Since the development of offshore oil and gas, increased submarine oil and gas pipelines were installed. All the early steel pipes of submarine pipelines depended on importing because of the strict requirements of com...Since the development of offshore oil and gas, increased submarine oil and gas pipelines were installed. All the early steel pipes of submarine pipelines depended on importing because of the strict requirements of comprehensive properties, such as, anti-corrosion, resistance to pressure and so on. To research and develop domes- tic steel pipes used for the submarine pipeline, the Longitudinal-seam Submerged Arc Welded (LSAW) pipes were made of steel plates cut from leveled hot rolled coils by both the JCOE and UOE (the forming process in which the plate like the letter “J”, “C”, “0” or “U” shape, then expansion) forming processes. Furthermore, the mechanical properties of the pipe base metal and weld metal were tested, and the results were in accordance with the corresponding pipe specification API SPEC 5L or DNV- OS-FI01, which showed that domestic LSAW pipes could be used for submarine oil and gas pipelines.展开更多
The industrial application of an exterior three-layer anticorrosive polypropylene coating system(3PP)on large-diameter(larger than Φ600 mm)steel pipes was developed using an experimental process simulation study and ...The industrial application of an exterior three-layer anticorrosive polypropylene coating system(3PP)on large-diameter(larger than Φ600 mm)steel pipes was developed using an experimental process simulation study and the optimization of raw materials inspection,steel pipe surface pretreatments,and water cooling control on a coating application process.The coating properties meet ISO standard 21809 on buried or submerged 3PP pipelines used in the petroleum and natural gas industries.Differential scanning calorimetry and X-ray diffraction were used to analyze the crystallinities and grain sizes of polypropylene(PP)top coats with different cooling rates.Increasing the melt cooling rate reduces the crystallinity and grain size of the PP top coat and enhances its strength and toughness.展开更多
In water-lubricated pipeline transportation of heavy oil and bitumen, a thin oil film typically coats the pipe wall. A detailed study of the hydrodynamic effects of this fouling layer is critical to the design and ope...In water-lubricated pipeline transportation of heavy oil and bitumen, a thin oil film typically coats the pipe wall. A detailed study of the hydrodynamic effects of this fouling layer is critical to the design and operation of oil-water pipelines, as it can increase the pipeline pressure loss (and pumping power requirements) by 15 times or more. In this study, a parametric investigation of the hydrodynamic effects caused by the wall coating of viscous oil was conducted. A custom-built rectangular flow cell was used. A validated CFD-based procedure was used to determine the hydrodynamic roughness from the measured pressure losses. A similar procedure was followed for a set of pipe loop tests. The effects of the thickness of the oil coating layer, the oil viscosity, and water flow rate on the hydrodynamic roughness were evaluated. Oil viscosities from 3 to 21300 Pa s were tested. The results show that the equivalent hydrodynamic roughness produced by a wall coating layer of viscous oil is dependent on the coating thickness but essentially independent of oil viscosity. A new correlation was developed using these data to predict the hydrodynamic roughness for flow conditions in which a viscous oil coating is produced on the pipe wall.展开更多
文摘Since the development of offshore oil and gas, increased submarine oil and gas pipelines were installed. All the early steel pipes of submarine pipelines depended on importing because of the strict requirements of comprehensive properties, such as, anti-corrosion, resistance to pressure and so on. To research and develop domes- tic steel pipes used for the submarine pipeline, the Longitudinal-seam Submerged Arc Welded (LSAW) pipes were made of steel plates cut from leveled hot rolled coils by both the JCOE and UOE (the forming process in which the plate like the letter “J”, “C”, “0” or “U” shape, then expansion) forming processes. Furthermore, the mechanical properties of the pipe base metal and weld metal were tested, and the results were in accordance with the corresponding pipe specification API SPEC 5L or DNV- OS-FI01, which showed that domestic LSAW pipes could be used for submarine oil and gas pipelines.
文摘The industrial application of an exterior three-layer anticorrosive polypropylene coating system(3PP)on large-diameter(larger than Φ600 mm)steel pipes was developed using an experimental process simulation study and the optimization of raw materials inspection,steel pipe surface pretreatments,and water cooling control on a coating application process.The coating properties meet ISO standard 21809 on buried or submerged 3PP pipelines used in the petroleum and natural gas industries.Differential scanning calorimetry and X-ray diffraction were used to analyze the crystallinities and grain sizes of polypropylene(PP)top coats with different cooling rates.Increasing the melt cooling rate reduces the crystallinity and grain size of the PP top coat and enhances its strength and toughness.
基金support of the NSERC Industrial Research Chair in Pipeline Transport Processes (held by RS Sanders)Canada’s Natural Sciences and Engineering Research Council (NSERC)the Industrial Sponsors (Canadian Natural Resources Limited, Fort Hills LLP, Nexen Inc., Saskatchewan Research Council Pipe Flow Technology CentreTM, Shell Canada Energy, Syncrude Canada Ltd., Total E&P Canada Ltd., Teck Resources Ltd. and Paterson & Cooke Consulting Engineers Ltd.)
文摘In water-lubricated pipeline transportation of heavy oil and bitumen, a thin oil film typically coats the pipe wall. A detailed study of the hydrodynamic effects of this fouling layer is critical to the design and operation of oil-water pipelines, as it can increase the pipeline pressure loss (and pumping power requirements) by 15 times or more. In this study, a parametric investigation of the hydrodynamic effects caused by the wall coating of viscous oil was conducted. A custom-built rectangular flow cell was used. A validated CFD-based procedure was used to determine the hydrodynamic roughness from the measured pressure losses. A similar procedure was followed for a set of pipe loop tests. The effects of the thickness of the oil coating layer, the oil viscosity, and water flow rate on the hydrodynamic roughness were evaluated. Oil viscosities from 3 to 21300 Pa s were tested. The results show that the equivalent hydrodynamic roughness produced by a wall coating layer of viscous oil is dependent on the coating thickness but essentially independent of oil viscosity. A new correlation was developed using these data to predict the hydrodynamic roughness for flow conditions in which a viscous oil coating is produced on the pipe wall.