期刊文献+
共找到335篇文章
< 1 2 17 >
每页显示 20 50 100
Experimental Study on the Sinking and Leveling of A Large-Capacity Offshore Wind Turbine Five-Bucket Foundation in Sand
1
作者 LIAN Ji-jian ZHU Hang +2 位作者 GUO Yao-hua WANG Hai-jun YU Tong-shun 《China Ocean Engineering》 SCIE EI CSCD 2024年第4期586-601,共16页
As offshore wind farms expand into deeper and farther ocean regions and the unit capacity of offshore wind turbines(OWTs)increases,there is a pressing need for a new foundation structure that can accommodate deep-sea ... As offshore wind farms expand into deeper and farther ocean regions and the unit capacity of offshore wind turbines(OWTs)increases,there is a pressing need for a new foundation structure that can accommodate deep-sea conditions and support large capacities while maintaining economical and safe.To meet this goal of integrated transportation and one-step installation,a novel five-bucket jacket foundation(FBJF),with its suction installation and leveling methods in sand,has been proposed,analyzed and experimentally studied.First,seepage failure experiments of the FBJF at various depths were conducted,and a formula for calculating the critical suction of seepage failure suitable for the FBJF in sand was chosen and recommended for use with a range of values for the permeability coefficient ratio.Second,through leveling experiments of the FBJF at different depths,the maximum adjustable leveling angle during the sinking process was defined using seepage failure and the adjustable leveling angle of the foundation as control criteria.Various leveling control strategies were proposed and verified.Finally,an automatic sinking and leveling control system for the FBJF was developed and experimentally verified for feasibility. 展开更多
关键词 offshore wind turbine(OWT) bucket foundation seepage failure suction installation
下载PDF
Numerical Simulation of Float-Over Installation for Offshore Platform 被引量:1
2
作者 Yuesheng Ma Lihao Yuan +1 位作者 Yingfei Zan Fuxiang Huang 《Journal of Marine Science and Application》 CSCD 2018年第1期79-86,共8页
In this paper,a numerical investigation of a float-over installation for an offshore platform is presented to verify the feasibility of the actual installation.The hydrodynamic performance of a T-barge is investigated... In this paper,a numerical investigation of a float-over installation for an offshore platform is presented to verify the feasibility of the actual installation.The hydrodynamic performance of a T-barge is investigated in the frequency domain,and the coupled motions are analyzed in the time domain.We then compare with those of the model test and determine that the response amplitude operator and the time series agree quite well.The barge exhibits favorable hydrodynamic behavior in the considered sea state,and the equipment loads are allowable.Themooring systemand sway fender forces are within the permissible range.Based on these results,we can verify that the actual installation of the offshore platform is feasible.We accurately simulated many important factors and effectively reduced the risk associated with the offshore installation,which is of great importance.As such,we demonstrate that the numerical simulation of the float-over installation for offshore platforms has practical engineering significance. 展开更多
关键词 Float-over installation offshore platform T-barge Model test MOORING system FENDER collision force Numerical simulation
下载PDF
Overview of flowline bundle technology from concept selection to offshore installation
3
作者 Song Ruxin Xia Qiuling 《Engineering Sciences》 EI 2013年第4期10-16,共7页
Flowline bundle system consisting of carrier pipe,sleeve pipe and internal flowlines offers innovative solution for the infield transportation of oil and gas. Due to its features,flowline bundle offers a couple of adv... Flowline bundle system consisting of carrier pipe,sleeve pipe and internal flowlines offers innovative solution for the infield transportation of oil and gas. Due to its features,flowline bundle offers a couple of advantages over conventional flowline in particular for cases where multi-flowlines and high thermal performance is of great interest. The main benefits and advantages of such system include excellent thermal performance to prevent wax formation and hydrates,multiple bundled flowlines,mechanical and corrosion protection,potential reuse, etc. With the developments of offshore oil and gas industries,more and more hydrocarbon resources are being explored and discovered from shallow to deep water. Pipeline bundle system can be a smart solution for certain applications,which can be safe and cost effective solution. The objective of this paper is to overview pipeline bundle technology,outline detailed engineering design issue and procedure. Focus is given to its potential application in offshore for infield transportation. Engineering design principles and procedures for pipeline bundle system are highlighted. Construction methods of flowline bundle onshore are reviewed. Offshore towing and installation of pipeline bundle procedure is outlined. 展开更多
关键词 offshore pipelines flowlines BUNDLES DEEPWATER design installation
下载PDF
Numerical Study of a Novel Procedure for Installing the Tower and Rotor Nacelle Assembly of Offshore Wind Turbines Based on the Inverted Pendulum Principle 被引量:10
4
作者 Wilson Guachamin Acero Zhen Gao Torgeir Moan 《Journal of Marine Science and Application》 CSCD 2017年第3期243-260,共18页
