期刊文献+
共找到122篇文章
< 1 2 7 >
每页显示 20 50 100
Numerical modeling of earthen dam breach due to piping failure 被引量:8
1
作者 Sheng-shui Chen Qi-ming Zhong Guang-ze Shen 《Water Science and Engineering》 EI CAS CSCD 2019年第3期169-178,共10页
Based on model tests of earthen dam breach due to piping failure, a numerical model was developed.A key difference from previous research is the assumption that the cross-section of the pipe channel is an arch, with a... Based on model tests of earthen dam breach due to piping failure, a numerical model was developed.A key difference from previous research is the assumption that the cross-section of the pipe channel is an arch, with a rectangle at the bottom and a semicircle at the top before the collapse of the pipe roof, rather than a rectangular or circular cross-section.A shear stress-based erosion rate formula was utilized, and the arched pipe tunnel was assumed to enlarge along its length and width until the overlying soil could no longer maintain stability.Orifice flow and open channel flow were adopted to calculate the breach flow discharge for pressure and free surface flows, respectively.The collapse of the pipe roof was determined by comparing the weight of the overlying soil and the cohesion of the soil on the two sidewalls of the pipe.After the collapse, overtopping failure dominated, and the limit equilibrium method was adopted to estimate the stability of the breach slope when the water flow overtopped.In addition, incomplete and base erosion, as well as one-and two-sided breaches were taken into account.The USDAARS-HERU model test P1, with detailed measured data, was used as a case study, and two artificially filled earthen dam failure cases were studied to verify the model.Feedback analysis demonstrates that the proposed model can provide satisfactory results for modeling the breach flow discharge and breach development process.Sensitivity analysis shows that the soil erodibility and initial piping position significantly affect the prediction of the breach flow discharge.Furthermore, a comparison with a well-known numerical model shows that the proposed model performs better than the NWS BREACH model. 展开更多
