The semi-rigid pile-supported composite foundation is widely used in highway projects due to its effectiveness in increasing the bearing capacity and stability of foundations.It is crucial to understand the stress dis...The semi-rigid pile-supported composite foundation is widely used in highway projects due to its effectiveness in increasing the bearing capacity and stability of foundations.It is crucial to understand the stress distribution across the embankment width and the behaviour of unreinforced foundations.Thus,five centrifuge tests were conducted to examine the bearing and deformation behaviours of NPRS(Non-Connected Piled Raft Systems)and GRPS(GeosyntheticReinforced Pile-Supported systems)with varying substratum stiffness,then a comparative analysis was conducted on embankment settlement,pressures underneath the embankments,and axial forces along the piles.The results indicated that greater substratum stiffness correlates with reduced settlement and deformation at various depths.Deformation occurring 5 meters from the embankment toe includes settlement in NPRS and upward movement in GRPS.The potential sliding surface is primarily located within the embankment in NPRS,whereas it may extend through both the embankment and foundation in GRPS.The pile-soil stress ratio and efficiency in NPRS are higher than in GRPS across the embankment.The axial force borne by end-bearing piles is significantly greater than that by floating piles.As the buried depth increases,the axial force in GRPS initially rises then declines,whereas in NPRS,it remains relatively constant within a certain range before decreasing.This study aids in assessing the applicability of composite foundations in complex railway environments and provides a reference for procedural measures under similar conditions.展开更多
To further study the load transfer mechanism of roofemulti-pillarefloor system during cascading pillar failure(CPF),numerical simulation and theoretical analysis were carried out to study the three CPF modes according...To further study the load transfer mechanism of roofemulti-pillarefloor system during cascading pillar failure(CPF),numerical simulation and theoretical analysis were carried out to study the three CPF modes according to the previous experimental study on treble-pillar specimens,e.g.successive failure mode(SFM),domino failure mode(DFM)and compound failure mode(CFM).Based on the finite element code rock failure process analysis(RFPA^(2D)),numerical models of treble-pillar specimen with different mechanical properties were established to reproduce and verify the experimental results of the three CPF modes.Numerical results show that the elastic rebound of roofefloor system induced by pillar instability causes dynamic disturbance to adjacent pillars,resulting in sudden load increases and sudden jump displacement of adjacent pillars.The phenomena of load transfer in the roofemulti-pillarefloor system,as well as the induced accelerated damage behavior in adjacent pillars,were discovered and studied.In addition,based on the catastrophe theory and the proposed mechanical model of treble-pillar specimen edisc spring group system,a potential function that characterizes the evolution characteristics of roof emulti-pillarefloor system was established.The analytical expressions of sudden jump and energy release of treble-pillar specimenedisc spring group system of the three CPF modes were derived according to the potential function.The numerical and theoretical results show good agreement with the experimental results.This study further reveals the physical essence of load transfer during CPF of roof emulti-pillarefloor system,which provides references for mine design,construction and disaster prevention.展开更多
When a line failure occurs in a power grid, a load transfer is implemented to reconfigure the network by changingthe states of tie-switches and load demands. Computation speed is one of the major performance indicator...When a line failure occurs in a power grid, a load transfer is implemented to reconfigure the network by changingthe states of tie-switches and load demands. Computation speed is one of the major performance indicators inpower grid load transfer, as a fast load transfer model can greatly reduce the economic loss of post-fault powergrids. In this study, a reinforcement learning method is developed based on a deep deterministic policy gradient.The tedious training process of the reinforcement learning model can be conducted offline, so the model showssatisfactory performance in real-time operation, indicating that it is suitable for fast load transfer. Consideringthat the reinforcement learning model performs poorly in satisfying safety constraints, a safe action-correctionframework is proposed to modify the learning model. In the framework, the action of load shedding is correctedaccording to sensitivity analysis results under a small discrete increment so as to match the constraints of line flowlimits. The results of case studies indicate that the proposed method is practical for fast and safe power grid loadtransfer.展开更多