Current installation costs of offshore wind turbines(OWTs) are high and profit margins in the offshore wind energy sector are low, it is thus necessary to develop installation methods that are more efficient and pract... Current installation costs of offshore wind turbines(OWTs) are high and profit margins in the offshore wind energy sector are low, it is thus necessary to develop installation methods that are more efficient and practical. This paper presents a numerical study(based on a global response analysis of marine operations) of a novel procedure for installing the tower and Rotor Nacelle Assemblies(RNAs) on bottom-fixed foundations of OWTs. The installation procedure is based on the inverted pendulum principle. A cargo barge is used to transport the OWT assembly in a horizontal position to the site, and a medium-size Heavy Lift Vessel(HLV) is then employed to lift and up-end the OWT assembly using a special upending frame. The main advantage of this novel procedure is that the need for a huge HLV(in terms of lifting height and capacity) is eliminated. This novel method requires that the cargo barge is in the leeward side of the HLV(which can be positioned with the best heading) during the entire installation. This is to benefit from shielding effects of the HLV on the motions of the cargo barge, so the foundations need to be installed with a specific heading based on wave direction statistics of the site and a typical installation season. Following a systematic approach based on numerical simulations of actual operations, potential critical installation activities, corresponding critical events, and limiting(response) parameters are identified. In addition, operational limits for some of the limiting parameters are established in terms of allowable limits of sea states. Following a preliminary assessment of these operational limits, the duration of the entire operation, the equipment used, and weather-and water depth-sensitivity, this novel procedure is demonstrated to be viable. 展开更多
关键词 offshore wind turbine installation crane vessel shielding effects critical events limiting parameters inverted pendulum allowable sea states
下载PDF
Dynamic analysis of an offshore pipe laying operation using the reel method 被引量:5
5
作者 Marek Szczotka 《Acta Mechanica Sinica》 SCIE EI CAS CSCD 2011年第1期44-55,共12页
A system designed for a rigid and flexible pipe laying purposes is presented in the paper.Mathematical and numerical models are developed by using the rigid finite element method(RFEM).The RFEM is an efficient solut... A system designed for a rigid and flexible pipe laying purposes is presented in the paper.Mathematical and numerical models are developed by using the rigid finite element method(RFEM).The RFEM is an efficient solution in the time domain.Static and dynamic problems related to pipe installation are solved by taking the advantage of simple interpretation and implementation of the method.Large deformations of the pipe during spooling and when it is reeled out at sea are considered.A material model implemented is used to take into consideration nonlinear material properties.In particular,the full elasto-plastic material characteristics with hardening and Bauschinger effect are included.Dynamic analyses are performed and the results attached in this work demonstrates how the sea conditions influence the machinery and pipeline,assuming a passive reel drive system. The influence of several other operational parameters on dynamic loads is verified.An active system,implemented as a part of the mathematical model,improves the system performance.Some results are presented as well. 展开更多
关键词 offshore pipeline installation · Reel vessel · Large elasto-plastic deformations
下载PDF
Some Innovations for Offshore and Harbor Berths Construction
6
作者 Doubrovsky Michael Kaluzhnaya Valentina +1 位作者 Kaluzhniy Alexey Oganesyan Virginia 《Journal of Shipping and Ocean Engineering》 2015年第3期115-122,共8页
Some new innovative constructions and piling technologies for improvement of offshore and port berthing structures are worked out and discussed. The aims of innovations are to decrease required power of construction ... Some new innovative constructions and piling technologies for improvement of offshore and port berthing structures are worked out and discussed. The aims of innovations are to decrease required power of construction (in particular, piling) equipment and, correspondingly, to improve environmental situation at the construction site. Another achieved goal is providing long tubular piles installation in hard soils conditions without application of very heavy and powerful driving machines. Worked out solutions are based on two approaches. One of them provides separate loading of driving force on pile's shaft and pile's tip concentrating the whole driving force on one of the mentioned parts of the pile. Another approach is focused on prevention of soil plug formation inside of the tubular pile tip facilitating the pile installation process. Also improved anchorage system for sheet piling seafront walls is presented and discussed. All considered innovations are patented and can be used in wide range of marine, offshore, coastal and harbor structures. 展开更多
关键词 offshore structures port structures tubular piles piles installation sheet-piling walls anchor system.
