The main technical requirement of the turbine generating units for the Three Gorges Project (TGP) has a basic conclusion through a long term study and research as well as demonstration.Along with the TGP construction ...The main technical requirement of the turbine generating units for the Three Gorges Project (TGP) has a basic conclusion through a long term study and research as well as demonstration.Along with the TGP construction and successful execution of the contract of turbine generating units,the technical difficulties concerning the performance and structure of turbine generating units have been further recognized.In this paper some issues are discussed and analyzed in connection with a deep going cognition of turbine generating units for TGP during the period of design, manufacture and installation.展开更多
Improving the primary steam parameters is one of the most direct ways to improve the cycle efficiency of a powergeneration system. In the present study, the typical problem connected to the excessively high superheat ...Improving the primary steam parameters is one of the most direct ways to improve the cycle efficiency of a powergeneration system. In the present study, the typical problem connected to the excessively high superheat degree ofextraction steam in an ultra-supercritical (USC) double-reheat unit is considered. Using a 1000 MW power plantas an example, two systems (case 1 and case 2) are proposed, both working in combination with a regenerativesteam turbine. The thermal performances of these two systems are compared with that of the original systemthrough a heat balance method and an exergy balance strategy. The results reveal that the two coupled systemscan significantly reduce the superheat degree of extraction steam, turbine heat rate, and coal consumption of theunit and improve the energy utilization efficiency. These results will provide useful theoretical guidance to futureinvestigators wishing to address the general problem relating to energy conservation and modelling of the coupledextraction steam regenerative system of USC double-reheat units.展开更多
ZJZ-2 system has the following functions: (1) Real-time on-line sampling and FFT analysis (32 channel); (2) Data aquisition, analysis and storage during start-up and shut-down; (3) Alarming, emergency recognition and ...ZJZ-2 system has the following functions: (1) Real-time on-line sampling and FFT analysis (32 channel); (2) Data aquisition, analysis and storage during start-up and shut-down; (3) Alarming, emergency recognition and fault retrieval; (4) Data aquisition, analysis and storage during daily operation; (5) Recall of historic data; (6) Output of routine reports and tables; (7) Analysis of vibration behaviour: Bode plot, polar plot, spectrum, cascade, waveform, shaft orbit, trend, etc;展开更多
The main technical problems that should be considered in the design of hydro-turbine generating units of Three Gorges Project (TGP) are analyzed;the key technical researches performed are summarized,and the parameters...The main technical problems that should be considered in the design of hydro-turbine generating units of Three Gorges Project (TGP) are analyzed;the key technical researches performed are summarized,and the parameters of hydro-turbine generating units are optimized through the study on key technical problems.The unit operation indicates that the performance of the hydro-turbine generating units is excellent,and the units can operate in a safe,stable and highly efficient mode for a long term.Therefore,it is verified effectively that the general technical design of units is scientific and rational.展开更多
Coordinated controller tuning of the boiler turbine unit is a challenging task due to the nonlinear and coupling characteristics of the system.In this paper,a new variant of binary particle swarm optimization (PSO) ...Coordinated controller tuning of the boiler turbine unit is a challenging task due to the nonlinear and coupling characteristics of the system.In this paper,a new variant of binary particle swarm optimization (PSO) algorithm,called probability based binary PSO (PBPSO),is presented to tune the parameters of a coordinated controller.The simulation results show that PBPSO can effectively optimize the control parameters and achieves better control performance than those based on standard discrete binary PSO,modified binary PSO,and standard continuous PSO.展开更多
The capability to perform fast load-following has been an important issue in the power industry. An output tracking control system of a boiler-turbine unit is developed. The system is composed of stable inversion and ...The capability to perform fast load-following has been an important issue in the power industry. An output tracking control system of a boiler-turbine unit is developed. The system is composed of stable inversion and feedback controller. The stable inversion is implemented as a feedforward controller to improve the load-following capability, and the feedback controller is utilized to guarantee the stability and robustness of the whole system. Loop-shaping H∞ method is used to design the feedback controller and the final controller is reduced to a multivariable PI form. The output tracking control system takes account of the multivariable, nonlinear and coupling behavior of boiler-turbine system, and the simulation tests show that the control system works well and can be widely applied.展开更多
Based on the research on domestic and international automatic technical development in fossil power plant,the paper analyses the recent situation of the coordinate control system between turbine and boiler of domestic...Based on the research on domestic and international automatic technical development in fossil power plant,the paper analyses the recent situation of the coordinate control system between turbine and boiler of domestic fossil Power Plant,provides the development thought of coordinate control system between turbine and boiler,and describes the application prospect in control system of fossil power plant combining with the application experience.展开更多
