This paper constructs a coupled aero-hydro-elastic-servo simulation framework for a monopile offshore wind turbine(OWT).In this framework,a detailed multi-body dynamics model of the monopile OWT including the gearbox,...This paper constructs a coupled aero-hydro-elastic-servo simulation framework for a monopile offshore wind turbine(OWT).In this framework,a detailed multi-body dynamics model of the monopile OWT including the gearbox,blades,tower and other components(nacelle,hub,bedplate,etc.)has been explicitly established.The effects of pile−soil interaction,controller and operational conditions on the turbine dynamic responses are studied systematically in time domain and frequency domain.The results show that(1)a comprehensive drivetrain model has the capability to provide a more precise representation of the complex dynamic characteristics exhibited by drivetrain components,which can be used as the basis for further study on the dynamic characteristics of the drivetrain.(2)The pile−soil interaction can influence the wind turbine dynamic responses,particularly under the parked condition.(3)The effect of the pile−soil interaction on tower responses is more significant than that on blade responses.(4)The use of the controller can substantially affect the rotor characteristics,which in turn influences the turbine dynamic responses.(5)The tower and blade displacements under the operational condition are much larger than those under the parked condition.The model and methodology presented in this study demonstrate potential for examining complex dynamic behaviors of the monopile OWTs.To ensure accuracy and precision,it is imperative to construct a detailed model of the wind turbine system,while also taking into account simulation efficiency.展开更多
By using ABAQUS/Explicit, the dynamic process of an offshore wind turbine(OWT) stricken by a ship of 5000DWT in the front direction is simulated. The OWT is located on a large-scale prestressing bucket foundation cons...By using ABAQUS/Explicit, the dynamic process of an offshore wind turbine(OWT) stricken by a ship of 5000DWT in the front direction is simulated. The OWT is located on a large-scale prestressing bucket foundation constructed by an integrated installation technique. According to the simulation results, under the ship collision, a certain range of plastic zone appears within a local area of arc transition structure of the bucket foundation, and the concrete plastic zone is seriously damaged. As the stress level of OWT tower is relatively low, the OWT tower is less affected. A great inertial force is generated at the top of the OWT tower as the mass of nacelle and blades is up to 400 t. The displacement of the tower is in the opposite direction of the ship collision at the end of 1 s under the action of inertial force. There is only a minor damage in the ship bow. Most of the kinetic energy is transformed into the plastic dissipation and absorbed by the arc transition structure of bucket foundation.展开更多
In this article, the authors give an overview of different logistics concepts for operation and maintenance of OWPP (offshore wind power plants). These can be generally classified into onshore based and offshore bas...In this article, the authors give an overview of different logistics concepts for operation and maintenance of OWPP (offshore wind power plants). These can be generally classified into onshore based and offshore based concepts. The operation of OWPPs can still be improved as research has shown that the availability of OWPPs is low compared to onshore wind power plants. There are a few tools to calculate operating costs and to evaluate the different concepts. However, most tools have a weak focus on logistics although logistics account for a big share of the costs. The tool the authors are introducing in this article focuses on the logistics processes. It is first explained and then tested with an OWPP scenarin展开更多
At present, more and more offshore wind farms have been built anti ntnnerous projects are on the drawing tables. Therefore, the study on the safety of collision between ships and offshore wind turbines (OWT) is of g...At present, more and more offshore wind farms have been built anti ntnnerous projects are on the drawing tables. Therefore, the study on the safety of collision between ships and offshore wind turbines (OWT) is of great practical signifieance. The present study takes the advantage of the famous LS-DYNA explicit code to simulate the dynamic proeess of the collision between a typical 3MW offshore wind turbine model with monopile fi)undation and a simplified 2000t-class ship model. In the simulation, the added mass effect of the ship, contact nonlinearity of collision, material nonlinearity of steel and aluminum foam and adaptive mesh tectmique for large structure deformation have been taken into considera- tion. Proposed is a crashworthy device for OWF of new conceptual steel sphere shell-cireular ring aluminum foam pad, and the good pe.rfurmanee of the device under the conditions of ship-OWT front impact and side impact has been verified from the views of theoretical analysis and numerical results. The new crashworthy device can effectively smooth the contact force and reduce the top structure dynamic response, using its own structure plastic deformation to absorb most of the ship collision enerty. As a result, the main structure of the OWF and the inside key electric control equipments can be saved by scarifying the structural plastic deformation of new sphere crashworthy device. What is more, the sphere configuratiun design of the crashworthy device can effectively guide the ship to run away from the main OWT structure and reduce the damage of the ship and OWT to some degree during side impact.展开更多