关键词 Earthen DAM PIPING FAILURE OVERTOPPING FAILURE Breach FLOW numerical modeling Sensitivity analysis
下载PDF
大截面矩形顶管施工对既有管线影响研究 被引量:1
2
作者 丰土根 周坤 +2 位作者 张箭 陈子昂 彭朋 《工程力学》 EI CSCD 北大核心 2024年第5期1-12,共12页
顶管施工会扰动邻近建筑物,危及工程安全。该文以苏州市城北路综合管廊元和塘段顶管工程为背景,通过ABAQUS有限元分析软件建立三维模型,研究顶管下穿地下管线施工对管周土及既有管线影响,并基于极限分析方法探讨了管线失稳模式。结果表... 顶管施工会扰动邻近建筑物,危及工程安全。该文以苏州市城北路综合管廊元和塘段顶管工程为背景,通过ABAQUS有限元分析软件建立三维模型,研究顶管下穿地下管线施工对管周土及既有管线影响,并基于极限分析方法探讨了管线失稳模式。结果表明:大直径矩形顶管顶进方向的影响范围约为2倍顶管宽度,两侧的影响范围约为1倍顶管宽度,地下管线到顶管轴线的水平距离为0.5倍~1倍顶管宽度时,应注意管线受到的水平方向附加荷载是否会导致管线破坏;管线与顶管相对位置对管线破坏影响较为显著,越靠近顶管的管线破坏越严重,滑移线由顶管两侧经由管线向地面发展,破坏部位由管线顶部两侧延伸至底部;除受与顶管相对位置影响外,管线破坏模式还受矩形顶管形状影响,管线顶部及靠近顶管顶角区域破坏风险最大。 展开更多
关键词 矩形顶管 数值模拟 地下管线 变形 极限分析上限法
下载PDF
矩形顶管临近地铁施工地表变形特性
3
作者 龚建伍 任浩 杨泰华 《土木工程与管理学报》 2024年第3期21-27,42,共8页
伴随城市地下空间的利用与开发,对于矩形顶管工程的应用愈加广泛,为探究临近地铁隧道情况下,矩形顶管近距离施工时地表的变形规律,依托顶管工程,利用MIDAS-GTS-NX软件进行顶管施工全过程模拟,分析了各施工参数数值的改变对地表变形的影... 伴随城市地下空间的利用与开发,对于矩形顶管工程的应用愈加广泛,为探究临近地铁隧道情况下,矩形顶管近距离施工时地表的变形规律,依托顶管工程,利用MIDAS-GTS-NX软件进行顶管施工全过程模拟,分析了各施工参数数值的改变对地表变形的影响。结果表明:(1)顶管顶进过程中,顶管机刀盘前方土体受挤压产生隆起变形,后方因地层损失以及出土卸荷而出现地表沉降,开挖面处地表隆起变形较大,地层扰动明显;(2)在一定范围内,增加掘进压力可以有效维持掌子面稳定,减小地表沉降,降低对周围建筑及临近地铁造成损害的风险;(3)增大注浆压力可以控制土体扰动,减小地表沉降,但本工程条件下,超过140 kPa会出现过度补偿作用,反而增加地表沉降;(4)摩阻力相对于掘进压力与注浆压力对地表变形的影响较小,但地表整体沉降反映出随摩阻力增大而增大的趋势。 展开更多
关键词 矩形顶管 地铁隧道 数值模拟 地表变形
下载PDF
钢管幕埋深及顶进顺序对地表变形的影响
4
作者 张兴其 杨新安 +2 位作者 李路恒 李赵翰青 袁齐虎 《科技创新与应用》 2024年第7期97-101,共5页
依托合肥市滨湖科学城庐州大道浅埋隧道段工程,利用有限差分软件FLAC 3D对不同埋深及顶进顺序下钢管幕顶进施工过程进行模拟。结合模型计算结果和监测数据分析,总结钢管幕埋深与顶进顺序对地表变形的影响。结果表明,先上后下的顶进方案... 依托合肥市滨湖科学城庐州大道浅埋隧道段工程,利用有限差分软件FLAC 3D对不同埋深及顶进顺序下钢管幕顶进施工过程进行模拟。结合模型计算结果和监测数据分析,总结钢管幕埋深与顶进顺序对地表变形的影响。结果表明,先上后下的顶进方案优于先下后上的方案,上部钢管的存在会减小下部钢管顶进对地表变形的影响;钢管的埋深越大,对于地表变形的影响也越大,下部钢管的顶进会扩大沉降范围和沉降值,上部钢管的顶进会使地表产生小幅隆起;从上至下依次顶进的方案为确定的最优方案,随着钢管顶进数量的不断增加,地表沉降量不断扩大,地表变形曲线从V形向W形转变,表明浅部钢管对地表变形有一定的控制作用。 展开更多
关键词 管幕法 公路隧道 顶管顺序 数值模型 监测分析
下载PDF
The influence of inter-band rock on rib spalling in longwall panel with large mining height