下载PDF
European Offshore Wind Gravity Foundation
7
作者 LI Lei GUO Peijun LYU Tao 《International Journal of Plant Engineering and Management》 2022年第1期53-64,共12页
The development history of the offshore wind gravity foundation in Europe is briefly introduced.Sumnarized in which the equipment relates to offshore wind power installation,including ships and special equipment relat... The development history of the offshore wind gravity foundation in Europe is briefly introduced.Sumnarized in which the equipment relates to offshore wind power installation,including ships and special equipment related to wind power installation.And the installation method and technology of gravity foundation are analyzed.The development trend of the offshore wind power gravity foundation is put forward. 展开更多
关键词 offshore wind power bottom fixed foundation installation technology offshore installation vessel marine equipment
下载PDF
砂土中桩靴插桩对临近筒型基础的影响研究
8
作者 乐丛欢 胡灏 +3 位作者 王昕 任建宇 张浦阳 丁红岩 《太阳能学报》 EI CAS CSCD 北大核心 2024年第2期95-101,共7页
通过物理模型试验和有限元法研究砂土中风电安装船桩靴插桩对临近筒型基础的影响。首先通过物理模型试验,验证有限元模型的合理性,初步确定桩靴在砂土中贯入的影响范围大致在2.5倍桩靴直径。基于有限元CEL方法进一步研究桩靴和筒型基础... 通过物理模型试验和有限元法研究砂土中风电安装船桩靴插桩对临近筒型基础的影响。首先通过物理模型试验,验证有限元模型的合理性,初步确定桩靴在砂土中贯入的影响范围大致在2.5倍桩靴直径。基于有限元CEL方法进一步研究桩靴和筒型基础的净距与桩靴直径之比(S/D)对筒型基础在位稳定性的影响。结果表明:筒型基础的倾斜率、最大竖向位移以及筒壁应力随着S/D的增大而逐渐减小,插桩过程中,靠近桩靴一侧的筒裙和分舱板应力远大于远离桩靴一侧的筒型基础应力,且筒顶的土压力远小于筒底土压力。 展开更多
关键词 海上风电 自升式安装船 数值模拟 插桩 筒型基础
下载PDF
基于CREAM方法的海上风机安装人因可靠性评估
9
作者 杜尊峰 刘治余 +1 位作者 杨源 赵亚琦 《中国海洋平台》 2024年第3期27-34,共8页
