Mining globally contributes to the growth of many economies of the world. Since its inception, the Zambian mining industry has contributed largely to the country’s economy. The various developments both in technology...Mining globally contributes to the growth of many economies of the world. Since its inception, the Zambian mining industry has contributed largely to the country’s economy. The various developments both in technology and knowledge have contributed to the scale at which mining is being done. Challenges in such a setting arise due to the socio-economic and environmental impacts of mining, which create multidimensional problems. The study investigated the importance of engaging stakeholders in progressive rehabilitation programs for large-scale open pit mines, using a case study of the Lumwana Mine and its host community, Manyama. A qualitative approach was used, and data was collected through one-on-one interviews. A combination of convenient and quota sampling was used to engage with host community leaders, professionals and academicians from various fields and institutions. Results showed that most participants had agreed that stakeholder engagement is important for progressive rehabilitation, but the challenge was that the host community and municipal council representatives were not aware of any progressive rehabilitation efforts at Lumwana Mine. This was attributed to a lack of stakeholder engagement and communication of mitigation progress activities by the Lumwana Mine. Results also revealed that the lack of environmental impact assessment regulations to compel companies to involve stakeholders throughout the entire life of the mine other than just at the pre-mining stage led to a lack of compliance and accountability in rehabilitation.展开更多
In open pit mining,uncontrolled block instabilities have serious social,economic and regulatory consequences,such as casualties,disruption of operation and increased regulation difficulties.For this reason,bench face ...In open pit mining,uncontrolled block instabilities have serious social,economic and regulatory consequences,such as casualties,disruption of operation and increased regulation difficulties.For this reason,bench face angle,as one of the controlling parameters associated with block instabilities,should be carefully designed for sustainable mining.This study introduces a discrete fracture network(DFN)-based probabilistic block theory approach for the fast design of the bench face angle.A major advantage is the explicit incorporation of discontinuity size and spatial distribution in the procedure of key blocks testing.The proposed approach was applied to a granite mine in China.First,DFN models were generated from a multi-step modeling procedure to simulate the complex structural characteristics of pit slopes.Then,a modified key blocks searching method was applied to the slope faces modeled,and a cumulative probability of failure was obtained for each sector.Finally,a bench face angle was determined commensurate with an acceptable risk level of stability.The simulation results have shown that the number of hazardous traces exposed on the slope face can be significantly reduced when the suggested bench face angle is adopted,indicating an extremely low risk of uncontrolled block instabilities.展开更多
A type of velocity sensor CD 1, an auto recording instrument on blasting vibration YBJ 1 and a random signal and vibration analysis system (CRAS) were used to monitor the particle vibration induced by blasting at open...A type of velocity sensor CD 1, an auto recording instrument on blasting vibration YBJ 1 and a random signal and vibration analysis system (CRAS) were used to monitor the particle vibration induced by blasting at open pit slope in Hainan Iron Mine. The attenuating rules of blasting ground vibration on slope were developed. By means of the analysis and calculation of the blasting vibration data at open pit slope and the vertical particle vibration velocity assessment method based on the concept of vibration strength, the empirical attenuating equations which can be used for predicting and estimating the damage of slope were derived.展开更多
Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining tech...Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining technology for residual coal of end slopes.In the proposal a conveyance road and ventilation conveyance near the slope are built,corresponding to the pit mining area and the surface coal mine dump,as well as an interval haulage tunnel and air-inlet tunnel.The outcome shows that such mining method may reduce the effect to slope stability from underground mining,it does not affect the dumping advance and has a high recovery rate of residual coal resources.The working face is timbered by single hydraulic props,transported by a scraper conveyor and supported by coal walls.This method of mining is one of layered top coal caving,with high resource recovery,low production cost where positive economic benefit can be realized.展开更多
Combining the GIS (geographic information systems) grid-based data with four proposed column-based 3D slope stability analysis models, a comprehensive solution of a high-steep open-pit slope has been obtained. For s...Combining the GIS (geographic information systems) grid-based data with four proposed column-based 3D slope stability analysis models, a comprehensive solution of a high-steep open-pit slope has been obtained. For six searching ranges, 19 critical slip surfaces of different sizes have been studied, in which the minimum 3D safety factor is 1.33. Comparison of 3D safety factors of designed and proposed slope plans shows for all the critical slip surfaces for the proposed plan, the smallest 3D safety factor is 1.33 under the most unfavorable condition. This means that the proposed plan of the high slopes, about 600 m, of an open pit (2-5° steeper than designed plan) is feasible.展开更多