5
作者 Jiachen Wang Meng Li +3 位作者 Zhaohui Wang Zheng Li Han Zhang Shixiong Song 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2024年第4期427-442,共16页
In order to improve rib stability,failure criteria and instability mode of a thick coal seam with inter-band rock layer are analysed in this study.A three-dimensional mechanical model is established for the rib by con... In order to improve rib stability,failure criteria and instability mode of a thick coal seam with inter-band rock layer are analysed in this study.A three-dimensional mechanical model is established for the rib by considering the rock layer.A safety factor is defined foy the rib,and it is observed that the safety factor exhibits a positive correlation with the thickness and strength of the inter-band rock.A calculation method for determining critical parameters of the rock layer is presented to ensure the rib stability.It is revealed that incomplete propagation of the fracture at the hard rock constitutes a fundamental prerequisite for ensuring the rib stability.The influence of the position of the inter-band rock in the coal seam on failure mechanism of the rib was thoroughly investigated by developing a series of physical models for the rib at the face area.The best position for the inter-band rock in the coal seam is at a height of 1.5 m away from the roof line,which tends to provide a good stability state for the rib.For different inter-band rock positions,two ways of controlling rib by increasing supports stiffness and flexible grouting reinforcement are proposed. 展开更多
关键词 Rib spalling Inter-band rock Large mining height Limit analysis physical model experiment numerical simulation
下载PDF
机械顶管下穿河流时土体变形特征研究
6
作者 张峰 罗利 陈奇 《科技和产业》 2024年第4期254-261,共8页
以成都锦江再生水干管穿越河流顶管施工为研究背景,利用FLAC 3D软件模拟掘进,开展顶管施工数值分析。通过施工模型及其建模过程,研究顶管顶进时周边土体变形影响。结果表明,顶进过程中土体沉降沿掘进方向呈周期性变化,土体沉降量最大值... 以成都锦江再生水干管穿越河流顶管施工为研究背景,利用FLAC 3D软件模拟掘进,开展顶管施工数值分析。通过施工模型及其建模过程,研究顶管顶进时周边土体变形影响。结果表明,顶进过程中土体沉降沿掘进方向呈周期性变化,土体沉降量最大值发生在管道间接口处;不同泥水仓压力和注浆压力工况下,河道及两侧河岸地表沉降量以管道中线呈对称分布,管道上方地表沉降量最大,随着监测点向管道中线移动,地表沉降变化速率明显增大,且在中线附近变化速率显著减小。随着泥水仓压力的增大,土层变形量显著减小,而注浆压力的增大,土层变形量变化幅度较小。 展开更多
