Design and Construction of Automatic Monitoring System for Open-pit Coal Mine Slopes
1
作者 Yu LUO 《Asian Agricultural Research》 2024年第6期19-21,24,共4页
[Objectives]To monitor the stability of open-pit coal mine slopes in real time and ensure the safety of coal mine production.[Methods]The automatic monitoring system of coal mine slope was explored in depth,and the co... [Objectives]To monitor the stability of open-pit coal mine slopes in real time and ensure the safety of coal mine production.[Methods]The automatic monitoring system of coal mine slope was explored in depth,and the core functions of the system were designed comprehensively.According to the design function of the automatic monitoring system,the slope automatic monitoring system was constructed.Besides,in accordance with the actual situation of the slope,the monitoring frequency of slopes was set scientifically,and the key indicators such as rainfall,deep displacement and surface displacement of the slopes were monitored in an all-round and multi-angle way.[Results]During the monitoring period,the overall condition of the slope remained good,and no landslides or other geological disasters occurred.At the same time,the overall rainfall in the slope area remained low.In terms of monitoring data,the horizontal displacement and settlement of the slopes increased first and then tended to be stable.Specifically,the maximum horizontal displacement during the monitoring period was 22.74 mm,while the maximum settlement was 18.65 mm.[Conclusions]The automatic slope monitoring system has obtained remarkable achievements in practical application.It not only improves the accuracy and efficiency of slope stability monitoring,but also provides valuable reference experience for similar projects. 展开更多
关键词 slope monitoring Automatic monitoring technology Global Navigation Satellite SYSTEM (GNSS) monitoring SYSTEM EARLY WARNING
下载PDF
Short-term displacement prediction for newly established monitoring slopes based on transfer learning
2
作者 Yuan Tian Yang-landuo Deng +3 位作者 Ming-zhi Zhang Xiao Pang Rui-ping Ma Jian-xue Zhang 《China Geology》 CAS CSCD 2024年第2期351-364,共14页
This study makes a significant progress in addressing the challenges of short-term slope displacement prediction in the Universal Landslide Monitoring Program,an unprecedented disaster mitigation program in China,wher... This study makes a significant progress in addressing the challenges of short-term slope displacement prediction in the Universal Landslide Monitoring Program,an unprecedented disaster mitigation program in China,where lots of newly established monitoring slopes lack sufficient historical deformation data,making it difficult to extract deformation patterns and provide effective predictions which plays a crucial role in the early warning and forecasting of landslide hazards.A slope displacement prediction method based on transfer learning is therefore proposed.Initially,the method transfers the deformation patterns learned from slopes with relatively rich deformation data by a pre-trained model based on a multi-slope integrated dataset to newly established monitoring slopes with limited or even no useful data,thus enabling rapid and efficient predictions for these slopes.Subsequently,as time goes on and monitoring data accumulates,fine-tuning of the pre-trained model for individual slopes can further improve prediction accuracy,enabling continuous optimization of prediction results.A case study indicates that,after being trained on a multi-slope integrated dataset,the TCN-Transformer model can efficiently serve as a pretrained model for displacement prediction at newly established monitoring slopes.The three-day average RMSE is significantly reduced by 34.6%compared to models trained only on individual slope data,and it also successfully predicts the majority of deformation peaks.The fine-tuned model based on accumulated data on the target newly established monitoring slope further reduced the three-day RMSE by 37.2%,demonstrating a considerable predictive accuracy.In conclusion,taking advantage of transfer learning,the proposed slope displacement prediction method effectively utilizes the available data,which enables the rapid deployment and continual refinement of displacement predictions on newly established monitoring slopes. 展开更多
关键词 LANDSLIDE slope displacement prediction Transfer learning Integrated dataset Transformer Pre-trained model Universal Landslide monitoring Program(ULMP) Geological hazards survey engineering
下载PDF
Integrated simulation and monitoring to analyze failure mechanism of the anti-dip layered slope with soft and hard rock interbedding 被引量:2
3
作者 Jinduo Li Yuan Gao +5 位作者 Tianhong Yang Penghai Zhang Yong Zhao Wenxue Deng Honglei Liu Feiyue Liu 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2023年第9期1147-1164,共18页
The significant difference between the mechanical properties of soft rock and hard rock results in the complexity of the failure mode of the anti-dip layered slope with soft and hard rock interbedding.In order to reve... The significant difference between the mechanical properties of soft rock and hard rock results in the complexity of the failure mode of the anti-dip layered slope with soft and hard rock interbedding.In order to reveal the landslide mechanism,taking the north slope of Fushun West Open-pit Mine as an example,this paper analyzed the failure mechanism of different landslides with monitoring and field surveys,and simulated the evolution of landslides.The study indicated that when the green mudstone(hard rock)of the anti-dip slope contains siltized intercalations(soft rock),the existence of weak layers not only aggravates the toppling deformation of anti-dip layered slope with high dip,but also causes the shear failure of anti-dip layered slope with stable low dip.The shear failure including subsidence induced sliding and wedge failure mainly exists in the unloading zone of the slope.Its failure depth and failure time were far less than that of toppling failure.In terms of the development characteristics of deformation,toppling deformation has the long-term and progressive characteristics,but shear failure deformation has the abrupt and transient characteristics.This study has deepened the understanding of such slope landslide mechanism,and can provide reference for similar engineering. 展开更多
关键词 Anti-dip layered slope Soft and hard rock interbedding Toppling failure Wedge failure Fushun West open-pit Mine
下载PDF
Slope deformation partitioning and monitoring points optimization based on cluster analysis
4
作者 LI Yuan-zheng SHEN Jun-hui +3 位作者 ZHANG Wei-xin ZHANG Kai-qiang PENG Zhang-hai HUANG Meng 《Journal of Mountain Science》 SCIE CSCD 2023年第8期2405-2421,共17页