The measured data of vibrations induced by excavation of deep-buried cavern and open pit with method of bench blasting were analyzed by Fourier Transform and Wavelet Transform,and the characteristics of vibrations ind...The measured data of vibrations induced by excavation of deep-buried cavern and open pit with method of bench blasting were analyzed by Fourier Transform and Wavelet Transform,and the characteristics of vibrations induced under these two circumstances were studied.It is concluded that with the similar rock condition and drilling-blasting parameters,vibration induced by bench blasting in deep-buried cavern has a higher main frequency and more scattered energy distribution than that in open pit.The vibration induced by bench blasting in open pit is mainly originated from the blast load,while the vibration induced by bench blasting in deep-buried cavern is the superposition of vibrations induced by blast load and transient release of in-situ stress.The vibration induced by transient release of in-situ stress increases with the stress level.展开更多
The design and practice in supporting the cut slope of an open-pit mine wereintroduced, in which the high pressure grouting method was used in reinforcing the weak formation inthe slopes. Based on a detailed geologica...The design and practice in supporting the cut slope of an open-pit mine wereintroduced, in which the high pressure grouting method was used in reinforcing the weak formation inthe slopes. Based on a detailed geological survey of the slope, a theoretical analysis was carriedout, and the design parameters were proposed, where the Tresca or Mohr-Coulomb yield criteria wasemployed. A patent technology, named 'Technology of high pressure and multiple grouting in differentlevels within a single hole', was employed in the construction. Anchor bars were also installed asgrouting proceeds. This method combines anchoring and grouting comprehensively and was foundsuccessful in practice.展开更多
In order to increase production efficiency at open-pit mines, on the basis oflinear programming, a practical mathematical model for optimizing truck flow was developed, whichimproved the traditional fixed manual sched...In order to increase production efficiency at open-pit mines, on the basis oflinear programming, a practical mathematical model for optimizing truck flow was developed, whichimproved the traditional fixed manual schedule method. The model has advantages from linearprogramming and objective programming, makes most handling points working at full capacity and keepsan optimized ratio between trucks and excavators. For ensuring feasibility of the model inpractical production, four standards for feasibility test were proposed. The model satisfied all thestandards. The application in a large scale open-pit iron mine indicated that the model reduced thenumber of required trucks by 10 percent compared with the fixed manual schedule method.展开更多
The geological structure of the Changshanhao open-pit mine in Urad Middle Banner,Inner Mongolia,China is extremely complicated,and slope instability has frequently occurred in various forms,such as wedge sliding,beddi...The geological structure of the Changshanhao open-pit mine in Urad Middle Banner,Inner Mongolia,China is extremely complicated,and slope instability has frequently occurred in various forms,such as wedge sliding,bedding sliding,and toppling failure.In order to study the failure mechanisms of these slopes,the geological structure and mechanical rock properties were investigated based on field investigations and laboratory tests.Numerical models for the present mining area and final mining area of the original scheme were established to analyze slope stability.The results showed that the unique geomorphological characteristics of the mining area were generated by geological tectonism,and the north side of the stope is an anti-dip layered rock slope and the south side is a dip layered rock slope.Slope failure is the consequence of endogenic and exogenic integration,including physical and mechanical properties of the rock mass,geological structures such as faults and joints,and human-caused factors such as blasting and excavation disturbances.Then the original excavation scheme was redesigned mainly by optimizing the slope angle and decreasing the final mining depth to maintain slope stability.Finally,the Monte Carlo method was used to analyze the reliability of the slope angle optimization scheme.The open-pit mine excavation plan that meets the stability requirements was obtained eventually.展开更多
To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of th...To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of the 34,600 profile are obtained on the basis of hydrology, geology, and monitoring data.The residual thrust method is utilized to calculate the stability coefficients, which are 1.225 and 1.00 under sound and transfixion conditions, respectively. According to the rock damage and fragmentation and the principle of mechanical parameter degradation, the mechanical models of the slide mass development of the hard and soft rock slopes are established. An integrated model for calculating the slope stability coefficient is built considering water, vibration, and other external factors that pertain to the structural plane damage mechanism and the generating mechanism of the sliding mass. The change curve of the stability coefficient in the slide mass development is obtained from the relevant analyses,and afterwards, the stability control measures are proposed. The analysis results indicate that in the cracking stage of the hard rock, the slope stability coefficient decreases linearly with the increase in the length Lbof the hard rock crack zone. The linear slope is positively correlated to rock cohesion c. In the transfixion stage of the soft rock, the decrease speed of the stability coefficient is positively correlated to the residual strength of the soft rock. When the slope is stable, the stability coefficient is in a quadratic-linear relationship with the decreased height Dh of the side slope and in a linear relationship with anchoring force P.展开更多