关键词 机械顶管 三维网格模型 模拟分析 注浆压力 土体变形
下载PDF
富水含砂软土地层施工对邻近桥梁影响分析
7
作者 汪小南 李立岩 裴启涛 《城市道桥与防洪》 2024年第5期263-267,278,M0023,共7页
针对深厚软土地层、高承压水等不利条件下的基坑开挖及顶管施工对邻近桥梁结构影响问题,以邻近武汉常青路高架桥梁某电力通道工程施工为背景,构建了三维数值分析模型,系统分析了基坑开挖及顶管施工对高架桥梁结构位移及受力的影响。研... 针对深厚软土地层、高承压水等不利条件下的基坑开挖及顶管施工对邻近桥梁结构影响问题,以邻近武汉常青路高架桥梁某电力通道工程施工为背景,构建了三维数值分析模型,系统分析了基坑开挖及顶管施工对高架桥梁结构位移及受力的影响。研究表明:基坑开挖及顶管施工引起的桥梁结构最大水平向、竖向位移分别为1.31 mm、1.13 mm,桥梁结构最大轴力、桥桩弯矩分别为6694.4 kN、263.3 kN·m,施工前后轴力累计变化率为-1.79%,弯矩累计变化率为1.35%,桥梁结构受力变化较小,均在规范限值以内,表明本工程设计方案是可行的、合理的。设计方案和研究成果可为邻近桥梁结构安全施工提供支撑。 展开更多
关键词 富水含砂 基坑开挖 顶管施工 桥梁 数值分析
下载PDF
顶管隧道施工对高速公路通道桥的影响分析
8
作者 尹正风 《北方交通》 2024年第1期77-80,共4页
依托辽西北供水盘锦应急支线供水工程顶管穿越京哈高速G1通道桥施工工程,采用有限元方法建立模型进行全过程模拟,分析了顶管施工过程对既有高速公路跨线桥产生的影响。结果表明:采用顶管施工的方法近距离穿越桥梁对桥梁产生的影响理论... 依托辽西北供水盘锦应急支线供水工程顶管穿越京哈高速G1通道桥施工工程,采用有限元方法建立模型进行全过程模拟,分析了顶管施工过程对既有高速公路跨线桥产生的影响。结果表明:采用顶管施工的方法近距离穿越桥梁对桥梁产生的影响理论上可以得到有效控制,为施工方案及加固措施的选取提供参考。 展开更多
关键词 顶管施工 通道桥 数值模拟 全过程分析
下载PDF
Oscillation heat transfer dynamic model for new type oscillation looped heat pipe with double liquid slugs
9
作者 鄂加强 朱蓉甲 +2 位作者 陈健美 龙艳 胡小峰 《Journal of Central South University》 SCIE EI CAS 2012年第11期3194-3201,共8页
In order to explain the oscillation heat transfer dynamics of closed loop oscillation heat pipe (CLOHP) with two liquid slugs,analysis on the forces and heat transfer process of the partial gas-liquid phase system inv... In order to explain the oscillation heat transfer dynamics of closed loop oscillation heat pipe (CLOHP) with two liquid slugs,analysis on the forces and heat transfer process of the partial gas-liquid phase system involving multiple parameters was carried out,and a new type oscillation heat transfer dynamic model of the CLOHP was set up based on conservation laws of mass,momentum and energy.Application results indicate that its oscillation heat transfer dynamics features depend largely on the filling rate,pipe diameter and difference in temperature.Besides,oscillation intensity and transfer performance can be improved to a large extent by increasing the temperature difference properly and enlarging the pipe diameter within a certain range under a certain filling rate. 展开更多