Reasonable distribution of braking force is a factor for a smooth,safe,and comfortable braking of trains.A dynamic optimal allocation strategy of electric-air braking force is proposed in this paper to solve the probl...Reasonable distribution of braking force is a factor for a smooth,safe,and comfortable braking of trains.A dynamic optimal allocation strategy of electric-air braking force is proposed in this paper to solve the problem of the lack of consideration of adhesion difference of train wheelsets in the existing high-speed train electric-air braking force optimal allocation strategies.In this method,the braking strategy gives priority to the use of electric braking force.The force model of a single train in the braking process is analyzed to calculate the change of adhesion between the wheel and rail of each wheelset after axle load transfer,and then the adhesion of the train is estimated in real time.Next,with the goal of maximizing the total adhesion utilization ratio of trailer/motor vehicles,a linear programming distribution function is constructed.The proportional coefficient of adhesion utilization ratio of each train and the application upper limit of braking force in the function is updated according to the change time point of wheelset adhesion.Finally,the braking force is dynamically allocated.The simulation results of Matlab/Simulink show that the proposed algorithm not only uses the different adhesion limits of each trailer to reduce the total amount of braking force undertaken by the motor vehicle,but also considers the adhesion difference of each wheelset.The strategy can effectively reduce the risk and time of motor vehicles during the braking process and improve the stability of the train braking.展开更多
Confinement of rock bolts by the surrounding rock formation has long been recognized as a positive contributor to the pull-out behavior,yet only a few experimental works and analytical models have been reported,most o...Confinement of rock bolts by the surrounding rock formation has long been recognized as a positive contributor to the pull-out behavior,yet only a few experimental works and analytical models have been reported,most of which are based on the global rock bolt response evaluated in pull-out tests.This paper presents a laboratory experimental setup aiming to capture the rock formation effect,while using distributed fiber optic sensing to quantify the effect of the confinement and the reinforcement pull-out behavior on a more local level.It is shown that the behavior along the sample itself varies,with certain points exhibiting stress drops with crack formation.Some edge effects related to the kinematic freedom of the grout to dilate are also observed.Regardless,it was found that the mid-level response is quite similar to the average response along the sample.The ability to characterize the variation of the response along the sample is one of the many advantages high-resolution fiber optic sensing allows in such investigations.The paper also offers a plasticity-based hardening load transfer function,representing a"slice"of the anchor.The paper describes in detail the development of the model and the calibration/determination of its parameters.The suggested model captures well the coupled behavior in which the pull-out process leads to an increase in the confining stress due to dilative behavior.展开更多
The wheel loads of heavy trucks are the major source of pavement damage,given the repeated loadings imposed by them due to transient events and surface irregularities.While related studies focus on steady-state contex...The wheel loads of heavy trucks are the major source of pavement damage,given the repeated loadings imposed by them due to transient events and surface irregularities.While related studies focus on steady-state context regarding simplified vehicle’s parameters and ideal pavement conditions,this paper aims to analyze the vertical load applied to the pavement by considering cornering maneuver as a transient event,on a battery electric vehicle truck.In this concern,measurements were performed on a rigid truck,with two steering front axles,in a closed course proving ground.The relationship has been presented between vehicle’s speed,lateral acceleration and transferred vertical load for a given curve radius of 85.6 m and 3.7°of transversal slope.The measurements results indicated that for every 10 km/h increasing on the vehicle’s speed,additional 110 kgf will be transferred to the pavement on the outer side of the cornering radius.This value itself could not be considered high,but it will be also added to the static load,or overload in some truck applications.展开更多
For the integration network of a cellular network and a wireless local area network (WLAN), a priority-based dynamic load transfer (PDLT) algorithm is proposed. The dynamic vertical handoffs by call admission cont...For the integration network of a cellular network and a wireless local area network (WLAN), a priority-based dynamic load transfer (PDLT) algorithm is proposed. The dynamic vertical handoffs by call admission control are jointly determined by the network conditions and the traffic characteristics in combination with the location-condition of mobile terminals. When there is no bandwidth resource available in the cellular network or WLAN, the proposed PDLT algorithm allows an incoming voice call or data call within the overlapping area of the cellular network and the WLAN to be directed to the spare network; meanwhile, by dynamically computing the occupancy of the bandwidth resource, the proposed PDLT algorithm also allows an ongoing voice call or data communication to be transferred to the network with a sufficient bandwidth resource according to the given threshold to balance the number of voice/data calls in the two networks. The analysis results of a two-dimensional Markov model and the simulation results show that the PDLT algorithm can effectively enhance the whole integrated network' s traffic, reduce the blocking probability of new calls and increase the data throughput, and thus decrease the response time for various services.展开更多