Timely and proper backfilling of open-pits in strip coal-mines has been an effective measurement for the recovery of the hydrothermal regimes and ecological environment in permafrost regions. In this study, numerical ...Timely and proper backfilling of open-pits in strip coal-mines has been an effective measurement for the recovery of the hydrothermal regimes and ecological environment in permafrost regions. In this study, numerical simulations and statistical regressions were applied for analyzing the recovery processes of the backfill and its major influencing factors for the thermal equilibrium in recently backfilled open pits at the Gulian strip coalmine in Mo'he, Northeast China. Results show that the thermal recovery time of backfilled areas is positively correlated to the backfill depth(BD) of the soils, the backfilled soil temperature(BST), and the mean annual ground surface temperature(MAGST); meanwhile, climate warming can impact on thermal regimes of the backfill area. The impact of climate warming on ground temperature of the backfill will show up significantly in about 50 years afterbackfilling(BD at 10.0 and 20.0 m, BST at 20.0°C) under the climate warming scenario(CWS) of 0.025°C·year ^(-1). Grey-relation analyses show that the sensitivity of the backfill recovery time declines in the order of the BD, BST and MAGST. On the basis of the abovementioned studies, the layer-by-layer backfilling in cold seasons is advised for more effective and more rapid recovery of thermal regimes of the backfilled open-pits in cold regions.展开更多
Based on the externality theory and the environmental value theory, the hypothesis of charging for waste dumping of open-pit metal mines was put forth. The charging methods were designed according to the characteristi...Based on the externality theory and the environmental value theory, the hypothesis of charging for waste dumping of open-pit metal mines was put forth. The charging methods were designed according to the characteristics of waste dumping of openpit metal mines, including charging based on the dumping amount of the total waste, multi-charging factors, exceeding standard punishment charging, and so on. The main charging parameter is based on the dumping area rather than the total amount of waste dumping. The charging model of waste dumping of open-pit mines was formulated, and the charging rate was divided into two parts, i.e., the standard charging rate and the differential charging rate. The standard charging rate was derived using the equilibrium dynamic model, whereas the differential one was obtained by establishing the fuzzy synthesized evaluation model.展开更多
Constrained long-term production scheduling problem(CLTPSP) of open pit mines has been extensively studied in the past few decades due to its wide application in mining projects and the computational challenges it pos...Constrained long-term production scheduling problem(CLTPSP) of open pit mines has been extensively studied in the past few decades due to its wide application in mining projects and the computational challenges it poses become an NP-hard problem.This problem has major practical significance because the effectiveness of the schedules obtained has strong economical impact for any mining project.Despite of the rapid theoretical and technical advances in this field,heuristics is still the only viable approach for large scale industrial applications.This work presents an approach combining genetic algorithms(GAs) and Lagrangian relaxation(LR) to optimally determine the CLTPSP of open pit mines.GAs are stochastic,parallel search algorithms based on the natural selection and the process of evolution.LR method is known for handling large-scale separable problems; however,the convergence to the optimal solution can be slow.The proposed Lagrangian relaxation and genetic algorithms(LR-GAs) combines genetic algorithms into Lagrangian relaxation method to update the Lagrangian multipliers.This approach leads to improve the performance of Lagrangian relaxation method in solving CLTPSP.Numerical results demonstrate that the LR method using GAs to improve its performance speeding up the convergence.Subsequently,highly near-optimal solution to the CLTPSP can be achieved by the LR-GAs.展开更多
To trace the potential hazards of open-pit slope in Longshou mine,global positioning system(GPS) is applied to monitoring ground movement and deformation induced by transition from open-pit to underground mining.Thr...To trace the potential hazards of open-pit slope in Longshou mine,global positioning system(GPS) is applied to monitoring ground movement and deformation induced by transition from open-pit to underground mining.Through long-term monitoring from 2003 to 2008,huge amounts of data were acquired.Monitoring results show that large-scale ground movement and deformation have occurred in mining area,and the movement area is ellipse-shaped.The displacement boundary of settlement trough is 2.0 km long along the exploratory line,and 1.5 km long along the strike of ore body.GPS monitoring results basically agree with the practical deformation state of open-pit slope.It is indicated that the long-term GPS monitoring is an effective way to understand the mechanism of ground movement and deformation in mine area. 更多展开更多