采用认知可靠性和差错分析法(Cognitive Reliability and Error Analysis Method,CREAM)对固定式海上风机安装作业的人因可靠性进行评估,并引入结构熵权法和马尔可夫方法对传统CREAM进行改进,实现人因差错概率、平均人为差错时间等人因... 采用认知可靠性和差错分析法(Cognitive Reliability and Error Analysis Method,CREAM)对固定式海上风机安装作业的人因可靠性进行评估,并引入结构熵权法和马尔可夫方法对传统CREAM进行改进,实现人因差错概率、平均人为差错时间等人因可靠性指标的定量计算。在充分结合现实条件的情况下,考虑海上风机安装的天气、海浪和操作水平等环境和人为因素的影响,针对固定式海上风机安装作业的要求和特点,结合作业人员可靠性评估结果,从操作素质、组织管理、环境改善等方面提出发展建议。 展开更多
关键词 海上风机安装 人因可靠性评估 CREAM
下载PDF
海洋石油平台工艺管线安装技术及质量控制探析 被引量:1
10
作者 陈林 《化工管理》 2024年第12期59-61,共3页
石油化工产业的发展对我国经济的稳定增长具有重要影响,同时石油化工产业发展水平也成为衡量国家工业化发展程度的重要标尺。中国对于石油化工产业的发展给予了高度重视,其中石油运输过程中因受环境因素影响较大,对石油运输管线的质量... 石油化工产业的发展对我国经济的稳定增长具有重要影响,同时石油化工产业发展水平也成为衡量国家工业化发展程度的重要标尺。中国对于石油化工产业的发展给予了高度重视,其中石油运输过程中因受环境因素影响较大,对石油运输管线的质量提出了更高的要求,不断提升运输管线安装技术和质量是保障石油化工产业健康发展的关键。基于此,文章对海洋石油平台工艺管线安装进行了简要的概述,并分析了管线安装现状,进而具体探讨了管线安装技术及质量控制措施。 展开更多
关键词 海洋石油平台 工艺管线 石油运输
下载PDF
漂浮式海上风机施工安装现状与发展趋势及技术挑战
11
作者 赵树杰 白浩哲 +4 位作者 徐琨 杜君峰 张敏 袁文永 李华军 《中国海洋大学学报(自然科学版)》 CAS CSCD 北大核心 2024年第10期13-28,共16页
漂浮式海上风机是开发和利用海上风能资源的关键技术装备,对拓展海上风电的开发空间具有重要战略意义。施工安装是漂浮式海上风机全生命周期的重要环节,也是实现海上风电经济、安全和高效开发的关键。然而随着海上风机的深远海和大型化... 漂浮式海上风机是开发和利用海上风能资源的关键技术装备,对拓展海上风电的开发空间具有重要战略意义。施工安装是漂浮式海上风机全生命周期的重要环节,也是实现海上风电经济、安全和高效开发的关键。然而随着海上风机的深远海和大型化发展,施工安装难度大幅提升,现有安装工艺及技术装备无法满足其安装作业需求。本文首先回顾了国内、外漂浮式海上风机发展历程,展望了未来漂浮式海上风机在降本增效以及解决施工安装难题中的创新设计理念;然后在此基础上,通过工程案例分析,总结梳理漂浮式海上风机运输安装工艺,分析漂浮式海上风机运输安装关键问题与技术挑战;最后针对漂浮式海上风机施工安装难题,从新工艺、新装备和新技术等方面提出发展建议,以期为漂浮式海上风电迈向深远海提供参考。 展开更多
关键词 漂浮式海上风机 施工安装 深远海 多体系统 数字化技术
下载PDF
海上风电海缆风机端弯曲保护装置及安装技术研究
12
作者 林峰 李斯魏 +6 位作者 薛驰 胡明 汤洋 石彦彪 王中权 张永明 张永康 《机电工程技术》 2024年第9期12-16,46,共6页
由于海缆弯曲刚度较小,在风机单桩基础附近的这段海缆在位运行过程中受到洋流、涌浪、潮汐等动态载荷作用下,海缆容易发生弯曲破坏,因此需要对海缆采取弯曲保护措施。提出一种夹具倒刺型海缆弯曲保护装置,并详细介绍了该夹具倒刺型海缆... 由于海缆弯曲刚度较小,在风机单桩基础附近的这段海缆在位运行过程中受到洋流、涌浪、潮汐等动态载荷作用下,海缆容易发生弯曲破坏,因此需要对海缆采取弯曲保护措施。提出一种夹具倒刺型海缆弯曲保护装置,并详细介绍了该夹具倒刺型海缆弯曲保护装置的工作原理以及接入风机基础的安装流程和注意事项。相对于传统的海缆弯曲保护方式而言,该装置不需要J形管及配套的金属套笼,采用的多层交错自回弹的倒刺卡齿结构,可以将海缆定位限制在风机塔筒壁的电缆开孔处,尾部的弯曲限制器保证了对悬空段海缆的弯曲保护,有效保证了海缆安全的同时又降低了工程造价。研究成果能够为我国海上风电场建设中的海缆弯曲保护提供技术参考。 展开更多