Gearbox in offshore wind turbines is a component with the highest failure rates during operation. Analysis of gearbox repair policy that includes economic considerations is important for the effective operation of off...Gearbox in offshore wind turbines is a component with the highest failure rates during operation. Analysis of gearbox repair policy that includes economic considerations is important for the effective operation of offshore wind farms. From their initial perfect working states, gearboxes degrade with time, which leads to decreased working efficiency. Thus, offshore wind turbine gearboxes can be considered to be multi-state systems with the various levels of productivity for different working states. To efficiently compute the time-dependent distribution of this multi-state system and analyze its reliability, application of the nonhomogeneous continuous-time Markov process(NHCTMP) is appropriate for this type of object. To determine the relationship between operation time and maintenance cost, many factors must be taken into account, including maintenance processes and vessel requirements. Finally, an optimal repair policy can be formulated based on this relationship.展开更多
When a maintenance and operations ship is berthing,there is a chance the ship may collide into the wind turbine.When these ships collide into wind turbine structures,this can result in significant changes to the found...When a maintenance and operations ship is berthing,there is a chance the ship may collide into the wind turbine.When these ships collide into wind turbine structures,this can result in significant changes to the foundation and structure of the wind turbine.In this paper,the structural load of a 4 MW offshore wind turbine was analyzed during a collision with an operations and maintenance ship.The variations in the wind speeds on hub height,waves,and the sea currents were measured.The dynamic simulation of the wind turbine was carried out using the test data as the input parameters.As a result,the load condition of the turbine without a collision was obtained.Finally,the measured turbine load was compared with the simulation results.This study shows that the collision of the operation and the maintenance ship increases the bending moments at the tower’s bottom and the blade’s roots.展开更多
Reducing the operation and maintenance (O & M) cost is one of the potential actions that could reduce the cost of energy produced by offshore wind farms. This article attempts to reduce O & M cost by improving...Reducing the operation and maintenance (O & M) cost is one of the potential actions that could reduce the cost of energy produced by offshore wind farms. This article attempts to reduce O & M cost by improving the utilization of the maintenance resources, specifically the efficient scheduling and routing of the maintenance fleet. Scheduling and routing of maintenance fleet is a non-linear optimization problem with high complexity and a number of constraints. A heuristic algorithm, Ant Colony Optimization (ACO), was modified as Multi-ACO to be used to find the optimal scheduling and routing of maintenance fleet. The numerical studies showed that the proposed methodology was effective and robust enough to find the optimal solution even if the number of offshore wind turbine increases. The suggested approaches are helpful to avoid a time-consuming process of manually planning the scheduling and routing with a presumably suboptimal outcome.展开更多
As the increasing number of wind energy is integrated into the national power grid,analyses of wind energy are becoming increasingly more crucial.The interaction between the topography and the northeast(NE)monsoon bri...As the increasing number of wind energy is integrated into the national power grid,analyses of wind energy are becoming increasingly more crucial.The interaction between the topography and the northeast(NE)monsoon brings abundant wind resources to the Taiwan Strait in autumn and winter.The offshore area has stronger and more stable wind resources,so deployment of offshore wind power is also actively being carried out.However,development of offshore wind power systems requires stricter evaluation and decision-making.Therefore,this study implements a multi-site measurement verification to establish the relationship between the wind resources of the nearshore wind turbine system and a potential offshore power site in Chanbin.In the absence of a wind turbine at a specific location,potential of offshore wind energy is analyzed through wind resources.The findings showed that although the distance between these two sites is substantial,the nearshore and offshore areas at Chanbin experience similar wind conditions,and nearshore wind turbine can respond well to changes in wind speed and generate power accordingly.Afterwards,on this basis,the offshore power potential was evaluated and compared with the nearshore wind turbine systems.The results suggested the advantages of offshore wind power.A further analysis of the differences between power generation on a monthly basis was carried out to determine the distribution of wind turbine operation modes and illustrate the influence of the NE monsoon.展开更多
基金supported by the Scientific and Technological Research Program of Chongqing Municipal Education Commission(Grant Nos.KJQN202101133 and KJQN202301105)Scientific Research Foundation of Chongqing University of Technology(Grant No.2020ZDZ023).