This paper primarily concerns the effective coordination of the procedures and methods employed in open pit mining operations under the background of river management.The central objective of this study is to identify...This paper primarily concerns the effective coordination of the procedures and methods employed in open pit mining operations under the background of river management.The central objective of this study is to identify a viable approach for ensuring rational and efficient development of open pit mineral resources while simultaneously protecting and restoring the ecological environment of the river.This approach should facilitate the realization of a harmonious symbiosis between mining and river management.The intricate mutual influence relationship between river management and open pit mining is first analyzed in depth,which provides a solid foundation for the subsequent coordination strategy development.In light of the aforementioned considerations,a set of coordination procedures for open pit mining based on river management conditions is proposed.These procedures emphasize the integration of river protection into the overall layout of mining at the planning stage.The implementation of scientific mining schemes,accompanied by rigorous control of the scope and depth of mining operations,has proven to be an effective means of reducing the impact of mining activities on river environments.This approach has also facilitated the achievement of a balance and coordination between mining and river management.展开更多
Leaving ditches between adjacent mining areas can effectively reduce re-stripping in the latter mining area and simultaneously lead to an increment in internal dumping costs in the former mining area. This paper estab...Leaving ditches between adjacent mining areas can effectively reduce re-stripping in the latter mining area and simultaneously lead to an increment in internal dumping costs in the former mining area. This paper establishes calculation models for these two marginal costs. The optimizing model for slope cover height can be determined by including marginal cost models in the objective function. The paper has two main contributions:(a) it fully considers redistribution of dumping space in the model;(b) it introduces price fluctuations and cash discounts in the model. We use the typical open-pit mine as an example to test and prove the model. We conclude that a completely covered slope is reasonable in Haerwusu open pit mine; in addition to an increasing price index, the slope cover height can be reduced; and that price changes are one of the most important influencing factors of slope cover height optimization in an open-pit mine.展开更多
Rock slope hazard assessment is an important part of risk analysis for open pit mines.The main parameters that can lead to rock slope failures are the parameters traditionally used in geomechanical classifications,the...Rock slope hazard assessment is an important part of risk analysis for open pit mines.The main parameters that can lead to rock slope failures are the parameters traditionally used in geomechanical classifications,the slope geometrical parameters and external factors like rainfall and blasting.This paper presents a methodology for a hazard assessment system for open pit mine slopes based on 88 cases collated around the world using principal components analysis,discriminant analysis and confidence ellipses.The historical cases used in this study included copper,gold,iron,diamond,lead and zinc,platinum and claystone mines.The variables used in the assessment methodology are uniaxial compressive strength of intact rock;spacing,persistence,opening,roughness,infilling and orientation of the main discontinuity set;weathering of the rock mass;groundwater;blasting method;and height and inclination of the pit.While principal component analysis was used to quantify the data,the discriminant analysis was used to establish a rule to classify new slopes about its stability condition.To provide a practical hazard assessment system,confidence ellipses were used to propose a hazard graph and generate the HAS-Q.The discriminant rule developed in this research has a high discrimination capacity with an error rate of 11.36%.展开更多
Under circumstances in which both underground mining and open-pit mining are employed, the mining effects of two approaches will be superposed and the mining slope will receive several induced stress fields, which mak...Under circumstances in which both underground mining and open-pit mining are employed, the mining effects of two approaches will be superposed and the mining slope will receive several induced stress fields, which makes the sliding mechanism and deformation law of slope rock mass more complicated. This paper, targeting at the east slope of Antaibao Mine with the joint employment of underground mining and open-pit mining, aims to study the moving law of the slope rock mass and the damage mechanism to the overburden of the goaf by numerical simulation. It is supposed that models of possible damage to the slope could be explored for guidance to safety-production of the mine.展开更多
The extraction and movement of rock during mining operations is considered a possible trigger for slip along the fault.In this study,possible anthropogenic causes were analyzed for triggering the earthquake with the l...The extraction and movement of rock during mining operations is considered a possible trigger for slip along the fault.In this study,possible anthropogenic causes were analyzed for triggering the earthquake with the local magnitude ofML=6.1(at a depth of 4km just beneath the quarry),in the vicinity of the large coal open-pit mine in Russia.This event was the largest earthquake associated with a quarry(an open pit).A sufficiently deep occurrence of the source testified that seismic vibrations were produced in a dynamic slip along a preexisting and prestressed tectonic fault.Analytical calculations were conducted of increments of normal and shear stresses at fault planes with several dip angles at depths corresponding to the probable location of the hypocenter of the Bachat earthquake.As the results show,long-term rock excavations bring a prestressed thrust fault closer to the ultimate Coulomb strength,and stress variations at those depths may suffice to initiate a movement along the fault.By measuring seismic vibrations at different quarries and mines in Russia,the dynamic effect at the supposed depth of the source occurrence could be reliably estimated.As is shown,the ultimate anticipated dynamic deformations are noticeably lower than corresponding values produced by seismic waves of distant earthquakes in the case when the effects of dynamic triggering were observed.Accordingly,the seismic effect of explosions cannot trigger a large earthquake with deep source occurrence.Operations in open-pit mines can only bring forward the moment of an earthquake at a potentially seismogenic fault.At the same time,the numerical calculations reveal that a branching network of underground tunnels located at several horizons can noticeably reduce the effective shear modulus of the host rock.This effect can even provoke a dynamic movement at a previously aseismic fault.展开更多