关键词 振荡热管 动力学模型 热循环 双液 传热过程 能量守恒定律 管道直径 动力学特性
下载PDF
曲线顶管底幕法施工对沉船扰动的CEL数值模拟 被引量:3
10
作者 周东荣 张家铭 +5 位作者 庄欠伟 黄昕 翟一欣 朱小东 张弛 张子新 《上海交通大学学报》 EI CAS CSCD 北大核心 2023年第S01期60-68,共9页
依托“长江口二号”沉船打捞工程,采用耦合欧拉-拉格朗日法对极小曲率半径矩形曲线顶管底幕法沉船打捞工程进行数值模拟分析,获得底幕施工过程中顶推力以及船体竖向位移的动态变化,并与模型试验结果进行了对比验证.结果表明:所提的数值... 依托“长江口二号”沉船打捞工程,采用耦合欧拉-拉格朗日法对极小曲率半径矩形曲线顶管底幕法沉船打捞工程进行数值模拟分析,获得底幕施工过程中顶推力以及船体竖向位移的动态变化,并与模型试验结果进行了对比验证.结果表明:所提的数值模型模拟结果和模型试验结果吻合较好,能较精确地预测沉船的变位和顶管的顶推力变化;最后一根管节推进为最危险工况,需要加强施工控制;采用左右对称推进而非顺序推进能够有效降低施工对沉船和土体的扰动. 展开更多
关键词 曲线顶管 沉船打捞 数值模拟 耦合欧拉-拉格朗日法
下载PDF
MJS不同加固方式对降低顶管施工影响的效果分析 被引量:4
11
作者 张双茁 高桂庆 +2 位作者 赖金星 张健伟 邱军领 《建筑科学与工程学报》 CAS 北大核心 2023年第5期183-191,共9页
基于西安市某下穿箱涵的管廊工程,建立管廊-土-箱涵有限元模型,探究在该工程中采用的水平旋喷桩(MJS)水平竖向组合加固工法对降低顶管施工过程的影响效果;建立不同桩距的2种水平桩工况,通过对不同工况下顶管在顶进过程中既有箱涵受力、... 基于西安市某下穿箱涵的管廊工程,建立管廊-土-箱涵有限元模型,探究在该工程中采用的水平旋喷桩(MJS)水平竖向组合加固工法对降低顶管施工过程的影响效果;建立不同桩距的2种水平桩工况,通过对不同工况下顶管在顶进过程中既有箱涵受力、变形以及相应地表沉降的不同变化进行分析,研究桩密度增加后对加固效果的影响;将数值模拟中采用组合加固后4个断面的地表沉降与在施工过程中对地表实际监测得到的地表沉降规律进行了比较。结果表明:采用MJS水平竖向桩组合加固方式能有效降低顶管施工过程中既有箱涵因顶管施工而产生的变形、内力以及相应的地表沉降;增加水平桩的数量并把桩间距减小50%时对加固效果的提升并不明显,故在实际工程中要合理设计桩的数量与间距并对桩的位置进行合理搭配;地表沉降数值模拟结果和实际监测结果的大小与趋势都十分相似,验证了数值模拟的准确性。 展开更多
关键词 地下工程 矩形顶管 数值分析 水平旋喷桩 加固
下载PDF
粉砂土地层浅埋顶管下穿高速公路路面变形分析 被引量:3
12
作者 郭水 张良 +2 位作者 刘淼 王利辉 赵鑫 《市政技术》 2023年第2期59-64,72,共7页
以某混凝土顶管下穿高速公路工程为例,采用ABAQUS有限元软件建立了三维数值模型,通过分析各施工阶段混凝土顶管的应力分布和损伤模型以及上覆路面的竖向位移变形,得出了顶管施工方法引起地面沉降的主要原因是施工过程中引起的各土层应... 以某混凝土顶管下穿高速公路工程为例,采用ABAQUS有限元软件建立了三维数值模型,通过分析各施工阶段混凝土顶管的应力分布和损伤模型以及上覆路面的竖向位移变形,得出了顶管施工方法引起地面沉降的主要原因是施工过程中引起的各土层应力重分布的结论,为后续顶管施工的研究提供了参考。 展开更多
关键词 顶管施工 粉砂土地层 路面变形 数值分析
下载PDF
杭州市下沙地区某顶管上穿已运营地铁隧道的实例分析 被引量:1
13
作者 黄建华 张宏建 +1 位作者 熊晓亮 陈俊辉 《地基处理》 2023年第S01期53-59,共7页