Fully grouted rock bolts have been used in mining industry for many years.Much research has been conducted to evaluate the load transfer behavior of fully grouted rock bolts with experimental programs.However,compared...Fully grouted rock bolts have been used in mining industry for many years.Much research has been conducted to evaluate the load transfer behavior of fully grouted rock bolts with experimental programs.However,compared with that,less work has been conducted with analytical modelling.Therefore,in this paper,the authors used an analytical model to study the load transfer behavior of fully grouted rock bolts.To confirm the credibility of this analytical model,an in-situ pull-out test was used to validate this model.There was a close match between the experimental result and the analytical result.Following it,a parametric study was conducted with this analytical model.The influence of coefficients,Young’s modulus of the rock bolt and the diameter of the rock bolt on the load transfer performance of rock bolts was studied.Furthermore,the load distribution along the fully grouted rock bolt was analytically studied.The results show that the axial load in the rock bolt decayed from the loaded end to the free end independent of the pull-out load.However,the trend of the load distribution curve was influenced by the pull-out load.This paper was beneficial for better understanding the load transfer mechanism of fully grouted rock bolts.展开更多
The elastic differential equations of load-transfer of single pile either with applied loads on pile-top or only under the soil swelling were established,respectively,based on the theory of pile-soil interaction and t...The elastic differential equations of load-transfer of single pile either with applied loads on pile-top or only under the soil swelling were established,respectively,based on the theory of pile-soil interaction and the shear-deformation method.The derivation of analytic solution to load-transfer for single pile in expansive soil could hereby be obtained by means of superposition principle under expansive soils swelling.The comparison of two engineering examples was made to prove the credibility of the suggested method.The analyzed results show that this analytic solution can achieve high precision with few parameters required,indicating its' simplicity and practicability in engineering application.The employed method can contribute to determining the greatest tension along pile shaft resulting from expansive soils swelling and provide reliable bases for engineering design.The method can be employed to obtain various distributive curves of axial force,settlements and skin friction along the pile shaft with the changes of active depth,vertical movements of the surface and loads of pile-top.展开更多
The purpose of this study is to investigate the role of bolt profile configuration in load transfer capacity between the bolt and grout.Therefore,five types of rock bolts are used with different profiles.The rock bolt...The purpose of this study is to investigate the role of bolt profile configuration in load transfer capacity between the bolt and grout.Therefore,five types of rock bolts are used with different profiles.The rock bolts are modeled by ANSYS software.Models show that profile rock bolt T_3 and T_ with load capacity 180 and 195 kN in the jointed rocks,are the optimum profiles.Finally,the performances of the selected profiles are examined in Tabas Coal Mine by FLAC software.There is good subscription between the results of numerical modeling and instrumentation reading such as tells tale,sonic extensometer and strain gauge rock bolt.According to the finding of this study,the proposed pattern of rock bolts,on 7 + 6 patterns per meter with 2 flexi bolt(4 m) for support gate road.展开更多
The load transfer analytical method is applied to study the bearing mechanism of piles with vertical load in this paper. According to the different hardening rules of soil or rock around the pile shaft, such as work-s...The load transfer analytical method is applied to study the bearing mechanism of piles with vertical load in this paper. According to the different hardening rules of soil or rock around the pile shaft, such as work-softening, ideal elasto-plastic and work-hardening, a universal tri-linear load transfer model is suggested for the development of side and tip resistance by various types of soil (rock) with the consideration of sediment at the bottom of the pile. Based on the model, a formula is derived for the relationship between the settlement and load on the pile top to determine the vertical bearing capacity, taking into account such factors as the characteristics of the stratum, the side resistance along the shaft, and tip resistance under the pile tip. A close agreement of the calculated results with the measured data from a field test pile lends confidence to the future application of the present approach in engineering practice.展开更多
