The recently developed European flaw assessment procedure, structural integrity assessment procedure(SiNTAP) is applied to assessment for welded joints of the API 5L X65 pipeline steel with an assumed embedded flaw ...The recently developed European flaw assessment procedure, structural integrity assessment procedure(SiNTAP) is applied to assessment for welded joints of the API 5L X65 pipeline steel with an assumed embedded flaw and surface flaw at the weld toe. As one of the basic input data, fracture toughness crack tip opening displacement (CTOD) tests are conducted at 0℃ and performed according to the requirements of the standard of BS7448. For the heat affected zone (HAZ) specimens, the microstructure observation is performed to insure that the tip of the crack is located in the coarse grain zone. The result explains the dispersity of the test values. In structural integrity assessment procedure-fracture assessment diagram(SINTAP FAD) method, the failure curves of welded joints at level 1 and 3 are derived from the tensile test results. The results of the assessment show that all assessment points are located within the failure lines of analysis level 1 and 3. So the welded joint of the pipeline is safe. This study laid the foundation of application of SINTAP to pipeline structure assessment.展开更多
With the rapid development of flexible interconnection technology in active distribution networks(ADNs),many power electronic devices have been employed to improve system operational performance.As a novel fully-con-t...With the rapid development of flexible interconnection technology in active distribution networks(ADNs),many power electronic devices have been employed to improve system operational performance.As a novel fully-con-trolled power electronic device,energy storage integrated soft open point(ESOP)is gradually replacing traditional switches.This can significantly enhance the controllability of ADNs.To facilitate the utilization of ESOP,device loca-tions and capacities should be configured optimally.Thus,this paper proposes a multi-stage expansion planning method of ESOP with the consideration of tie-line reconstruction.First,based on multi-terminal modular design characteristics,the ESOP planning model is established.A multi-stage planning framework of ESOP is then presented,in which the evolutionary relationship among different planning schemes is analyzed.Based on this framework,a multi-stage planning method of ESOP with consideration of tie-line reconstruction is subsequently proposed.Finally,case studies are conducted on a modified practical distribution network,and the cost-benefit analysis of device and multiple impact factors are given to prove the effectiveness of the proposed method.展开更多
基金This project is supported by National Natural Science Foundation of China(No.50375109).
文摘The recently developed European flaw assessment procedure, structural integrity assessment procedure(SiNTAP) is applied to assessment for welded joints of the API 5L X65 pipeline steel with an assumed embedded flaw and surface flaw at the weld toe. As one of the basic input data, fracture toughness crack tip opening displacement (CTOD) tests are conducted at 0℃ and performed according to the requirements of the standard of BS7448. For the heat affected zone (HAZ) specimens, the microstructure observation is performed to insure that the tip of the crack is located in the coarse grain zone. The result explains the dispersity of the test values. In structural integrity assessment procedure-fracture assessment diagram(SINTAP FAD) method, the failure curves of welded joints at level 1 and 3 are derived from the tensile test results. The results of the assessment show that all assessment points are located within the failure lines of analysis level 1 and 3. So the welded joint of the pipeline is safe. This study laid the foundation of application of SINTAP to pipeline structure assessment.
基金supported by the National Natural Science Foundation of China (51977139,52061635103)Tianjin Science Foundation for Youths (21JCQNJC00430)Science and Technology Project of State Grid Tianjin Electric Power Co. (KJ21-1-36).
文摘With the rapid development of flexible interconnection technology in active distribution networks(ADNs),many power electronic devices have been employed to improve system operational performance.As a novel fully-con-trolled power electronic device,energy storage integrated soft open point(ESOP)is gradually replacing traditional switches.This can significantly enhance the controllability of ADNs.To facilitate the utilization of ESOP,device loca-tions and capacities should be configured optimally.Thus,this paper proposes a multi-stage expansion planning method of ESOP with the consideration of tie-line reconstruction.First,based on multi-terminal modular design characteristics,the ESOP planning model is established.A multi-stage planning framework of ESOP is then presented,in which the evolutionary relationship among different planning schemes is analyzed.Based on this framework,a multi-stage planning method of ESOP with consideration of tie-line reconstruction is subsequently proposed.Finally,case studies are conducted on a modified practical distribution network,and the cost-benefit analysis of device and multiple impact factors are given to prove the effectiveness of the proposed method.