Formwork is the temporary moulds in the construction which is fabricated based on the drawing and design of the structure and into which the concrete is poured to form the required structure.Formwork is an essential p...Formwork is the temporary moulds in the construction which is fabricated based on the drawing and design of the structure and into which the concrete is poured to form the required structure.Formwork is an essential part of the construction as it has been used by the Romans.The formworks must be strong enough to withstand all types of loads.The joint must be in proper condition to avoid any kind of leakages.The materials used for the formworks should be economical,easily available and durable.The formworks can be made up of different materials such as plywood,steel,aluminum,composite material,etc.In steel formwork the plates used for the slab support are made up of galvanized steel and these are fabricated as per the requirements.Aluminum plates are used in the aluminum framework along with the other components made up of aluminum.The selection of a suitable framework is important in any project because it bears about 25%to 30%cost of the total cost of construction.In the present study,different types of formworks such as steel,plywood and aluminum were studied in a project and a comparison was made on the reusability and easiness in handling and maintenance.Also,a comparison of the formwork used in the construction of the 5th and 11th-floor tower based on the specific plan and drawing was done.The results showed that the aluminum formwork was found to be efficient and suitable among all formworks,although the cost was higher compared to other formwork materials.展开更多
文摘Formwork is the temporary moulds in the construction which is fabricated based on the drawing and design of the structure and into which the concrete is poured to form the required structure.Formwork is an essential part of the construction as it has been used by the Romans.The formworks must be strong enough to withstand all types of loads.The joint must be in proper condition to avoid any kind of leakages.The materials used for the formworks should be economical,easily available and durable.The formworks can be made up of different materials such as plywood,steel,aluminum,composite material,etc.In steel formwork the plates used for the slab support are made up of galvanized steel and these are fabricated as per the requirements.Aluminum plates are used in the aluminum framework along with the other components made up of aluminum.The selection of a suitable framework is important in any project because it bears about 25%to 30%cost of the total cost of construction.In the present study,different types of formworks such as steel,plywood and aluminum were studied in a project and a comparison was made on the reusability and easiness in handling and maintenance.Also,a comparison of the formwork used in the construction of the 5th and 11th-floor tower based on the specific plan and drawing was done.The results showed that the aluminum formwork was found to be efficient and suitable among all formworks,although the cost was higher compared to other formwork materials.
文摘为探究爬模施工进程中索塔空间温度场和应力场分布,掌握塔柱线形特性,提出一种索塔爬模施工仿真分析方法.利用Fortran编程语言开发相应子程序,对结构施加复杂温度边界,实现不同节段混凝土水化放热、收缩徐变.利用Abaqus软件对索塔爬模施工过程进行分析.结果表明:施工过程中索塔空间温度分布不均匀,塔柱表里最大温差达25.9℃,向阳面与背阴面温差最大为9℃;考虑温度效应后,塔柱所受拉应力更大,且空间应力分布具有很强的时变性,索塔线形特征与变化规律也发生改变;施工塔顶累积竖向位移先增大后减小,在爬模第16节段达到最大值20.5 mm;施工过程塔顶累计顺桥向和横桥向位移更大,最大值分别为6.5和22.3 mm.