关键词 海上风电 海缆弯曲保护 装置与安装
下载PDF
盲法兰错位无应力对接装置在海洋平台立管安装中的应用
13
作者 张国冻 杨启福 +2 位作者 杨森 邓冠华 于成龙 《天津科技》 2024年第4期110-112,共3页
在海洋平台立管安装作业中,立管支撑法兰与桩腿侧法兰往往会存在一定错位量,传统的螺栓连接会造成立管应力积聚和损伤,安装难度大、风险高。经过设计完善和多次陆地试验,研究出一种盲法兰错位对接装置,以U型扣板代替螺栓来限制盲法兰的... 在海洋平台立管安装作业中,立管支撑法兰与桩腿侧法兰往往会存在一定错位量,传统的螺栓连接会造成立管应力积聚和损伤,安装难度大、风险高。经过设计完善和多次陆地试验,研究出一种盲法兰错位对接装置,以U型扣板代替螺栓来限制盲法兰的各向自由度,安装位置可随盲法兰的错位量调节,对立管上的各支撑盲法兰的错位量进行补偿,可以实现立管的无应力对接。通过介绍盲法兰错位对接装置在某平台立管安装施工中的成功应用,为类似工程施工提供经验借鉴。 展开更多
关键词 盲法兰错位 海洋平台 立管安装 应力
下载PDF
海上风电机组安装施工方法现状、研究进展与展望
14
作者 金晶哲 高震 《船舶》 2024年第3期1-20,共20页
随着全球海上风电产业规模迅速扩大、风机单机容量不断增加以及风电场逐渐向深远海发展,海上风机在安装施工方面的难度与成本不断上升。为应对这一形势,需要深入研究和细化适用于大型风机(10 MW及以上)在较深水域和恶劣海况下的安装方... 随着全球海上风电产业规模迅速扩大、风机单机容量不断增加以及风电场逐渐向深远海发展,海上风机在安装施工方面的难度与成本不断上升。为应对这一形势,需要深入研究和细化适用于大型风机(10 MW及以上)在较深水域和恶劣海况下的安装方法。因此,该文整理和介绍了目前海上风电机组的主要安装方法和海上风电安装船的特性以及在未来的发展需求;在此基础上,对现阶段海上风机安装难点进行总结。文中进一步回顾了海上风机安装数值模拟方面的研究工作进展,并详细讨论了将数值模拟与风机安装的计划阶段和现场施工阶段相结合的方案,以提高安装效率,保障安全施工。 展开更多
关键词 海上风电机组 固定式风机 漂浮式风机 海上风机安装 风电安装船
下载PDF
海上风电机组吊装技术研究
15
作者 张吉海 郑康胜 +5 位作者 王耀武 金晔 冯学斌 赵大文 李成良 张永康 《机电工程技术》 2024年第9期22-26,116,共6页
在海上风电产业大力发展的过程中,风电机组吊装作业成为制约海上风电场建设施工的关键环节之一,其中海域环境的复杂多变性、选用船舶设备的适应性、安装工艺流程的科学性等因素均决定着风电机组安装的成败。基于江苏启东某海上风电工程... 在海上风电产业大力发展的过程中,风电机组吊装作业成为制约海上风电场建设施工的关键环节之一,其中海域环境的复杂多变性、选用船舶设备的适应性、安装工艺流程的科学性等因素均决定着风电机组安装的成败。基于江苏启东某海上风电工程,充分考虑了工程海域的潮位、潮流特征等海洋气象环境的影响,选择并校核了风电安装船等船舶设备的性能适应性。同时在开阔海域下,探讨了施工前的准备作业以及风机吊装施工流程的优化,包括对塔筒、机舱、轮毂和叶片等附件预拼接作业进行了阐述,其中重点分析了塔筒吊装、机舱-轮毂组合体吊装以及风机叶片吊装的安装精度控制措施。该工艺流程有效保证了风机吊装作业满足设计和规范的要求,同时也提高了风机安装的施工精度与效率,旨在为后续海上风电工程的发展提供参考。 展开更多
关键词 海上风电 风电机组 风电安装船 吊装设备 施工工艺
下载PDF
FPSO锚桩海上安装作业流程的优化
16
作者 陈晓 张宝雷 《天津科技》 2024年第4期87-89,共3页