本文以杭州下沙地区电力隧道顶管上穿已运营隧道为例,介绍了顶管上穿时隧道的变形特性及对隧道的保护措施。杭州下沙地区分布深厚的粉砂土,粉砂土具有透水性好、易液化等特点,粉砂土层中顶管施工容易引发漏水事故,同时会引起土体变形进... 本文以杭州下沙地区电力隧道顶管上穿已运营隧道为例,介绍了顶管上穿时隧道的变形特性及对隧道的保护措施。杭州下沙地区分布深厚的粉砂土,粉砂土具有透水性好、易液化等特点,粉砂土层中顶管施工容易引发漏水事故,同时会引起土体变形进而带动周边隧道变形。顶管上穿隧道时,应采取必要措施加固土体。本文电力隧道顶管与隧道净距2 m,距离较近,上穿位置采用MJS加固,顶管穿越时间应选择在夜间地铁停运时间段,防止可能发生的次生事故影响地铁乘客的生命财产安全。通过三维数值计算分析顶管施工对隧道变形的影响,得到顶管穿越时地铁隧道的沉降变形值,并与实测数据进行了对比分析。结果表明,隧道最大沉降的数值计算值为1.57 mm,实测数据最大值为2.3 mm,顶管上穿时,隧道变形以竖向隆起为主,隧道变形理论计算值与实测值较为接近。本工程采用实时的自动化监测手段,并制定了合理的控制隧道变形的措施,可确保工程安全。 展开更多
关键词 粉砂土 MJS 顶管 上穿 地铁隧道 数值计算 实测分析
下载PDF
盾构隧道下穿顶管通道预保护方案对比研究 被引量:3
14
作者 史宇光 肖生明 +3 位作者 王艳 蒲亚君 姜远 杨旭坤 《公路工程》 2023年第5期21-28,共8页
某地下通道顶管工程施工前,根据地下空间规划已知有规划地铁隧道将从下方穿过。为减少后期盾构下穿施工对顶管通道的不利影响,提出了采用旋喷桩门型加固的方法对顶管通道进行预保护。采用有限元软件对不同预保护方案下盾构下穿施工进行... 某地下通道顶管工程施工前,根据地下空间规划已知有规划地铁隧道将从下方穿过。为减少后期盾构下穿施工对顶管通道的不利影响,提出了采用旋喷桩门型加固的方法对顶管通道进行预保护。采用有限元软件对不同预保护方案下盾构下穿施工进行数值模拟,分析了不同预保护方案下顶管通道的变形控制效果。模拟结果表明:旋喷桩门型加固对于顶管通道的变形控制效果显著,顶管通道的沉降变形得到了明显控制;双线盾构隧道穿越后,顶管通道的竖向位移曲线呈“W”型,符合类似工程监测规律;门型加固可以有效减少地表沉降,双线隧道穿越后,地表变形最大处居于隧道中心线正上方。采用水平加固体预保护方案地表沉降为无预保护方案地表沉降的80.8%;采用门型加固预保护方案地表沉降为无预保护方案地表沉降的58.5%。 展开更多
关键词 盾构 预保护 数值分析 顶管通道 旋喷桩
下载PDF
大断面矩形顶管重力锚固基础力学特性分析
15
作者 黄建华 叶剑波 《人民长江》 北大核心 2023年第6期140-146,共7页
随着顶管断面尺寸的不断增大,顶管工程对顶推力的需求也在逐步增大。由于滨海软土具有承载力低且压缩性高的特点,因此传统后座墙式的反力结构无法提供安全稳定的顶推反力,其已经不适用于该类地区的顶管工程。为此针对滨海软土地区的顶... 随着顶管断面尺寸的不断增大,顶管工程对顶推力的需求也在逐步增大。由于滨海软土具有承载力低且压缩性高的特点,因此传统后座墙式的反力结构无法提供安全稳定的顶推反力,其已经不适用于该类地区的顶管工程。为此针对滨海软土地区的顶管工程创新性地提出了一种新型反力结构——重力锚固基础。采用三维有限元分析软件对顶管施工过程中的重力锚固基础进行模拟,研究重力锚固基础的力学特性。结果表明:顶推反力将会造成基础底板的局部应力集中与非均匀变形;重力锚固基础利用基础底板、凸榫、锚杆和复合地基的组合结构有效抵消了顶推反力,控制了基础底板的位移与变形;重力锚固基础会因基础底板的向上翘曲变形而损失摩擦力,需使用锚杆控制翘曲变形。相关成果对新型重力锚固基础的设计有重要参考价值。 展开更多
关键词 顶管工程 重力锚固基础 滨海软土 数值分析
下载PDF
黄土斜坡地震稳定性研究的若干方法
16
作者 吴义文 李孝波 +1 位作者 周兴浩 段俊杰 《防灾科技学院学报》 2023年第2期63-71,共9页
黄土斜坡地震稳定性研究是保障黄土地区工程建设安全的基础。基于斜坡地震稳定性研究方法的现状,对黄土斜坡地震稳定性研究中常用的拟静力法、Newmark滑块分析法、数值分析法及物理模型试验法等进行了简要评述,总结归纳了不同方法的特... 黄土斜坡地震稳定性研究是保障黄土地区工程建设安全的基础。基于斜坡地震稳定性研究方法的现状,对黄土斜坡地震稳定性研究中常用的拟静力法、Newmark滑块分析法、数值分析法及物理模型试验法等进行了简要评述,总结归纳了不同方法的特点及适用性,展望了后续研究亟需解决的问题,对进一步开展黄土斜坡地震稳定性研究工作具有一定参考价值。 展开更多
关键词 黄土斜坡 地震稳定性 拟静力法 数值分析法 物理模型试验法
下载PDF
竖缝式鱼道在实际工程中的设计与试验分析
17
作者 韩雷 刘发智 +3 位作者 赵兴龙 叶昆河 李树航 李洋 《水电能源科学》 北大核心 2023年第7期146-149,131,共5页
