The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode...The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode of the two can better meet the needs of the electric power system. This article first presents an analysis of the necessity and superiority of such mode, then explains its meaning and analyzes the working routes. Finally, it proposes the business modes as follows: low price pumping water electricity plus nuclear power in the near term;nuclear power shifted to pumped storage power participating in market competition in the middle term;and, in the long term, nuclear power shifted to pumped storage power as primary and serving as an electric power system when needed.展开更多
This paper focuses on pumped hydro energy storage(PHES)plants’current operations after electricity system reforms and variable renewable energy(VRE)installations in Japan.PHES plants have historically been developed ...This paper focuses on pumped hydro energy storage(PHES)plants’current operations after electricity system reforms and variable renewable energy(VRE)installations in Japan.PHES plants have historically been developed to create electricity demand at night in order to operate base load power plants,such as nuclear power plants,in stable conditions.Therefore,many PHES plants are located midway between nuclear power plants and large demand areas.However,all nuclear power plants had to–at least temporarily–shut down after the Great East Japan Earthquake followed by a nuclear accident at Fukushima Daiichi in 2011,and renewable energy power plants have been deployed rapidly after the introduction of a feed-in-tariff(FIT)scheme.Therefore,PHES plants are being used to mitigate fluctuations of VRE,especially in areas where renewable energy has been significantly installed.The daily highest capacity ratio of PHES plants in Kyushu area has recorded three times higher than it in the other areas where the past operating mode is still conducted.But those operations on PHES plants are simply followed as a dispatch rule of the Organization for Crossregional Coordination of Transmission Operators(OCCTO),market-based operations have not been conducted enough yet.The market design shall be changed to harmonize VRE installation and PHES plants’operations are necessary to make the transition from the past operating mode of PHES plants across Japan.展开更多
基金funded by the Project “Resource Characteristics of Main Watersheds and Key Issues in Development and Utilization of Hydroelectricity in South America and Africa”the National Science Foundation of China (U1766201)
文摘The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode of the two can better meet the needs of the electric power system. This article first presents an analysis of the necessity and superiority of such mode, then explains its meaning and analyzes the working routes. Finally, it proposes the business modes as follows: low price pumping water electricity plus nuclear power in the near term;nuclear power shifted to pumped storage power participating in market competition in the middle term;and, in the long term, nuclear power shifted to pumped storage power as primary and serving as an electric power system when needed.
文摘This paper focuses on pumped hydro energy storage(PHES)plants’current operations after electricity system reforms and variable renewable energy(VRE)installations in Japan.PHES plants have historically been developed to create electricity demand at night in order to operate base load power plants,such as nuclear power plants,in stable conditions.Therefore,many PHES plants are located midway between nuclear power plants and large demand areas.However,all nuclear power plants had to–at least temporarily–shut down after the Great East Japan Earthquake followed by a nuclear accident at Fukushima Daiichi in 2011,and renewable energy power plants have been deployed rapidly after the introduction of a feed-in-tariff(FIT)scheme.Therefore,PHES plants are being used to mitigate fluctuations of VRE,especially in areas where renewable energy has been significantly installed.The daily highest capacity ratio of PHES plants in Kyushu area has recorded three times higher than it in the other areas where the past operating mode is still conducted.But those operations on PHES plants are simply followed as a dispatch rule of the Organization for Crossregional Coordination of Transmission Operators(OCCTO),market-based operations have not been conducted enough yet.The market design shall be changed to harmonize VRE installation and PHES plants’operations are necessary to make the transition from the past operating mode of PHES plants across Japan.