文摘Mining globally contributes to the growth of many economies of the world. Since its inception, the Zambian mining industry has contributed largely to the country’s economy. The various developments both in technology and knowledge have contributed to the scale at which mining is being done. Challenges in such a setting arise due to the socio-economic and environmental impacts of mining, which create multidimensional problems. The study investigated the importance of engaging stakeholders in progressive rehabilitation programs for large-scale open pit mines, using a case study of the Lumwana Mine and its host community, Manyama. A qualitative approach was used, and data was collected through one-on-one interviews. A combination of convenient and quota sampling was used to engage with host community leaders, professionals and academicians from various fields and institutions. Results showed that most participants had agreed that stakeholder engagement is important for progressive rehabilitation, but the challenge was that the host community and municipal council representatives were not aware of any progressive rehabilitation efforts at Lumwana Mine. This was attributed to a lack of stakeholder engagement and communication of mitigation progress activities by the Lumwana Mine. Results also revealed that the lack of environmental impact assessment regulations to compel companies to involve stakeholders throughout the entire life of the mine other than just at the pre-mining stage led to a lack of compliance and accountability in rehabilitation.
基金financially supported by the National Natural Science Foundation of China(Grant Nos.42102313 and 52104125)the Fundamental Research Funds for the Central Universities(Grant No.B240201094).
文摘In open pit mining,uncontrolled block instabilities have serious social,economic and regulatory consequences,such as casualties,disruption of operation and increased regulation difficulties.For this reason,bench face angle,as one of the controlling parameters associated with block instabilities,should be carefully designed for sustainable mining.This study introduces a discrete fracture network(DFN)-based probabilistic block theory approach for the fast design of the bench face angle.A major advantage is the explicit incorporation of discontinuity size and spatial distribution in the procedure of key blocks testing.The proposed approach was applied to a granite mine in China.First,DFN models were generated from a multi-step modeling procedure to simulate the complex structural characteristics of pit slopes.Then,a modified key blocks searching method was applied to the slope faces modeled,and a cumulative probability of failure was obtained for each sector.Finally,a bench face angle was determined commensurate with an acceptable risk level of stability.The simulation results have shown that the number of hazardous traces exposed on the slope face can be significantly reduced when the suggested bench face angle is adopted,indicating an extremely low risk of uncontrolled block instabilities.
文摘A type of velocity sensor CD 1, an auto recording instrument on blasting vibration YBJ 1 and a random signal and vibration analysis system (CRAS) were used to monitor the particle vibration induced by blasting at open pit slope in Hainan Iron Mine. The attenuating rules of blasting ground vibration on slope were developed. By means of the analysis and calculation of the blasting vibration data at open pit slope and the vertical particle vibration velocity assessment method based on the concept of vibration strength, the empirical attenuating equations which can be used for predicting and estimating the damage of slope were derived.
文摘Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining technology for residual coal of end slopes.In the proposal a conveyance road and ventilation conveyance near the slope are built,corresponding to the pit mining area and the surface coal mine dump,as well as an interval haulage tunnel and air-inlet tunnel.The outcome shows that such mining method may reduce the effect to slope stability from underground mining,it does not affect the dumping advance and has a high recovery rate of residual coal resources.The working face is timbered by single hydraulic props,transported by a scraper conveyor and supported by coal walls.This method of mining is one of layered top coal caving,with high resource recovery,low production cost where positive economic benefit can be realized.
基金This work was financially supported by the National Natural Science Foundation of China (No. 2004BA615A-05).
文摘Combining the GIS (geographic information systems) grid-based data with four proposed column-based 3D slope stability analysis models, a comprehensive solution of a high-steep open-pit slope has been obtained. For six searching ranges, 19 critical slip surfaces of different sizes have been studied, in which the minimum 3D safety factor is 1.33. Comparison of 3D safety factors of designed and proposed slope plans shows for all the critical slip surfaces for the proposed plan, the smallest 3D safety factor is 1.33 under the most unfavorable condition. This means that the proposed plan of the high slopes, about 600 m, of an open pit (2-5° steeper than designed plan) is feasible.
