non-Blind Adaptive Deconvolution Acquisition time Convergence time
下载PDF
非治愈性ESD治疗对追加食管癌根治术后并发症的影响
4
作者 卢荣鑫 刘锦源 +2 位作者 薛磊 范骏 骆金华 《南京医科大学学报(自然科学版)》 CAS 北大核心 2024年第11期1586-1589,1598,共5页
目的:探讨内镜下黏膜下剥离术(endoscopic submucosal dissection,ESD)对追加胸腹腔镜联合食管癌根治术后并发症的影响,并进一步研究二次手术合适的间隔时间。方法:收集2019年10月—2022年10月在南京医科大学第一附属医院行胸腹腔镜联... 目的:探讨内镜下黏膜下剥离术(endoscopic submucosal dissection,ESD)对追加胸腹腔镜联合食管癌根治术后并发症的影响,并进一步研究二次手术合适的间隔时间。方法:收集2019年10月—2022年10月在南京医科大学第一附属医院行胸腹腔镜联合食管癌根治手术患者831例,其中52例在食管癌根治术前行ESD手术,其余779例未接受ESD手术,以倾向性评分进行1∶3匹配,将全部患者分为ESD+OP组(52例)和Non-ESD+OP组(149例),对比两组患者术后并发症发病率,研究ESD术后不同时间点行食管癌根治术的优劣。结果:ESD+OP组患者食管癌根治术后的并发症发生率高于Non-ESD+OP组(59.6%vs.33.6%,P=0.001),其中肺部感染(26.9%vs.10.7%,P=0.001)、吻合口瘘(13.5%vs.4.7%,P=0.033)发生率明显增加。与其余时间段相比,ESD术后2~4周追加食管癌根治术并发症发生率较低(38.1%vs.75.0%,P=0.033),手术较为安全。结论:非治愈性ESD治疗会增加食管癌根治术后并发症及手术风险;ESD术后2~4周追加食管癌根治术较为安全,可有效降低手术风险。 展开更多
关键词 食管癌根治术 非治愈性ESD 术后并发症 时间间隔
下载PDF
非正交多址光通信系统信道均衡的虚拟时反方法
5
作者 顾霜凌 张峰 +1 位作者 彭侠 赵黎 《应用光学》 CAS 北大核心 2024年第2期475-484,共10页
室内非正交多址(non-orthogonal multiple access, NOMA)可见光通信系统(visible light communications, VLC)可实现高速率多用户通信,但多径效应会造成通信可靠性及用户公平性明显下降,为此,提出一种虚拟时间反转技术(virtual time rev... 室内非正交多址(non-orthogonal multiple access, NOMA)可见光通信系统(visible light communications, VLC)可实现高速率多用户通信,但多径效应会造成通信可靠性及用户公平性明显下降,为此,提出一种虚拟时间反转技术(virtual time reversal mirror, VTRM)对NOMA-VLC进行信道均衡,消除多径效应对通信过程的影响。分析了多用户场景下室内NOMA-VLC系统模型及其通信光链路的特性,依据光链路增益的稀疏特性采用稀疏度自适应匹配追踪(sparsity adaptive matching pursuit,SAMP)算法,估计NOMA-VLC系统的信道冲激响应(channel impulse response, CIR)。在此基础上,采用VTRM方法对NOMA-VLC进行信道均衡,通过VTRM的时空聚焦特性减少信道衰落影响,并重构接收信号,抑制多径效应。理论分析和实验结果表明:经论文算法均衡后的NOMAVLC系统,在满足前向纠错(forward error correction,FEC)误码率阈值的同时,用户1性能提高了4.4 dB,用户2性能提高了5.7 dB,两用户平均性能提高了5.05 dB,用户间性能差异由1.6 dB降为0.5 dB,为NOMA-VLC信道均衡提供了有效的解决方案。 展开更多
关键词 光通信 非正交多址 信道均衡 虚拟时间反转技术 稀疏度自适应匹配追踪
下载PDF
基于安全态势监测模型的泛在终端种类攻击自动识别研究
6
作者 韩世海 徐鑫 朱珠 《计算机应用与软件》 北大核心 2024年第4期327-332,共6页