This paper is concerned with the development of electronic controller for turbine POwer units. In order to increase the reliability of the POwer unit, three control loops working in the hi-backup mode have been employ...This paper is concerned with the development of electronic controller for turbine POwer units. In order to increase the reliability of the POwer unit, three control loops working in the hi-backup mode have been employed. This control strategy is able to satisfy the demands of the application of the power unit to the aviation fields.展开更多
The design of a feasible Combined Heat and Power plant for a small community is presented. Of the many alternatives solid-waste disposal methods available, incineration of solid waste is recommended due to its potenti...The design of a feasible Combined Heat and Power plant for a small community is presented. Of the many alternatives solid-waste disposal methods available, incineration of solid waste is recommended due to its potential energy recovery of the heat released during solid waste incineration and recovery of valuable by-products that can either be reused, re- cycled or marketed, among other advantages. Hence, an attempt is made to use the heat energy released during incin- eration of solid waste to produce steam in a boiler, which in turn powers a turbine for eventual generation of electricity. The two processes involved in the generation of electricity for in-plant use or for a small community via a steam turbine-generator combination and a gas compressor-gas turbine-generator are presented. The analysis of the amount of energy produced from the solid waste energy-conversion system using an incinerator-boiler-steam turbine-electric generator combination with a capacity of 4.5 tons/day is also presented. The net electric power for a small community was found to be 148.24 kW with an overall efficiency of about 21% having taken cognisance of the process power needs and unaccounted process heat losses. Moreover, exergy analysis of the proposed CHP plant was carried out whereby the respective energy and exergy efficiencies of 83.2% and 62.1% were obtained.展开更多
The sugar cane containing minimum 30% fiber was referred as bagasse and used the generation of power required for the operation of sugar mill. The bagasse is fired in the boiler for producing steam at high pressure, w...The sugar cane containing minimum 30% fiber was referred as bagasse and used the generation of power required for the operation of sugar mill. The bagasse is fired in the boiler for producing steam at high pressure, which is extracted through various single high capacity turbines and used in the process. The installation of high pressure boilers and high pressure turbo-generators has provision for the operation of co-generation plant during the off-season also that enhances the power generation from 9MW to 23MW. The annual monetary benefits achieved are Rs. 204.13 million and this was based on cost of power sold to the grid @ Rs 2.548 per unit, sugar season of 219 days and off season of 52 days. This required an investment of Rs 820.6 million. The investment had an attractive simple payback period of 48 months.展开更多
In this paper, a multiple population genetic algorithm (MPGA) is proposed to solve the problem of optimal load dispatch of gas turbine generation units. By introducing multiple populations on the basis of Standard Gen...In this paper, a multiple population genetic algorithm (MPGA) is proposed to solve the problem of optimal load dispatch of gas turbine generation units. By introducing multiple populations on the basis of Standard Genetic Algorithm (SGA), connecting each population through immigrant operator and preserving the best individuals of every generation through elite strategy, MPGA can enhance the efficiency in obtaining the global optimal solution. In this paper, MPGA is applied to optimize the load dispatch of 3×390MW gas turbine units. The results of MPGA calculation are compared with that of equal micro incremental method and AGC instruction. MPGA shows the best performance of optimization under different load conditions. The amount of saved gas consumption in the calculation is up to 2337.45m3N/h, which indicates that the load dispatch optimization of gas turbine units via MPGA approach can be effective.展开更多
文摘The main technical requirement of the turbine generating units for the Three Gorges Project (TGP) has a basic conclusion through a long term study and research as well as demonstration.Along with the TGP construction and successful execution of the contract of turbine generating units,the technical difficulties concerning the performance and structure of turbine generating units have been further recognized.In this paper some issues are discussed and analyzed in connection with a deep going cognition of turbine generating units for TGP during the period of design, manufacture and installation.
基金the Shandong Electric Power Engineering Consulting Institute science and technology project(Grant No.37-K2014-33).
文摘Improving the primary steam parameters is one of the most direct ways to improve the cycle efficiency of a powergeneration system. In the present study, the typical problem connected to the excessively high superheat degree ofextraction steam in an ultra-supercritical (USC) double-reheat unit is considered. Using a 1000 MW power plantas an example, two systems (case 1 and case 2) are proposed, both working in combination with a regenerativesteam turbine. The thermal performances of these two systems are compared with that of the original systemthrough a heat balance method and an exergy balance strategy. The results reveal that the two coupled systemscan significantly reduce the superheat degree of extraction steam, turbine heat rate, and coal consumption of theunit and improve the energy utilization efficiency. These results will provide useful theoretical guidance to futureinvestigators wishing to address the general problem relating to energy conservation and modelling of the coupledextraction steam regenerative system of USC double-reheat units.