基金Project(2010CB732003) supported by the National Basic Research Program of ChinaProjects(50725931,50779050 and 50909077) supported by the National Natural Science Foundation of China
文摘The measured data of vibrations induced by excavation of deep-buried cavern and open pit with method of bench blasting were analyzed by Fourier Transform and Wavelet Transform,and the characteristics of vibrations induced under these two circumstances were studied.It is concluded that with the similar rock condition and drilling-blasting parameters,vibration induced by bench blasting in deep-buried cavern has a higher main frequency and more scattered energy distribution than that in open pit.The vibration induced by bench blasting in open pit is mainly originated from the blast load,while the vibration induced by bench blasting in deep-buried cavern is the superposition of vibrations induced by blast load and transient release of in-situ stress.The vibration induced by transient release of in-situ stress increases with the stress level.
文摘The design and practice in supporting the cut slope of an open-pit mine wereintroduced, in which the high pressure grouting method was used in reinforcing the weak formation inthe slopes. Based on a detailed geological survey of the slope, a theoretical analysis was carriedout, and the design parameters were proposed, where the Tresca or Mohr-Coulomb yield criteria wasemployed. A patent technology, named 'Technology of high pressure and multiple grouting in differentlevels within a single hole', was employed in the construction. Anchor bars were also installed asgrouting proceeds. This method combines anchoring and grouting comprehensively and was foundsuccessful in practice.
基金This work was financially supported by the National Key Technologies RD Program in the 10th five-year plan (No.2001BA609A-08).
文摘In order to increase production efficiency at open-pit mines, on the basis oflinear programming, a practical mathematical model for optimizing truck flow was developed, whichimproved the traditional fixed manual schedule method. The model has advantages from linearprogramming and objective programming, makes most handling points working at full capacity and keepsan optimized ratio between trucks and excavators. For ensuring feasibility of the model inpractical production, four standards for feasibility test were proposed. The model satisfied all thestandards. The application in a large scale open-pit iron mine indicated that the model reduced thenumber of required trucks by 10 percent compared with the fixed manual schedule method.
基金supported by the National Key Research and Development Program of China Grant NO. 2016YFC0600901the Fundamental Research Funds for the Central Universities Grant NO. 2015QB02。
文摘The geological structure of the Changshanhao open-pit mine in Urad Middle Banner,Inner Mongolia,China is extremely complicated,and slope instability has frequently occurred in various forms,such as wedge sliding,bedding sliding,and toppling failure.In order to study the failure mechanisms of these slopes,the geological structure and mechanical rock properties were investigated based on field investigations and laboratory tests.Numerical models for the present mining area and final mining area of the original scheme were established to analyze slope stability.The results showed that the unique geomorphological characteristics of the mining area were generated by geological tectonism,and the north side of the stope is an anti-dip layered rock slope and the south side is a dip layered rock slope.Slope failure is the consequence of endogenic and exogenic integration,including physical and mechanical properties of the rock mass,geological structures such as faults and joints,and human-caused factors such as blasting and excavation disturbances.Then the original excavation scheme was redesigned mainly by optimizing the slope angle and decreasing the final mining depth to maintain slope stability.Finally,the Monte Carlo method was used to analyze the reliability of the slope angle optimization scheme.The open-pit mine excavation plan that meets the stability requirements was obtained eventually.
基金financially supported by the National Natural Science Foundation of China (No. 51034005)National High Technology Research and Development Program of China (No. 2012AA062004)Program for New Century Excellent Talents in University of China (No. NCET-13-1022)
文摘To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of the 34,600 profile are obtained on the basis of hydrology, geology, and monitoring data.The residual thrust method is utilized to calculate the stability coefficients, which are 1.225 and 1.00 under sound and transfixion conditions, respectively. According to the rock damage and fragmentation and the principle of mechanical parameter degradation, the mechanical models of the slide mass development of the hard and soft rock slopes are established. An integrated model for calculating the slope stability coefficient is built considering water, vibration, and other external factors that pertain to the structural plane damage mechanism and the generating mechanism of the sliding mass. The change curve of the stability coefficient in the slide mass development is obtained from the relevant analyses,and afterwards, the stability control measures are proposed. The analysis results indicate that in the cracking stage of the hard rock, the slope stability coefficient decreases linearly with the increase in the length Lbof the hard rock crack zone. The linear slope is positively correlated to rock cohesion c. In the transfixion stage of the soft rock, the decrease speed of the stability coefficient is positively correlated to the residual strength of the soft rock. When the slope is stable, the stability coefficient is in a quadratic-linear relationship with the decreased height Dh of the side slope and in a linear relationship with anchoring force P.