以提升泛在终端种类攻击自动识别精度为目的,研究基于安全态势监测模型的泛在终端种类攻击自动识别方法。对初始数据序列实施等时距处理,依照累加数列所表现出的反“S”形摆动特征,通过灰色Verhulst模型确定泛在终端风险值。将支持向量... 以提升泛在终端种类攻击自动识别精度为目的,研究基于安全态势监测模型的泛在终端种类攻击自动识别方法。对初始数据序列实施等时距处理,依照累加数列所表现出的反“S”形摆动特征,通过灰色Verhulst模型确定泛在终端风险值。将支持向量机的参数与分类精度分别作为改进粒子群算法的粒子和目标函数,通过全局搜索过程确定支持向量机的最优参数,构建多分类识别模型,将泛在终端风险值作为输入,利用识别模型自动识别泛在终端攻击类型。实验分析结果显示该方法攻击类型查准率为97.81%,DCP值最高达到0.0063%。 展开更多
关键词 安全态势 泛在终端 种类攻击 自动识别 等时距处理
下载PDF
输液港应用患者非治疗期间维护间隔时间延长对导管堵塞的影响研究
7
作者 林香 陈丹青 《中国医药指南》 2024年第29期102-104,共3页
目的探讨植入式静脉输液港(PORT)留置患者非治疗期间维护间隔时间延长对导管堵塞的影响。方法回顾性研究2022年8月至2023年8月我院介入导管室接诊的105例PORT留置肿瘤患者的临床资料,依据非治疗期间PORT维护间隔时间分成4组,即≤4周/次... 目的探讨植入式静脉输液港(PORT)留置患者非治疗期间维护间隔时间延长对导管堵塞的影响。方法回顾性研究2022年8月至2023年8月我院介入导管室接诊的105例PORT留置肿瘤患者的临床资料,依据非治疗期间PORT维护间隔时间分成4组,即≤4周/次组、4~6周/次组、7~9周/次以及10~12周/次组,对比并分析不同组的导管堵塞和感染的发生情况。结果在本研究中,≤4周/次组、4~6周/次组的导管堵塞发生率组间无显著性差异(P>0.05),但均低于7~9周/次组及10~12周/次组(P<0.05);≤4周/次组、7~9周/次组、10~12周/次组的感染发生率均无显著差异(P>0.05),但高于4~6周/次组(P<0.05)。结论在肿瘤患者PORT非治疗期间维护间隔时间在4~6周最为适宜,可预防和减少导管堵塞等发生,提高静脉输液港的应用安全性。 展开更多
关键词 静脉输液港 非治疗期间 间隔时间 导管堵塞
下载PDF
Delay-dependent Non-fragile H_∞ Control for Linear Systems with Interval Time-varying Delay 被引量:1
8
作者 Jun-Jun Hui He-Xin Zhang Xiang-Yu Kong 《International Journal of Automation and computing》 EI CSCD 2015年第1期109-116,共8页
This paper considers the problem of delay-dependent non-fragile H∞control for a class of linear systems with interval time-varying delay. Based on the direct Lyapunov method, an appropriate Lyapunov-Krasovskii functi... This paper considers the problem of delay-dependent non-fragile H∞control for a class of linear systems with interval time-varying delay. Based on the direct Lyapunov method, an appropriate Lyapunov-Krasovskii functional(LKF) with triple-integral terms and augment terms is introduced. Then, by using the integral inequalities and convex combination technique, an improved H∞performance analysis criterion and non-fragile H∞controller are formulated in terms of linear matrix inequalities(LMIs), which can be easily solved by using standard numerical packages. At last, two numerical examples are provided to demonstrate the effectiveness of the obtained results. 展开更多