文摘This paper constructs a coupled aero-hydro-elastic-servo simulation framework for a monopile offshore wind turbine(OWT).In this framework,a detailed multi-body dynamics model of the monopile OWT including the gearbox,blades,tower and other components(nacelle,hub,bedplate,etc.)has been explicitly established.The effects of pile−soil interaction,controller and operational conditions on the turbine dynamic responses are studied systematically in time domain and frequency domain.The results show that(1)a comprehensive drivetrain model has the capability to provide a more precise representation of the complex dynamic characteristics exhibited by drivetrain components,which can be used as the basis for further study on the dynamic characteristics of the drivetrain.(2)The pile−soil interaction can influence the wind turbine dynamic responses,particularly under the parked condition.(3)The effect of the pile−soil interaction on tower responses is more significant than that on blade responses.(4)The use of the controller can substantially affect the rotor characteristics,which in turn influences the turbine dynamic responses.(5)The tower and blade displacements under the operational condition are much larger than those under the parked condition.The model and methodology presented in this study demonstrate potential for examining complex dynamic behaviors of the monopile OWTs.To ensure accuracy and precision,it is imperative to construct a detailed model of the wind turbine system,while also taking into account simulation efficiency.
基金Supported by the National High Technology Research and Development Program of China("863"Program,No.2012AA051705)National Natural Science Foundation of China(No.51109160)International Science and Technology Cooperation Program of China(2012DFA70490)
文摘By using ABAQUS/Explicit, the dynamic process of an offshore wind turbine(OWT) stricken by a ship of 5000DWT in the front direction is simulated. The OWT is located on a large-scale prestressing bucket foundation constructed by an integrated installation technique. According to the simulation results, under the ship collision, a certain range of plastic zone appears within a local area of arc transition structure of the bucket foundation, and the concrete plastic zone is seriously damaged. As the stress level of OWT tower is relatively low, the OWT tower is less affected. A great inertial force is generated at the top of the OWT tower as the mass of nacelle and blades is up to 400 t. The displacement of the tower is in the opposite direction of the ship collision at the end of 1 s under the action of inertial force. There is only a minor damage in the ship bow. Most of the kinetic energy is transformed into the plastic dissipation and absorbed by the arc transition structure of bucket foundation.
文摘In this article, the authors give an overview of different logistics concepts for operation and maintenance of OWPP (offshore wind power plants). These can be generally classified into onshore based and offshore based concepts. The operation of OWPPs can still be improved as research has shown that the availability of OWPPs is low compared to onshore wind power plants. There are a few tools to calculate operating costs and to evaluate the different concepts. However, most tools have a weak focus on logistics although logistics account for a big share of the costs. The tool the authors are introducing in this article focuses on the logistics processes. It is first explained and then tested with an OWPP scenarin
基金supported by the National Natural Science Foundation of China(Grant No.50538020)the National Science and Technology Planning(Grant No.2006BAJ03B00)
文摘At present, more and more offshore wind farms have been built anti ntnnerous projects are on the drawing tables. Therefore, the study on the safety of collision between ships and offshore wind turbines (OWT) is of great practical signifieance. The present study takes the advantage of the famous LS-DYNA explicit code to simulate the dynamic proeess of the collision between a typical 3MW offshore wind turbine model with monopile fi)undation and a simplified 2000t-class ship model. In the simulation, the added mass effect of the ship, contact nonlinearity of collision, material nonlinearity of steel and aluminum foam and adaptive mesh tectmique for large structure deformation have been taken into considera- tion. Proposed is a crashworthy device for OWF of new conceptual steel sphere shell-cireular ring aluminum foam pad, and the good pe.rfurmanee of the device under the conditions of ship-OWT front impact and side impact has been verified from the views of theoretical analysis and numerical results. The new crashworthy device can effectively smooth the contact force and reduce the top structure dynamic response, using its own structure plastic deformation to absorb most of the ship collision enerty. As a result, the main structure of the OWF and the inside key electric control equipments can be saved by scarifying the structural plastic deformation of new sphere crashworthy device. What is more, the sphere configuratiun design of the crashworthy device can effectively guide the ship to run away from the main OWT structure and reduce the damage of the ship and OWT to some degree during side impact.