Heat transfer between gas-solid multiphase flow and tubes occurs in many industry processes, such as circulating fluidized bed process, pneumatic conveying process, chemical process, drying process, etc. This paper fo...Heat transfer between gas-solid multiphase flow and tubes occurs in many industry processes, such as circulating fluidized bed process, pneumatic conveying process, chemical process, drying process, etc. This paper focuses on the influence of the presence of particles on the heat transfer between a tube and gas-solid suspension. The presence of particles causes positive enhancement of heat transfer in the case of high solid loading ratio, but heat transfer reduction has been found for in the case of very low solid loading ratio (M s of less than 0.05 kg/kg). A useful correlation incorporating solid loading ratio, particle size and flow Reynolds number was derived from experimental data. In addition, the k-ε two-equation model and the Fluctuation-Spectrum- Random-Trajectory Model (FSRT Model) are used to simulate the flow field and heat transfer of the gas-phase and the solid-phase, respectively. Through coupling of the two phases the model can predict the local and total heat transfer characteristics of tube in gas-solid cross flow. For the total heat transfer enhancement due to particles loading the model predictions agreed well with experimental data.展开更多
Prestressed high-strength-concrete (PHC) tube-shaped pile is one of the recently used foundations for soft soil. The research on uplift resistance of PHC pile is helpful to the design of pile foundations. A field-scal...Prestressed high-strength-concrete (PHC) tube-shaped pile is one of the recently used foundations for soft soil. The research on uplift resistance of PHC pile is helpful to the design of pile foundations. A field-scale test program was conducted to study the uplift behavior and load transfer mechanism of PHC piles in soft soil. The pullout load tests were divided into two groups with different diameters, and there were three piles in each group. A detailed discussion of the axial load transfer and pile skin resistance distribution was also included. It is found from the tests that the uplift capacity increases with increasing the diameter of pile. When the diameter of piles increases from 500 to 600 mm, the uplift load is increased by 51.2%. According to the load-displacement (Q-S) curves, all the piles do not reach the ultimate state at the maximum load. The experimental results show that the piles still have uplift bearing capacity.展开更多
Researches on ultra-high performance concrete (UHPC) have been conducted worldwide owing to its outstanding durability and strength performances. The exploitation of the mechanical properties of UHPC will render it po...Researches on ultra-high performance concrete (UHPC) have been conducted worldwide owing to its outstanding durability and strength performances. The exploitation of the mechanical properties of UHPC will render it possible to achieve economic design through substantial reduction in the cross sectional dimensions and simplification in the reinforcement arrangement. This paper investigates experimentally the load transfer in the prestressed concrete anchorage zone. To provide distinctive features of UHPC compared to ordinary concrete, the cross sectional dimensions of the member were reduced and the stress distribution, deformation and cracking pattern of the PS anchorage zone were examined experimentally according to the degree of reinforcement of the members chosen. The distributions of the bursting stress, spalling stress and longitudinal edge stress in the specimens were observed according to the various types of reinforcement. All the specimens satisfied the load-bearing capacity criterion specified by the European ETAG-013 guidelines and their stress distributions were similar to those in the PS anchorages of post-tensioned members applying ordinary concrete. The cracks propagated longitudinally with lengths up to twice the cross sectional dimensions and their width was smaller than when applying ordinary concrete owing to the bridging effect of the steel fibers in UHPC. Accordingly, the exploitation of the high strength of UHPC enabled us to secure the resistance of the anchorage with no need for particular reinforcing devices.展开更多