关键词 Lyapunov-Krasovskii functional(LKF) non-FRAGILE H∞control linear matrix inequality(LMI) interval time-varying delay
原文传递
The Non-Equidistant Grey GRM (1, 1) Model and Its Application 被引量:1
9
作者 Ruibiao Zou Zouxin Mou Wei Yi 《International Journal of Modern Nonlinear Theory and Application》 2012年第2期51-54,共4页
Applying the modeling method of Grey system and accumulated generating operation of reciprocal number for the problem of lower precision as well as lower adaptability in non-equidistant GM (1, 1) model, the calculatio... Applying the modeling method of Grey system and accumulated generating operation of reciprocal number for the problem of lower precision as well as lower adaptability in non-equidistant GM (1, 1) model, the calculation formulas were deduced and a non-equidistant GRM (1, 1) model generated by accumulated generating operation of reciprocal number was put forward .The grey GRM (1, 1) model can be used in non-equal interval & equal interval time series and has the characteristic of high precision as well as high adaptability. Example validates the practicability and reliability of the proposed model. 展开更多
关键词 BACKGROUND Value GREY MODEL GRM (1 1) Generated by Accumulated GENERATING Operation of Reciprocal Number non-equal interval ACCUMULATION Generation Operation GREY System
下载PDF
基于改进非等时距灰色模型与PSO优化的轨道不平顺预测 被引量:2
10
作者 王英杰 楚杭 +1 位作者 时瑾 张雨潇 《铁道科学与工程学报》 EI CAS CSCD 北大核心 2023年第5期1636-1644,共9页
基于轨道动检数据开展的轨道不平顺预测研究,可用于指导以预防为主的养护维修作业。将改进非等时距灰色模型与粒子群优化(Particle Swarm Optimization,PSO)相结合来实现轨道质量指数(Track Quality Index,TQI)的高精度预测。在考虑TQI... 基于轨道动检数据开展的轨道不平顺预测研究,可用于指导以预防为主的养护维修作业。将改进非等时距灰色模型与粒子群优化(Particle Swarm Optimization,PSO)相结合来实现轨道质量指数(Track Quality Index,TQI)的高精度预测。在考虑TQI原始动检数据特征的基础上增加原始数据平滑优化、累加初始值优化和背景值优化等环节提出改进非等时距灰色模型。利用PSO算法的启发式搜索优势,以平滑优化参数、初始值优化参数、背景值优化参数为搜索目标,以预测平均相对误差为适应度函数,实现预测模型参数的自适应优化。在此基础上,基于优化参数计算得到拟合区间和外推区间上的TQI预测结果。选取沪昆线上行区段实测TQI数据对本文方法进行验证,并与既有TQI组合预测模型的预测结果进行了对比。研究结果表明,模型可有效捕捉TQI序列中的随机波动与实时演变趋势,在外推区间上的平均相对误差分别为2.04%和2.54%,预测性能优良;当TQI序列振荡特性显著时,本模型仍能保证预测结果的可靠性;与组合预测模型相比,该模型规避了残差修正、多算法融合等繁琐步骤,可通过有限优化环节提升预测精度,为轨道不平顺预测提供一种新方法。 展开更多