鉴于竖缝式鱼道能够较好地适应上下游水位变化、水流条件好等特点,以某实际工程鱼道为例,以隔板和导板的不同尺寸和型式为变化参数,设计出3种池室体型进行数学模型试验,采用1∶5比尺的物理模型对数学模型进行验证后,通过数值模拟的计算... 鉴于竖缝式鱼道能够较好地适应上下游水位变化、水流条件好等特点,以某实际工程鱼道为例,以隔板和导板的不同尺寸和型式为变化参数,设计出3种池室体型进行数学模型试验,采用1∶5比尺的物理模型对数学模型进行验证后,通过数值模拟的计算,分析了不同隔板、导板尺寸和型式下池室结构对鱼道池室内的水流流态、池室最大流速、主流区水力特性的影响,并利用比尺为1∶5物理模型对优化后的体型进行局部物理模型试验,通过比尺为1∶20整体物理模型对沿程水深及竖缝处最大流速进行分析,并提出不同水深条件下,鱼道的引水流量,为相似工程提供了参考和借鉴的作用。 展开更多
关键词 水力学 鱼道设计 数值模拟 物理模型 试验分析
下载PDF
基于变形控制的密排管幕顶管施工顺序优化分析
18
作者 陈凯 《铁道勘察》 2023年第5期149-157,共9页
管幕可以为隧道施工提供强度较大的超前支护。为择优选择管幕施工顺序,减少管幕施工对地表沉降影响,以合肥大连路隧道工程为例,采用三维数值分析方法,考虑“先下排后上排连续顶入/先上排后下排连续顶入、先上排后下排间隔顶入”3种顶入... 管幕可以为隧道施工提供强度较大的超前支护。为择优选择管幕施工顺序,减少管幕施工对地表沉降影响,以合肥大连路隧道工程为例,采用三维数值分析方法,考虑“先下排后上排连续顶入/先上排后下排连续顶入、先上排后下排间隔顶入”3种顶入顺序,研究不同管幕施工顺序对地表沉降的影响规律。研究结果表明:(1)上排顶管形成的土拱效应对下排起到保护作用,故最佳施工顺序为:先施工管幕上排顶管,再施工两侧及下排顶管;(2)由于顶管端头的高压旋喷加固和端部结构约束,管幕顶进引起的地表变形呈现端部小,中间大的特征;(3)侧排顶管不影响沉降叠加区最大沉降值,横向地表沉降曲线类似于S形,地表沉降最大值为12.7 mm,最终影响范围为24 m。 展开更多
关键词 隧道工程 管幕 顶管 变形控制 施工优化 数值分析
下载PDF
复杂地质条件下矩形顶管下穿管线影响分析
19
作者 李兴龙 蔺文帅 《高速铁路技术》 2023年第2期94-100,共7页
为研究矩形顶管施工对邻近管线的影响,以某铁路出入口顶管工程为依托,建立三维数值模型对矩形顶管近接下穿管线过程中管线和地表变形规律进行研究,并结合现场实测数据进行分析。研究结果表明:(1)矩形顶管施工引起的地表变形以沉降为主,... 为研究矩形顶管施工对邻近管线的影响,以某铁路出入口顶管工程为依托,建立三维数值模型对矩形顶管近接下穿管线过程中管线和地表变形规律进行研究,并结合现场实测数据进行分析。研究结果表明:(1)矩形顶管施工引起的地表变形以沉降为主,隧道上方土体产生了向隧道中心靠拢的趋势,地表沉降最大值16.3 mm,位于隧道中间位置,沉降影响范围为20 m;(2)受接收井的临空开挖面和施加在始发井的顶推力影响,开挖结束后接收井和始发井地表产生隆起,隆起最大值达到1.95 mm;(3)受土体挤压,管线水平位移最大值达到0.64 mm;在控制好管线沉降变形同时,也要注意对其施加水平约束,避免水平位移过大导致破坏;(4)管线变形和变形速率均在安全控制指标之内,数值模拟的管线变形规律与实测数据大致相同,数值模拟的地表和各管线变形规律是可信的。 展开更多
关键词 矩形顶管 地铁车站 地下管线 数值模拟 影响分析
下载PDF
大直径砼顶管的管道受力特性分析 被引量:24
20
作者 雷晗 陈锦剑 +1 位作者 王建华 朱熊 《上海交通大学学报》 EI CAS CSCD 北大核心 2011年第10期1493-1497,共5页
为优化现有的顶管管道受力模式及其设计方法,结合上海市污水治理南线工程,采用数值模拟方法,对内径4 m的大直径钢筋混凝土顶管管道的受力特性进行了分析,研究了施工过程中管土接触压力的变化及顶管覆土厚度对管道外土压力的影响,比较了... 为优化现有的顶管管道受力模式及其设计方法,结合上海市污水治理南线工程,采用数值模拟方法,对内径4 m的大直径钢筋混凝土顶管管道的受力特性进行了分析,研究了施工过程中管土接触压力的变化及顶管覆土厚度对管道外土压力的影响,比较了管道受力分布与《给水排水工程顶管技术规程》的区别,并分析了管道内力的差异.计算结果表明:土拱效应随覆土厚度的增加逐渐增强,管土接触压力分布比较平均,侧向土压力采用主动土压力计算偏于保守,地基反力也可适当均匀化,并且在此基础上的管道弯矩减小,轴力相应增大.因此,管道设计可以进一步优化,使工程更加经济. 展开更多
关键词 顶管 大直径 土拱效应 受力模式 数值模拟
下载PDF
上一页 1 2 7 下一页 到第
使用帮助 返回顶部