The braking quality is considered the main execution of the adaptive control framework that impacts the vehicle safety and rides solace astoundingly notably the stopping distance.This research work aims to create a pa...The braking quality is considered the main execution of the adaptive control framework that impacts the vehicle safety and rides solace astoundingly notably the stopping distance.This research work aims to create a pattern and design of an electromechanically adjusted lever that multiplies the applied braking force depending on the inputs given by the sensors to reduce the stopping distance of the vehicle.It is carried out using two main parts of the two-wheeler vehicle:thefirst part deals with the detection of load acting on the vehicle and identifying the required braking force to be applied,and the second part deals with the micro-controller which activates the stepper motor for varying the mechanical leverage ratio from various loads on the vehicle using two actively movable wedges.The electromechanically operated variable braking force system is developed to actuate the braking system based on the load on the motorcycle.The MATLAB simulation and experimental work are carried out for various loading(driver and pillion)conditions on a two-wheeler.The results indicate that the proposed electronically operated braking system is more effective than the conventional braking system for various loads and vehicle speeds.Specifically,the stopping distance of the vehicle is decreased significantly by about 4.9%between the con-ventional braking system and the simulated proposed system.Further,the experi-mental results show that the stopping distance is condensed by about 4.1%.The validation between simulated and experimental results revealed a great deal with the least error percentage of about 0.8%.展开更多
基金financially supported by the National Natural Science Foundation of China(Nos.51878577 and 52378463)the Natural Science Foundation of Shandong Provincial,China(No.ZR2022ME042)the School-Enterprise Cooperation Program of China Railway 14th Bureau Group Co.(QTHT-HGLCHSD-00052)。
文摘The semi-rigid pile-supported composite foundation is widely used in highway projects due to its effectiveness in increasing the bearing capacity and stability of foundations.It is crucial to understand the stress distribution across the embankment width and the behaviour of unreinforced foundations.Thus,five centrifuge tests were conducted to examine the bearing and deformation behaviours of NPRS(Non-Connected Piled Raft Systems)and GRPS(GeosyntheticReinforced Pile-Supported systems)with varying substratum stiffness,then a comparative analysis was conducted on embankment settlement,pressures underneath the embankments,and axial forces along the piles.The results indicated that greater substratum stiffness correlates with reduced settlement and deformation at various depths.Deformation occurring 5 meters from the embankment toe includes settlement in NPRS and upward movement in GRPS.The potential sliding surface is primarily located within the embankment in NPRS,whereas it may extend through both the embankment and foundation in GRPS.The pile-soil stress ratio and efficiency in NPRS are higher than in GRPS across the embankment.The axial force borne by end-bearing piles is significantly greater than that by floating piles.As the buried depth increases,the axial force in GRPS initially rises then declines,whereas in NPRS,it remains relatively constant within a certain range before decreasing.This study aids in assessing the applicability of composite foundations in complex railway environments and provides a reference for procedural measures under similar conditions.
基金financially supported by the National Key R&D Program of China(Grant No.2022YFC2903901)Enlisting and Leading Project of the Key Scientific and Technological Innovation in Heilongjiang Province,China(Grant No.2021ZXJ02A03,04)the North China University of Water Resources and Electric Power Launch Fund for High-level Talents Research(Grant No.40937).
文摘To further study the load transfer mechanism of roofemulti-pillarefloor system during cascading pillar failure(CPF),numerical simulation and theoretical analysis were carried out to study the three CPF modes according to the previous experimental study on treble-pillar specimens,e.g.successive failure mode(SFM),domino failure mode(DFM)and compound failure mode(CFM).Based on the finite element code rock failure process analysis(RFPA^(2D)),numerical models of treble-pillar specimen with different mechanical properties were established to reproduce and verify the experimental results of the three CPF modes.Numerical results show that the elastic rebound of roofefloor system induced by pillar instability causes dynamic disturbance to adjacent pillars,resulting in sudden load increases and sudden jump displacement of adjacent pillars.The phenomena of load transfer in the roofemulti-pillarefloor system,as well as the induced accelerated damage behavior in adjacent pillars,were discovered and studied.In addition,based on the catastrophe theory and the proposed mechanical model of treble-pillar specimen edisc spring group system,a potential function that characterizes the evolution characteristics of roof emulti-pillarefloor system was established.The analytical expressions of sudden jump and energy release of treble-pillar specimenedisc spring group system of the three CPF modes were derived according to the potential function.The numerical and theoretical results show good agreement with the experimental results.This study further reveals the physical essence of load transfer during CPF of roof emulti-pillarefloor system,which provides references for mine design,construction and disaster prevention.
基金the Incubation Project of State Grid Jiangsu Corporation of China“Construction and Application of Intelligent Load Transferring Platform for Active Distribution Networks”(JF2023031).