基金supported by the research projects of the National Natural Science Foundation of China (Grant No. 41401081) "Thermal impacts of organic matter on properties of permafrost soils in the Da Xing'anling (Hinggan) Mountains"the State Key Laboratory of Frozen Soils Engineering, Ministry of Science and Technology, China "Impacts of human activities on the hydrothermal processes of permafrost in the Da Xing'anling (Hinggan) Mountains – a case study from the Gulian strip coal mine" (Grant No. SKLFSE-ZT-41)
文摘Timely and proper backfilling of open-pits in strip coal-mines has been an effective measurement for the recovery of the hydrothermal regimes and ecological environment in permafrost regions. In this study, numerical simulations and statistical regressions were applied for analyzing the recovery processes of the backfill and its major influencing factors for the thermal equilibrium in recently backfilled open pits at the Gulian strip coalmine in Mo'he, Northeast China. Results show that the thermal recovery time of backfilled areas is positively correlated to the backfill depth(BD) of the soils, the backfilled soil temperature(BST), and the mean annual ground surface temperature(MAGST); meanwhile, climate warming can impact on thermal regimes of the backfill area. The impact of climate warming on ground temperature of the backfill will show up significantly in about 50 years afterbackfilling(BD at 10.0 and 20.0 m, BST at 20.0°C) under the climate warming scenario(CWS) of 0.025°C·year ^(-1). Grey-relation analyses show that the sensitivity of the backfill recovery time declines in the order of the BD, BST and MAGST. On the basis of the abovementioned studies, the layer-by-layer backfilling in cold seasons is advised for more effective and more rapid recovery of thermal regimes of the backfilled open-pits in cold regions.
文摘Based on the externality theory and the environmental value theory, the hypothesis of charging for waste dumping of open-pit metal mines was put forth. The charging methods were designed according to the characteristics of waste dumping of openpit metal mines, including charging based on the dumping amount of the total waste, multi-charging factors, exceeding standard punishment charging, and so on. The main charging parameter is based on the dumping area rather than the total amount of waste dumping. The charging model of waste dumping of open-pit mines was formulated, and the charging rate was divided into two parts, i.e., the standard charging rate and the differential charging rate. The standard charging rate was derived using the equilibrium dynamic model, whereas the differential one was obtained by establishing the fuzzy synthesized evaluation model.
文摘Constrained long-term production scheduling problem(CLTPSP) of open pit mines has been extensively studied in the past few decades due to its wide application in mining projects and the computational challenges it poses become an NP-hard problem.This problem has major practical significance because the effectiveness of the schedules obtained has strong economical impact for any mining project.Despite of the rapid theoretical and technical advances in this field,heuristics is still the only viable approach for large scale industrial applications.This work presents an approach combining genetic algorithms(GAs) and Lagrangian relaxation(LR) to optimally determine the CLTPSP of open pit mines.GAs are stochastic,parallel search algorithms based on the natural selection and the process of evolution.LR method is known for handling large-scale separable problems; however,the convergence to the optimal solution can be slow.The proposed Lagrangian relaxation and genetic algorithms(LR-GAs) combines genetic algorithms into Lagrangian relaxation method to update the Lagrangian multipliers.This approach leads to improve the performance of Lagrangian relaxation method in solving CLTPSP.Numerical results demonstrate that the LR method using GAs to improve its performance speeding up the convergence.Subsequently,highly near-optimal solution to the CLTPSP can be achieved by the LR-GAs.
基金Supported by the National Natural Science Foundation of China (40972197,41002107, 41030750)the Program of Knowledge Innovation of the Chinese Academy of Sciences (KZCX2-YW-Q03-02)
文摘To trace the potential hazards of open-pit slope in Longshou mine,global positioning system(GPS) is applied to monitoring ground movement and deformation induced by transition from open-pit to underground mining.Through long-term monitoring from 2003 to 2008,huge amounts of data were acquired.Monitoring results show that large-scale ground movement and deformation have occurred in mining area,and the movement area is ellipse-shaped.The displacement boundary of settlement trough is 2.0 km long along the exploratory line,and 1.5 km long along the strike of ore body.GPS monitoring results basically agree with the practical deformation state of open-pit slope.It is indicated that the long-term GPS monitoring is an effective way to understand the mechanism of ground movement and deformation in mine area. 更多
文摘This paper primarily concerns the effective coordination of the procedures and methods employed in open pit mining operations under the background of river management.The central objective of this study is to identify a viable approach for ensuring rational and efficient development of open pit mineral resources while simultaneously protecting and restoring the ecological environment of the river.This approach should facilitate the realization of a harmonious symbiosis between mining and river management.The intricate mutual influence relationship between river management and open pit mining is first analyzed in depth,which provides a solid foundation for the subsequent coordination strategy development.In light of the aforementioned considerations,a set of coordination procedures for open pit mining based on river management conditions is proposed.These procedures emphasize the integration of river protection into the overall layout of mining at the planning stage.The implementation of scientific mining schemes,accompanied by rigorous control of the scope and depth of mining operations,has proven to be an effective means of reducing the impact of mining activities on river environments.This approach has also facilitated the achievement of a balance and coordination between mining and river management.