文摘Gearbox in offshore wind turbines is a component with the highest failure rates during operation. Analysis of gearbox repair policy that includes economic considerations is important for the effective operation of offshore wind farms. From their initial perfect working states, gearboxes degrade with time, which leads to decreased working efficiency. Thus, offshore wind turbine gearboxes can be considered to be multi-state systems with the various levels of productivity for different working states. To efficiently compute the time-dependent distribution of this multi-state system and analyze its reliability, application of the nonhomogeneous continuous-time Markov process(NHCTMP) is appropriate for this type of object. To determine the relationship between operation time and maintenance cost, many factors must be taken into account, including maintenance processes and vessel requirements. Finally, an optimal repair policy can be formulated based on this relationship.
基金supported by the National Key Research and Development Program of China(2018YFB0904005)。
文摘When a maintenance and operations ship is berthing,there is a chance the ship may collide into the wind turbine.When these ships collide into wind turbine structures,this can result in significant changes to the foundation and structure of the wind turbine.In this paper,the structural load of a 4 MW offshore wind turbine was analyzed during a collision with an operations and maintenance ship.The variations in the wind speeds on hub height,waves,and the sea currents were measured.The dynamic simulation of the wind turbine was carried out using the test data as the input parameters.As a result,the load condition of the turbine without a collision was obtained.Finally,the measured turbine load was compared with the simulation results.This study shows that the collision of the operation and the maintenance ship increases the bending moments at the tower’s bottom and the blade’s roots.
文摘Reducing the operation and maintenance (O & M) cost is one of the potential actions that could reduce the cost of energy produced by offshore wind farms. This article attempts to reduce O & M cost by improving the utilization of the maintenance resources, specifically the efficient scheduling and routing of the maintenance fleet. Scheduling and routing of maintenance fleet is a non-linear optimization problem with high complexity and a number of constraints. A heuristic algorithm, Ant Colony Optimization (ACO), was modified as Multi-ACO to be used to find the optimal scheduling and routing of maintenance fleet. The numerical studies showed that the proposed methodology was effective and robust enough to find the optimal solution even if the number of offshore wind turbine increases. The suggested approaches are helpful to avoid a time-consuming process of manually planning the scheduling and routing with a presumably suboptimal outcome.
基金financially supported in part by the National Science Council,Republic of China,under contract MOST 110-2221-E-006-183-supported by Taipower and RCETS offshore wind power team.
文摘As the increasing number of wind energy is integrated into the national power grid,analyses of wind energy are becoming increasingly more crucial.The interaction between the topography and the northeast(NE)monsoon brings abundant wind resources to the Taiwan Strait in autumn and winter.The offshore area has stronger and more stable wind resources,so deployment of offshore wind power is also actively being carried out.However,development of offshore wind power systems requires stricter evaluation and decision-making.Therefore,this study implements a multi-site measurement verification to establish the relationship between the wind resources of the nearshore wind turbine system and a potential offshore power site in Chanbin.In the absence of a wind turbine at a specific location,potential of offshore wind energy is analyzed through wind resources.The findings showed that although the distance between these two sites is substantial,the nearshore and offshore areas at Chanbin experience similar wind conditions,and nearshore wind turbine can respond well to changes in wind speed and generate power accordingly.Afterwards,on this basis,the offshore power potential was evaluated and compared with the nearshore wind turbine systems.The results suggested the advantages of offshore wind power.A further analysis of the differences between power generation on a monthly basis was carried out to determine the distribution of wind turbine operation modes and illustrate the influence of the NE monsoon.