阐述浮式生产储卸油装置(FPSO)单点系泊系统锚桩的海上安装程序,通过优化作业步骤、改进作业工具等,统筹兼顾,提高锚桩海上施工效率,为今后类似锚桩海上安装作业流程的优化提供借鉴。
关键词 浮式生产储卸油装置(FPSO) 系泊 锚桩 海上安装
下载PDF
半潜坐底式海上风电安装船设计与开发
17
作者 宋永在 杜松 李楷 《造船技术》 2024年第3期16-20,88,共6页
适用于海上浅水区域作业的半潜坐底式海上风电安装船具有安全性好、施工效率高和成本低等特点,其设计的特殊性在于需要考虑海流冲蚀泥沙导致的坐底面积丧失。以开发的一艘典型实船为例,阐述主要功能,提出坐底稳定性应考虑的两种工况,采... 适用于海上浅水区域作业的半潜坐底式海上风电安装船具有安全性好、施工效率高和成本低等特点,其设计的特殊性在于需要考虑海流冲蚀泥沙导致的坐底面积丧失。以开发的一艘典型实船为例,阐述主要功能,提出坐底稳定性应考虑的两种工况,采用有限元计算对坐底工况结构强度进行校核,对在软泥和粉砂两种地质条件下进行作业给出应对措施,可为同类型船的设计提供一定技术参考。 展开更多
关键词 半潜坐底式海上风电安装船 坐底稳定性 结构强度 坐底面积丧失 海上浅水区域
下载PDF
基于离散数值分析技术的海上风电机组安装施工规划模拟研究
18
作者 马宇轩 闵烨 +1 位作者 闫中杰 张坤鹏 《太阳能学报》 EI CAS CSCD 北大核心 2024年第6期673-679,共7页
海上风电机组安装主要包括多船舶联合施工、单船自运输安装施工两种方式。海上风电场建设中,风电机组安装施工费用占有较大比重,进行整体施工规划分析可以为宏观决策提供量化依据。鉴于此,采用离散数值分析模拟技术,以实际工程项目施工... 海上风电机组安装主要包括多船舶联合施工、单船自运输安装施工两种方式。海上风电场建设中,风电机组安装施工费用占有较大比重,进行整体施工规划分析可以为宏观决策提供量化依据。鉴于此,采用离散数值分析模拟技术,以实际工程项目施工限制条件和风浪流数据为计算参数,对项目总工期和怠机时长等进行数值模拟,以比较上述两种模式的施工效率优劣。结果表明,相对航行距离在359.26 km前,单船模式施工累计耗时高于多船模式,超过该距离后,多船模式逐渐高于单船模式;多船模式怠机抵抗性能整体上优于单船模式。 展开更多
关键词 计算机模拟 海上风电机组 施工设备 整体施工规划 船机利用率
下载PDF
大口径高压输气海底软管及成套设备研究应用
19
作者 刘立辉 陈大江 《船海工程》 北大核心 2024年第S01期87-91,共5页
为实现大口径高压海底输气软管的国产化应用,以南海某高温高压气田大口径国产输气软管为例,通过研究应用,实现软管及成套设备国产化,建立基于数值分析的大口径输气软管设计和制造质量保障体系,以及安全高效跨越海管和免海水进入的安装... 为实现大口径高压海底输气软管的国产化应用,以南海某高温高压气田大口径国产输气软管为例,通过研究应用,实现软管及成套设备国产化,建立基于数值分析的大口径输气软管设计和制造质量保障体系,以及安全高效跨越海管和免海水进入的安装方法。 展开更多
关键词 海底软管 国产化 大口径 成套设备 免进海水 海上安装
下载PDF
海上工程钻探的套管安装和维护
20
作者 丁加宏 周永 《石化技术》 CAS 2024年第5期153-155,共3页
在海上工程钻探中,需要掌握系统的钻探技术,其中套管的安装与维护是一个重要的技术环节,对套管的选用、安装、维护、移位进行了仔细的说明,并介绍了一种具有专利的大道这装置,实现通过套管的使用提高孔壁的维护质量,顺利钻达目的层位的... 在海上工程钻探中,需要掌握系统的钻探技术,其中套管的安装与维护是一个重要的技术环节,对套管的选用、安装、维护、移位进行了仔细的说明,并介绍了一种具有专利的大道这装置,实现通过套管的使用提高孔壁的维护质量,顺利钻达目的层位的目标。 展开更多
关键词 海上工程钻探 套管安装 维护
下载PDF
上一页 1 2 17 下一页 到第
使用帮助 返回顶部