文摘When a line failure occurs in a power grid, a load transfer is implemented to reconfigure the network by changingthe states of tie-switches and load demands. Computation speed is one of the major performance indicators inpower grid load transfer, as a fast load transfer model can greatly reduce the economic loss of post-fault powergrids. In this study, a reinforcement learning method is developed based on a deep deterministic policy gradient.The tedious training process of the reinforcement learning model can be conducted offline, so the model showssatisfactory performance in real-time operation, indicating that it is suitable for fast load transfer. Consideringthat the reinforcement learning model performs poorly in satisfying safety constraints, a safe action-correctionframework is proposed to modify the learning model. In the framework, the action of load shedding is correctedaccording to sensitivity analysis results under a small discrete increment so as to match the constraints of line flowlimits. The results of case studies indicate that the proposed method is practical for fast and safe power grid loadtransfer.
基金supported by the National Natural Science Foundation of China(Grant Nos.62173137,52172403,62303178).
文摘Reasonable distribution of braking force is a factor for a smooth,safe,and comfortable braking of trains.A dynamic optimal allocation strategy of electric-air braking force is proposed in this paper to solve the problem of the lack of consideration of adhesion difference of train wheelsets in the existing high-speed train electric-air braking force optimal allocation strategies.In this method,the braking strategy gives priority to the use of electric braking force.The force model of a single train in the braking process is analyzed to calculate the change of adhesion between the wheel and rail of each wheelset after axle load transfer,and then the adhesion of the train is estimated in real time.Next,with the goal of maximizing the total adhesion utilization ratio of trailer/motor vehicles,a linear programming distribution function is constructed.The proportional coefficient of adhesion utilization ratio of each train and the application upper limit of braking force in the function is updated according to the change time point of wheelset adhesion.Finally,the braking force is dynamically allocated.The simulation results of Matlab/Simulink show that the proposed algorithm not only uses the different adhesion limits of each trailer to reduce the total amount of braking force undertaken by the motor vehicle,but also considers the adhesion difference of each wheelset.The strategy can effectively reduce the risk and time of motor vehicles during the braking process and improve the stability of the train braking.
基金funding support from the Israeli Ministry of Housing and Construction(Grant No.2028286).
文摘Confinement of rock bolts by the surrounding rock formation has long been recognized as a positive contributor to the pull-out behavior,yet only a few experimental works and analytical models have been reported,most of which are based on the global rock bolt response evaluated in pull-out tests.This paper presents a laboratory experimental setup aiming to capture the rock formation effect,while using distributed fiber optic sensing to quantify the effect of the confinement and the reinforcement pull-out behavior on a more local level.It is shown that the behavior along the sample itself varies,with certain points exhibiting stress drops with crack formation.Some edge effects related to the kinematic freedom of the grout to dilate are also observed.Regardless,it was found that the mid-level response is quite similar to the average response along the sample.The ability to characterize the variation of the response along the sample is one of the many advantages high-resolution fiber optic sensing allows in such investigations.The paper also offers a plasticity-based hardening load transfer function,representing a"slice"of the anchor.The paper describes in detail the development of the model and the calibration/determination of its parameters.The suggested model captures well the coupled behavior in which the pull-out process leads to an increase in the confining stress due to dilative behavior.
文摘The wheel loads of heavy trucks are the major source of pavement damage,given the repeated loadings imposed by them due to transient events and surface irregularities.While related studies focus on steady-state context regarding simplified vehicle’s parameters and ideal pavement conditions,this paper aims to analyze the vertical load applied to the pavement by considering cornering maneuver as a transient event,on a battery electric vehicle truck.In this concern,measurements were performed on a rigid truck,with two steering front axles,in a closed course proving ground.The relationship has been presented between vehicle’s speed,lateral acceleration and transferred vertical load for a given curve radius of 85.6 m and 3.7°of transversal slope.The measurements results indicated that for every 10 km/h increasing on the vehicle’s speed,additional 110 kgf will be transferred to the pavement on the outer side of the cornering radius.This value itself could not be considered high,but it will be also added to the static load,or overload in some truck applications.