关键词 铁路 轨道不平顺 非等时距 灰色模型 粒子群优化 预测
下载PDF
Emission Intensity in the Hydrogen Atom Calculated from a Non-Probabilistic Approach to the Electron Transitions 被引量:3
11
作者 Stanisƚaw Olszewski 《Journal of Modern Physics》 2016年第8期827-851,共25页
Quantum aspects of the Joule-Lenz law for the transmission of energy allowed us to calculate the time rate of energy transitions between the quantum states of the hydrogen atom in a fully non-probabilistic way. The ca... Quantum aspects of the Joule-Lenz law for the transmission of energy allowed us to calculate the time rate of energy transitions between the quantum states of the hydrogen atom in a fully non-probabilistic way. The calculation has been extended to all transitions between p and s states having main quantum numbers not exceeding 6. An evident similarity between the intensity pattern obtained from the Joule-Lenz law and the corresponding quantum-mechanical transition pro-babilities has been shown. 展开更多
关键词 time intervals for the Electron Transitions in the Hydrogen Atom non-Probabilistic Theory of Energy Emission in the Atom Comparison of the Emission Intensities with the Quantum-Mechanical Transition Probabilities
下载PDF
基于等间隔运行模式的群组电梯系统优化调度方法 被引量:1
12
作者 彭云建 杜艺聪 仲兆峰 《控制理论与应用》 EI CAS CSCD 北大核心 2023年第5期949-956,共8页
针对群组电梯系统运行调度优化问题,本文采用多目标优化模型,基于电梯群组等间隔运行模式的操作规则,建立一类以乘客平均候梯时间最短为主要目标的群组优化策略.通过分析群组电梯系统运行中乘客候梯时间、服务时间、轿厢拥挤度和电梯能... 针对群组电梯系统运行调度优化问题,本文采用多目标优化模型,基于电梯群组等间隔运行模式的操作规则,建立一类以乘客平均候梯时间最短为主要目标的群组优化策略.通过分析群组电梯系统运行中乘客候梯时间、服务时间、轿厢拥挤度和电梯能耗等指标,建立电梯系统运行的动态指标评价模型,考虑电梯客流的随机性因素,提出乘客候梯等间隔派梯规则和算法,实现了电梯系统多目标优化的动态调度方法.实验结果表明,对比传统的最短距离调度算法,本文方法可以降低乘客平均候梯时间13.1%,提高群组电梯系统工作性能. 展开更多
关键词 电梯群组调度 等间隔运行 多目标优化 乘客平均候梯时间
