Based on the tensor analysis of water-sediment two-phase how, the basic model equations for clear water flow and sediment-laden flow are deduced in the general curve coordinates for natural water variable-density turb...Based on the tensor analysis of water-sediment two-phase how, the basic model equations for clear water flow and sediment-laden flow are deduced in the general curve coordinates for natural water variable-density turbulent how. Furthermore, corresponding boundary conditions are also presented in connection with the composition and movement of non-uniform bed material. The theoretical results are applied to the calculation of the float open caisson in the construction period and good results are obtained.展开更多
Based on the combined hydraulic calculation for the eastern network region at the Pearl River estuary and several outlets to the Lingdingyang Bay, the sediment calculation modelling was introduced in the establishment...Based on the combined hydraulic calculation for the eastern network region at the Pearl River estuary and several outlets to the Lingdingyang Bay, the sediment calculation modelling was introduced in the establishment of the sediment mathematical model for Lingdingyang Bay and the eastern region with one and two dimensional flow calculation. Model adjustment and verification were performed in conjunction with field data. The simulated results coincide well with measured data.In addition the model is applied to predict the shore-line planning scheme of Lingdingyang Bay.The theoretical criterion is provided for the shore line plan in the model.And a new mathematical simulated method is put out to research the planning engineering concerned with one-dimensional net rivers and two-dimensional estuary.展开更多
文摘Based on the tensor analysis of water-sediment two-phase how, the basic model equations for clear water flow and sediment-laden flow are deduced in the general curve coordinates for natural water variable-density turbulent how. Furthermore, corresponding boundary conditions are also presented in connection with the composition and movement of non-uniform bed material. The theoretical results are applied to the calculation of the float open caisson in the construction period and good results are obtained.
文摘Based on the combined hydraulic calculation for the eastern network region at the Pearl River estuary and several outlets to the Lingdingyang Bay, the sediment calculation modelling was introduced in the establishment of the sediment mathematical model for Lingdingyang Bay and the eastern region with one and two dimensional flow calculation. Model adjustment and verification were performed in conjunction with field data. The simulated results coincide well with measured data.In addition the model is applied to predict the shore-line planning scheme of Lingdingyang Bay.The theoretical criterion is provided for the shore line plan in the model.And a new mathematical simulated method is put out to research the planning engineering concerned with one-dimensional net rivers and two-dimensional estuary.