基金the key project of the National Natural Science Foundation of China (No. 51034005)the Research Fund for the Doctoral Program of Higher Education of China(No.20100095110019)+1 种基金the National‘‘Twelfth Five-Year’’Plan for Science and Technology Support of China(No.2014BAC14B00)the National High Technology Research and Development Program of China(No.2012AA062004)
文摘Leaving ditches between adjacent mining areas can effectively reduce re-stripping in the latter mining area and simultaneously lead to an increment in internal dumping costs in the former mining area. This paper establishes calculation models for these two marginal costs. The optimizing model for slope cover height can be determined by including marginal cost models in the objective function. The paper has two main contributions:(a) it fully considers redistribution of dumping space in the model;(b) it introduces price fluctuations and cash discounts in the model. We use the typical open-pit mine as an example to test and prove the model. We conclude that a completely covered slope is reasonable in Haerwusu open pit mine; in addition to an increasing price index, the slope cover height can be reduced; and that price changes are one of the most important influencing factors of slope cover height optimization in an open-pit mine.
基金Federal Agency for Support and Evaluation of Graduate Education (CAPES – Brazil, Grant ID 19/2016)Fondation for Research Support of Minas Gerais (FAPEMIG – Brazil)University of New South Wales (UNSW – Australia)
文摘Rock slope hazard assessment is an important part of risk analysis for open pit mines.The main parameters that can lead to rock slope failures are the parameters traditionally used in geomechanical classifications,the slope geometrical parameters and external factors like rainfall and blasting.This paper presents a methodology for a hazard assessment system for open pit mine slopes based on 88 cases collated around the world using principal components analysis,discriminant analysis and confidence ellipses.The historical cases used in this study included copper,gold,iron,diamond,lead and zinc,platinum and claystone mines.The variables used in the assessment methodology are uniaxial compressive strength of intact rock;spacing,persistence,opening,roughness,infilling and orientation of the main discontinuity set;weathering of the rock mass;groundwater;blasting method;and height and inclination of the pit.While principal component analysis was used to quantify the data,the discriminant analysis was used to establish a rule to classify new slopes about its stability condition.To provide a practical hazard assessment system,confidence ellipses were used to propose a hazard graph and generate the HAS-Q.The discriminant rule developed in this research has a high discrimination capacity with an error rate of 11.36%.
文摘Under circumstances in which both underground mining and open-pit mining are employed, the mining effects of two approaches will be superposed and the mining slope will receive several induced stress fields, which makes the sliding mechanism and deformation law of slope rock mass more complicated. This paper, targeting at the east slope of Antaibao Mine with the joint employment of underground mining and open-pit mining, aims to study the moving law of the slope rock mass and the damage mechanism to the overburden of the goaf by numerical simulation. It is supposed that models of possible damage to the slope could be explored for guidance to safety-production of the mine.
基金Russian Foundation for Basic Research,Grant/Award Number:20-55-53031Russian State Task,Grant/Award Number:1021052706247-7-1.5.4National Natural Science Foundation of China,Grant/Award Number:51174012。
文摘The extraction and movement of rock during mining operations is considered a possible trigger for slip along the fault.In this study,possible anthropogenic causes were analyzed for triggering the earthquake with the local magnitude ofML=6.1(at a depth of 4km just beneath the quarry),in the vicinity of the large coal open-pit mine in Russia.This event was the largest earthquake associated with a quarry(an open pit).A sufficiently deep occurrence of the source testified that seismic vibrations were produced in a dynamic slip along a preexisting and prestressed tectonic fault.Analytical calculations were conducted of increments of normal and shear stresses at fault planes with several dip angles at depths corresponding to the probable location of the hypocenter of the Bachat earthquake.As the results show,long-term rock excavations bring a prestressed thrust fault closer to the ultimate Coulomb strength,and stress variations at those depths may suffice to initiate a movement along the fault.By measuring seismic vibrations at different quarries and mines in Russia,the dynamic effect at the supposed depth of the source occurrence could be reliably estimated.As is shown,the ultimate anticipated dynamic deformations are noticeably lower than corresponding values produced by seismic waves of distant earthquakes in the case when the effects of dynamic triggering were observed.Accordingly,the seismic effect of explosions cannot trigger a large earthquake with deep source occurrence.Operations in open-pit mines can only bring forward the moment of an earthquake at a potentially seismogenic fault.At the same time,the numerical calculations reveal that a branching network of underground tunnels located at several horizons can noticeably reduce the effective shear modulus of the host rock.This effect can even provoke a dynamic movement at a previously aseismic fault.