下载PDF
动态GM(1,1)模型在沉降预测中的应用研究 被引量:2
13
作者 王宁 华远峰 《测绘与空间地理信息》 2023年第6期191-194,共4页
灰色理论广泛应用于沉降预测,对指导现场施工具有重要意义。传统GM(1,1)模型的建立是以前期沉降数据作为建立模型的原始序列,然后对后几期沉降量进行预测。传统预测模型是一种静态的预测模型,短期预测的效果好,但对中长期沉降的预测结... 灰色理论广泛应用于沉降预测,对指导现场施工具有重要意义。传统GM(1,1)模型的建立是以前期沉降数据作为建立模型的原始序列,然后对后几期沉降量进行预测。传统预测模型是一种静态的预测模型,短期预测的效果好,但对中长期沉降的预测结果准确性较低。本文采取了一种动态的建模方法,采用动态递补的方式不断更新预测模型,使其适用于中长期沉降的预测。 展开更多
关键词 灰色模型 沉降预测 动态递补 非等间隔序列
下载PDF
非机动车影响下公交站点毗邻区公交车运行特征分析
14
作者 张日民 孟宇光 严加权 《工程技术研究》 2023年第23期218-220,共3页
文章主要针对站点附近公交车和非机动车运行特征进行定量分析,在南京市选择4个不同公交站点数据,并将公交站点划分为上游、站台和下游区间,对非机动车速度和公交车运行时间变化特征进行对比分析。结果表明:不同类型公交站点对不同区间... 文章主要针对站点附近公交车和非机动车运行特征进行定量分析,在南京市选择4个不同公交站点数据,并将公交站点划分为上游、站台和下游区间,对非机动车速度和公交车运行时间变化特征进行对比分析。结果表明:不同类型公交站点对不同区间内非机动车速度和公交车运行时间都存在显著影响;公交车在站点停车服务对非机动车速度产生影响;非机动车运行速度在设置机非分隔带的非港湾式公交站点不发生显著变化。 展开更多
关键词 公交站点类型和区间 非机动车速度 公交车时间 累积频率曲线
下载PDF
基于非等时距加权灰色模型与神经网络的组合预测算法 被引量:39
15
作者 韩晋 杨岳 +1 位作者 陈峰 李雄兵 《应用数学和力学》 CSCD 北大核心 2013年第4期408-419,共12页
非等时距预测算法在不等时间间隔序列的趋势分析与预测方面具有重要作用.在传统灰色预测理论的基础上,提出一种基于非等时距加权灰色模型和神经网络的组合预测算法.通过构建非等时距加权灰色预测模型,将原始数据序列的平均值作为累加序... 非等时距预测算法在不等时间间隔序列的趋势分析与预测方面具有重要作用.在传统灰色预测理论的基础上,提出一种基于非等时距加权灰色模型和神经网络的组合预测算法.通过构建非等时距加权灰色预测模型,将原始数据序列的平均值作为累加序列初值,将连续累积函数的积分面积作为背景值,对累加序列进行加权处理,以真实反映时间序列发展对预测结果的影响.在此基础上,引入BP神经网络对灰色预测的残差序列进行修正,进一步提高了预测精度.经算例验证,该算法预测精度达到1级,且高于类似算法. 展开更多
关键词 预测 非等时距 灰色模型 加权 神经网络 残差修正
下载PDF
基于灰色GM(1,1)非等时距修正模型的轨道质量预测 被引量:13
16
作者 曲建军 高亮 +1 位作者 张新奎 辛涛 《中国铁道科学》 EI CAS CSCD 北大核心 2009年第3期5-8,共4页
根据灰色理论,以轨道质量指数检测数据为原始时间序列,通过累加弱化序列的随机性,挖掘轨道系统内在的规律,研究建立基于灰色GM(1,1)非等时距模型的轨道质量预测方法。为提高模型预测精度,优化模型中的初值和背景值,并基于残差分析引入... 根据灰色理论,以轨道质量指数检测数据为原始时间序列,通过累加弱化序列的随机性,挖掘轨道系统内在的规律,研究建立基于灰色GM(1,1)非等时距模型的轨道质量预测方法。为提高模型预测精度,优化模型中的初值和背景值,并基于残差分析引入周期性函数,对模型进行修正。用此模型对轨道质量指数TQI数据进行分析预测,并对模型精度进行检验。结果表明模型能较好地反映轨道质量恶化发展的随机波动特征,拟合、预测精度高,为了解和掌握轨道质量状态的发展规律提供了新的方法。 展开更多
关键词 灰色修正模型 GM(1 1) 非等时距 轨道质量指数 时间序列 预测方法
下载PDF
基于非等时距加权灰色模型与神经网络的轨道不平顺预测 被引量:28
17
作者 韩晋 杨岳 +1 位作者 陈峰 吴湘华 《铁道学报》 EI CAS CSCD 北大核心 2014年第1期81-87,共7页