基金The National Science and Technology Major Project(No. 2011ZX03005-004-03 )the National Natural Science Foundation of China (No. 61171081 )the Research Fund of the National Mobile Communications Research Laboratory of Southeast University (No.2011A08)
文摘For the integration network of a cellular network and a wireless local area network (WLAN), a priority-based dynamic load transfer (PDLT) algorithm is proposed. The dynamic vertical handoffs by call admission control are jointly determined by the network conditions and the traffic characteristics in combination with the location-condition of mobile terminals. When there is no bandwidth resource available in the cellular network or WLAN, the proposed PDLT algorithm allows an incoming voice call or data call within the overlapping area of the cellular network and the WLAN to be directed to the spare network; meanwhile, by dynamically computing the occupancy of the bandwidth resource, the proposed PDLT algorithm also allows an ongoing voice call or data communication to be transferred to the network with a sufficient bandwidth resource according to the given threshold to balance the number of voice/data calls in the two networks. The analysis results of a two-dimensional Markov model and the simulation results show that the PDLT algorithm can effectively enhance the whole integrated network' s traffic, reduce the blocking probability of new calls and increase the data throughput, and thus decrease the response time for various services.
基金supported by the National Natural Science Foundation of China (Nos. 51574243 and 51904302)the Yue Qi Distinguished Scholar Project of China (No. 800015Z1138)+1 种基金China University of Mining and Technology, Beijingthe Fundamental Research Funds for the Central Universities, China (No.800015J6)。
文摘Fully grouted rock bolts have been used in mining industry for many years.Much research has been conducted to evaluate the load transfer behavior of fully grouted rock bolts with experimental programs.However,compared with that,less work has been conducted with analytical modelling.Therefore,in this paper,the authors used an analytical model to study the load transfer behavior of fully grouted rock bolts.To confirm the credibility of this analytical model,an in-situ pull-out test was used to validate this model.There was a close match between the experimental result and the analytical result.Following it,a parametric study was conducted with this analytical model.The influence of coefficients,Young’s modulus of the rock bolt and the diameter of the rock bolt on the load transfer performance of rock bolts was studied.Furthermore,the load distribution along the fully grouted rock bolt was analytically studied.The results show that the axial load in the rock bolt decayed from the loaded end to the free end independent of the pull-out load.However,the trend of the load distribution curve was influenced by the pull-out load.This paper was beneficial for better understanding the load transfer mechanism of fully grouted rock bolts.
基金Projects(50378097, 50678177) supported by the National Natural Science Foundation of China
文摘The elastic differential equations of load-transfer of single pile either with applied loads on pile-top or only under the soil swelling were established,respectively,based on the theory of pile-soil interaction and the shear-deformation method.The derivation of analytic solution to load-transfer for single pile in expansive soil could hereby be obtained by means of superposition principle under expansive soils swelling.The comparison of two engineering examples was made to prove the credibility of the suggested method.The analyzed results show that this analytic solution can achieve high precision with few parameters required,indicating its' simplicity and practicability in engineering application.The employed method can contribute to determining the greatest tension along pile shaft resulting from expansive soils swelling and provide reliable bases for engineering design.The method can be employed to obtain various distributive curves of axial force,settlements and skin friction along the pile shaft with the changes of active depth,vertical movements of the surface and loads of pile-top.
文摘The purpose of this study is to investigate the role of bolt profile configuration in load transfer capacity between the bolt and grout.Therefore,five types of rock bolts are used with different profiles.The rock bolts are modeled by ANSYS software.Models show that profile rock bolt T_3 and T_ with load capacity 180 and 195 kN in the jointed rocks,are the optimum profiles.Finally,the performances of the selected profiles are examined in Tabas Coal Mine by FLAC software.There is good subscription between the results of numerical modeling and instrumentation reading such as tells tale,sonic extensometer and strain gauge rock bolt.According to the finding of this study,the proposed pattern of rock bolts,on 7 + 6 patterns per meter with 2 flexi bolt(4 m) for support gate road.
文摘The load transfer analytical method is applied to study the bearing mechanism of piles with vertical load in this paper. According to the different hardening rules of soil or rock around the pile shaft, such as work-softening, ideal elasto-plastic and work-hardening, a universal tri-linear load transfer model is suggested for the development of side and tip resistance by various types of soil (rock) with the consideration of sediment at the bottom of the pile. Based on the model, a formula is derived for the relationship between the settlement and load on the pile top to determine the vertical bearing capacity, taking into account such factors as the characteristics of the stratum, the side resistance along the shaft, and tip resistance under the pile tip. A close agreement of the calculated results with the measured data from a field test pile lends confidence to the future application of the present approach in engineering practice.