文摘ZJZ-2 system has the following functions: (1) Real-time on-line sampling and FFT analysis (32 channel); (2) Data aquisition, analysis and storage during start-up and shut-down; (3) Alarming, emergency recognition and fault retrieval; (4) Data aquisition, analysis and storage during daily operation; (5) Recall of historic data; (6) Output of routine reports and tables; (7) Analysis of vibration behaviour: Bode plot, polar plot, spectrum, cascade, waveform, shaft orbit, trend, etc;
文摘The main technical problems that should be considered in the design of hydro-turbine generating units of Three Gorges Project (TGP) are analyzed;the key technical researches performed are summarized,and the parameters of hydro-turbine generating units are optimized through the study on key technical problems.The unit operation indicates that the performance of the hydro-turbine generating units is excellent,and the units can operate in a safe,stable and highly efficient mode for a long term.Therefore,it is verified effectively that the general technical design of units is scientific and rational.
基金supported by Projects of Shanghai Science and Technology Community (No. 10ZR1411800,No. 08160705900,No. 08160512100)Shanghai University "the 11th Five-Year Plan"+1 种基金211 Construction ProjectMechatronics Engineering Innovation Group Project from Shanghai Education Commission
文摘Coordinated controller tuning of the boiler turbine unit is a challenging task due to the nonlinear and coupling characteristics of the system.In this paper,a new variant of binary particle swarm optimization (PSO) algorithm,called probability based binary PSO (PBPSO),is presented to tune the parameters of a coordinated controller.The simulation results show that PBPSO can effectively optimize the control parameters and achieves better control performance than those based on standard discrete binary PSO,modified binary PSO,and standard continuous PSO.
文摘The capability to perform fast load-following has been an important issue in the power industry. An output tracking control system of a boiler-turbine unit is developed. The system is composed of stable inversion and feedback controller. The stable inversion is implemented as a feedforward controller to improve the load-following capability, and the feedback controller is utilized to guarantee the stability and robustness of the whole system. Loop-shaping H∞ method is used to design the feedback controller and the final controller is reduced to a multivariable PI form. The output tracking control system takes account of the multivariable, nonlinear and coupling behavior of boiler-turbine system, and the simulation tests show that the control system works well and can be widely applied.
文摘Based on the research on domestic and international automatic technical development in fossil power plant,the paper analyses the recent situation of the coordinate control system between turbine and boiler of domestic fossil Power Plant,provides the development thought of coordinate control system between turbine and boiler,and describes the application prospect in control system of fossil power plant combining with the application experience.
文摘This paper is concerned with the development of electronic controller for turbine POwer units. In order to increase the reliability of the POwer unit, three control loops working in the hi-backup mode have been employed. This control strategy is able to satisfy the demands of the application of the power unit to the aviation fields.
文摘The design of a feasible Combined Heat and Power plant for a small community is presented. Of the many alternatives solid-waste disposal methods available, incineration of solid waste is recommended due to its potential energy recovery of the heat released during solid waste incineration and recovery of valuable by-products that can either be reused, re- cycled or marketed, among other advantages. Hence, an attempt is made to use the heat energy released during incin- eration of solid waste to produce steam in a boiler, which in turn powers a turbine for eventual generation of electricity. The two processes involved in the generation of electricity for in-plant use or for a small community via a steam turbine-generator combination and a gas compressor-gas turbine-generator are presented. The analysis of the amount of energy produced from the solid waste energy-conversion system using an incinerator-boiler-steam turbine-electric generator combination with a capacity of 4.5 tons/day is also presented. The net electric power for a small community was found to be 148.24 kW with an overall efficiency of about 21% having taken cognisance of the process power needs and unaccounted process heat losses. Moreover, exergy analysis of the proposed CHP plant was carried out whereby the respective energy and exergy efficiencies of 83.2% and 62.1% were obtained.
文摘The sugar cane containing minimum 30% fiber was referred as bagasse and used the generation of power required for the operation of sugar mill. The bagasse is fired in the boiler for producing steam at high pressure, which is extracted through various single high capacity turbines and used in the process. The installation of high pressure boilers and high pressure turbo-generators has provision for the operation of co-generation plant during the off-season also that enhances the power generation from 9MW to 23MW. The annual monetary benefits achieved are Rs. 204.13 million and this was based on cost of power sold to the grid @ Rs 2.548 per unit, sugar season of 219 days and off season of 52 days. This required an investment of Rs 820.6 million. The investment had an attractive simple payback period of 48 months.
文摘In this paper, a multiple population genetic algorithm (MPGA) is proposed to solve the problem of optimal load dispatch of gas turbine generation units. By introducing multiple populations on the basis of Standard Genetic Algorithm (SGA), connecting each population through immigrant operator and preserving the best individuals of every generation through elite strategy, MPGA can enhance the efficiency in obtaining the global optimal solution. In this paper, MPGA is applied to optimize the load dispatch of 3×390MW gas turbine units. The results of MPGA calculation are compared with that of equal micro incremental method and AGC instruction. MPGA shows the best performance of optimization under different load conditions. The amount of saved gas consumption in the calculation is up to 2337.45m3N/h, which indicates that the load dispatch optimization of gas turbine units via MPGA approach can be effective.