对轨道不平顺的发展趋势进行有效预测,可以提高铁路线路养护的维修效率,保障行车安全。根据轨道不平顺的发展特性,提出一种基于非等时距加权灰色理论和神经网络法的组合预测方法。该方法通过构建非等时距加权灰色预测模型,将原始TQI序... 对轨道不平顺的发展趋势进行有效预测,可以提高铁路线路养护的维修效率,保障行车安全。根据轨道不平顺的发展特性,提出一种基于非等时距加权灰色理论和神经网络法的组合预测方法。该方法通过构建非等时距加权灰色预测模型,将原始TQI序列的平均值作为累加序列初值,将连续累积函数的积分面积作为背景值,对累加序列进行加权处理,较好地反映了时间序列对轨道不平顺预测结果的贡献。在此基础上,引入BP神经网络模型对TQI预测的残差序列进行修正,较好地克服了单一模型预测精度偏低的不足。分别对沪昆线上行两段线路的轨道不平顺进行预测,结果表明该预测方法相对误差平均值分别为2.76%和2.08%,预测结果的后验差比值分别为0.121和0.151,精度等级达到1级。 展开更多
关键词 轨道不平顺 神经网络 非等时距 灰色模型 加权 残差修正
下载PDF
具有更新机制的铁路轨道不平顺灰色预测模型 被引量:12
18
作者 郭然 韩宝明 +1 位作者 李得伟 李华 《中南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2013年第10期4334-4341,共8页
为了准确预测轨道各项不平顺的劣化情况,保证轨道的高平顺性,杜绝安全隐患,提出基于灰色预测理论的铁路轨道局部不平顺预测方法。该方法将25 m轨道单元区段各项不平顺幅值的标准差作为原始时间序列,建立具有更新机制的轨道不平顺灰色GM(... 为了准确预测轨道各项不平顺的劣化情况,保证轨道的高平顺性,杜绝安全隐患,提出基于灰色预测理论的铁路轨道局部不平顺预测方法。该方法将25 m轨道单元区段各项不平顺幅值的标准差作为原始时间序列,建立具有更新机制的轨道不平顺灰色GM(1,1)非等时距预测模型,并优化模型的背景值和初值以提高预测精度。利用京九线轨检车波形数据,从时间和空间维度验证了模型的有效性。研究结果表明:单元区段预测结果的平均绝对误差为0.039 mm,平均相对误差为1.95%;连续区段预测结果的平均绝对误差为0.046 7 mm,平均相对误差为3.62%。该模型预测不平顺状态与实测结果非常逼近,能够较好地反映轨道局部不平顺的劣化发展。 展开更多
关键词 轨道不平顺 灰色预测理论 GM(1 1) 非等时距 预测模型
下载PDF
基于灰色Verhulst的网络安全态势感知模型 被引量:28
19
作者 赵国生 王慧强 王健 《哈尔滨工业大学学报》 EI CAS CSCD 北大核心 2008年第5期798-801,共4页
为了满足对抗性环境中对网络安全监测和预警的需要,提出了一种非等时距灰色Verhulst残差修正的安全态势感知模型.由非等时距的原始采样风险数据序列入手,根据累加序列所呈现出"S"形或反"S"形的摆动特征,选用灰色Ver... 为了满足对抗性环境中对网络安全监测和预警的需要,提出了一种非等时距灰色Verhulst残差修正的安全态势感知模型.由非等时距的原始采样风险数据序列入手,根据累加序列所呈现出"S"形或反"S"形的摆动特征,选用灰色Verhulst模型或其反函数模型预测出网络未来的风险值,然后基于多级残差对模型的预测精度进行修正,最后应用修正后的新模型得到直观的网络未来安全态势曲线图.经过试验示例与仿真,表明该模型对网络安全态势的感知能够达到令人满意的拟合精度,具有实用价值. 展开更多
关键词 非等时距 灰色VERHULST模型 残差修正 态势感知 态势曲线
下载PDF
改进的灰色模型在建筑物沉降预测中的应用 被引量:36
20
作者 孙泽信 庞逸群 黄腾 《测绘工程》 CSCD 2010年第3期59-62,共4页
介绍灰色非等间距GM(1,1)模型的建立及其精度评定方法,着重探讨模型精度的主要影响因素,并从模型背景值的构造以及初值选取两个方面对灰色非等间距GM(1,1)模型进行改进,结合高层建筑沉降监测实例进行预测结果分析,结果表明,改进后的灰... 介绍灰色非等间距GM(1,1)模型的建立及其精度评定方法,着重探讨模型精度的主要影响因素,并从模型背景值的构造以及初值选取两个方面对灰色非等间距GM(1,1)模型进行改进,结合高层建筑沉降监测实例进行预测结果分析,结果表明,改进后的灰色模型具有较高的精度,在沉降预测中具有较高的应用价值。 展开更多
关键词 沉降监测 非等间距 灰色模型 预测分析
下载PDF
上一页 1 2 9 下一页 到第
使用帮助 返回顶部