文摘Heat transfer between gas-solid multiphase flow and tubes occurs in many industry processes, such as circulating fluidized bed process, pneumatic conveying process, chemical process, drying process, etc. This paper focuses on the influence of the presence of particles on the heat transfer between a tube and gas-solid suspension. The presence of particles causes positive enhancement of heat transfer in the case of high solid loading ratio, but heat transfer reduction has been found for in the case of very low solid loading ratio (M s of less than 0.05 kg/kg). A useful correlation incorporating solid loading ratio, particle size and flow Reynolds number was derived from experimental data. In addition, the k-ε two-equation model and the Fluctuation-Spectrum- Random-Trajectory Model (FSRT Model) are used to simulate the flow field and heat transfer of the gas-phase and the solid-phase, respectively. Through coupling of the two phases the model can predict the local and total heat transfer characteristics of tube in gas-solid cross flow. For the total heat transfer enhancement due to particles loading the model predictions agreed well with experimental data.
基金Project(50621062) supported by the National Natural Science Foundation of China
文摘Prestressed high-strength-concrete (PHC) tube-shaped pile is one of the recently used foundations for soft soil. The research on uplift resistance of PHC pile is helpful to the design of pile foundations. A field-scale test program was conducted to study the uplift behavior and load transfer mechanism of PHC piles in soft soil. The pullout load tests were divided into two groups with different diameters, and there were three piles in each group. A detailed discussion of the axial load transfer and pile skin resistance distribution was also included. It is found from the tests that the uplift capacity increases with increasing the diameter of pile. When the diameter of piles increases from 500 to 600 mm, the uplift load is increased by 51.2%. According to the load-displacement (Q-S) curves, all the piles do not reach the ultimate state at the maximum load. The experimental results show that the piles still have uplift bearing capacity.
文摘Researches on ultra-high performance concrete (UHPC) have been conducted worldwide owing to its outstanding durability and strength performances. The exploitation of the mechanical properties of UHPC will render it possible to achieve economic design through substantial reduction in the cross sectional dimensions and simplification in the reinforcement arrangement. This paper investigates experimentally the load transfer in the prestressed concrete anchorage zone. To provide distinctive features of UHPC compared to ordinary concrete, the cross sectional dimensions of the member were reduced and the stress distribution, deformation and cracking pattern of the PS anchorage zone were examined experimentally according to the degree of reinforcement of the members chosen. The distributions of the bursting stress, spalling stress and longitudinal edge stress in the specimens were observed according to the various types of reinforcement. All the specimens satisfied the load-bearing capacity criterion specified by the European ETAG-013 guidelines and their stress distributions were similar to those in the PS anchorages of post-tensioned members applying ordinary concrete. The cracks propagated longitudinally with lengths up to twice the cross sectional dimensions and their width was smaller than when applying ordinary concrete owing to the bridging effect of the steel fibers in UHPC. Accordingly, the exploitation of the high strength of UHPC enabled us to secure the resistance of the anchorage with no need for particular reinforcing devices.
文摘The braking quality is considered the main execution of the adaptive control framework that impacts the vehicle safety and rides solace astoundingly notably the stopping distance.This research work aims to create a pattern and design of an electromechanically adjusted lever that multiplies the applied braking force depending on the inputs given by the sensors to reduce the stopping distance of the vehicle.It is carried out using two main parts of the two-wheeler vehicle:thefirst part deals with the detection of load acting on the vehicle and identifying the required braking force to be applied,and the second part deals with the micro-controller which activates the stepper motor for varying the mechanical leverage ratio from various loads on the vehicle using two actively movable wedges.The electromechanically operated variable braking force system is developed to actuate the braking system based on the load on the motorcycle.The MATLAB simulation and experimental work are carried out for various loading(driver and pillion)conditions on a two-wheeler.The results indicate that the proposed electronically operated braking system is more effective than the conventional braking system for various loads and vehicle speeds.Specifically,the stopping distance of the vehicle is decreased significantly by about 4.9%between the con-ventional braking system and the simulated proposed system.Further,the experi-mental results show that the stopping distance is condensed by about 4.1%.The validation between simulated and experimental results revealed a great deal with the least error percentage of about 0.8%.