The scientific and fair positioning of monitoring locations for surface displacement on slopes is a prerequisite for early warning and forecasting.However,there is no specific provision on how to effectively determine... The scientific and fair positioning of monitoring locations for surface displacement on slopes is a prerequisite for early warning and forecasting.However,there is no specific provision on how to effectively determine the number and location of monitoring points according to the actual deformation characteristics of the slope.There are still some defects in the layout of monitoring points.To this end,based on displacement data series and spatial location information of surface displacement monitoring points,by combining displacement series correlation and spatial distance influence factors,a spatial deformation correlation calculation model of slope based on clustering analysis was proposed to calculate the correlation between different monitoring points,based on which the deformation area of the slope was divided.The redundant monitoring points in each partition were eliminated based on the partition's outcome,and the overall optimal arrangement of slope monitoring points was then achieved.This method scientifically addresses the issues of slope deformation zoning and data gathering overlap.It not only eliminates human subjectivity from slope deformation zoning but also increases the efficiency and accuracy of slope monitoring.In order to verify the effectiveness of the method,a sand-mudstone interbedded CounterTilt excavation slope in the Chongqing city of China was used as the research object.Twenty-four monitoring points deployed on this slope were monitored for surface displacement for 13 months.The spatial location of the monitoring points was discussed.The results show that the proposed method of slope deformation zoning and the optimized placement of monitoring points are feasible. 展开更多
关键词 Excavation slope Surface displacement monitoring Spatial deformation analysis Clustering analysis slope deformation partitioning monitoring point optimization
下载PDF
Study on the Application of Real-Time Drone Monitoring in Ordos Open-Pit Coal Mine
5
作者 Junyi Wu Weizheng Wang Xuesong Ni 《Open Journal of Applied Sciences》 CAS 2023年第4期483-495,共13页
In the process of intelligent mine construction in open-pit mine, in order to improve the safety monitoring ability of mine transportation system, solve the problems of large human interference and blind Angle detecti... In the process of intelligent mine construction in open-pit mine, in order to improve the safety monitoring ability of mine transportation system, solve the problems of large human interference and blind Angle detection by existing conventional monitoring methods, this paper establishes an open-pit mine monitoring data set, and proposes a real-time intelligent monitoring model based on UAV. The reasoning component with strong computing power and low power consumption is selected, and the lightweight object detection model is selected for the experiment. A quantitative standard of dynamic energy consumption detection by evaluation algorithm is proposed. Through experimental comparison, it is found that YOLOv4-tiny has the highest comprehensive grade in detection accuracy, speed, energy consumption and other aspects, which is suitable for application in the above model. 展开更多
关键词 open-pit Mine Safety monitoring UAV Object Detection
下载PDF
High precision slope deformation monitoring model based on the GPS/Pseudolites technology in open-pit mine 被引量:26
6
作者 WANG Jianpeng, GAO Jingxiang, LIU Chao, WANG Jian School of Environment and Spatial Informatics, China University of Mining & Technology, Xuzhou 221008, China 《Mining Science and Technology》 EI CAS 2010年第1期126-131,137,共7页
As the number and geometric intensity of visual satellites are susceptible to large slopes in open-pit mines, we propose integration of GPS/Pseudolites (PLs) positioning technology which can increase the number of vis... As the number and geometric intensity of visual satellites are susceptible to large slopes in open-pit mines, we propose integration of GPS/Pseudolites (PLs) positioning technology which can increase the number of visible satellites, strengthen the geometric intensity of satellites and provide a precision solution for slope deformation monitoring. However, the un-modeled systematic errors are still the main limiting factors for high precision baseline solution. In order to eliminate the un-modeled systematic error, the Empirical Mode Decomposition (EMD) theory is employed. The multi-scale decomposition and reconstruction architecture are defined here on the basis of the EMD theory and the systematic error mitigation model is demonstrated as well. A standard of the scale selection for the systematic error elimination is given in terms of the mean of the accumulated standardized modes. Thereafter, the scheme of the GPS/PLs baseline solution based on the EMD is suggested. The simulation and experiment results show that the precision factors (DOP) are reduced greatly when PLs is located suitably. The proposed scheme dramatically improves the reliability of ambiguity resolution and the precision of baseline vector after systematic error being eliminated, and provides an effective model for high precision slope deformation monitoring in open-pit mine. 展开更多
关键词 open-pit mine slope deformation PLS EMD
下载PDF
Monitoring and Assessing Method for Blasting Vibration on Open-pit Slope in Hainan Iron Mine 被引量:3
7
作者 SONG Guang ming 1,SHI Xiu zhi 1,ZHOU Zhi guo 1,CHEN Shou ru 1,XIAO Qing hua 2 (1 College of Resources, Environment and Civil Engineering, Central South University of Technology, Changsha 410083, China 2 Production and Technology Departmen 《Journal of Central South University》 SCIE EI CAS 2000年第2期72-74,共3页
A type of velocity sensor CD 1, an auto recording instrument on blasting vibration YBJ 1 and a random signal and vibration analysis system (CRAS) were used to monitor the particle vibration induced by blasting at open... A type of velocity sensor CD 1, an auto recording instrument on blasting vibration YBJ 1 and a random signal and vibration analysis system (CRAS) were used to monitor the particle vibration induced by blasting at open pit slope in Hainan Iron Mine. The attenuating rules of blasting ground vibration on slope were developed. By means of the analysis and calculation of the blasting vibration data at open pit slope and the vertical particle vibration velocity assessment method based on the concept of vibration strength, the empirical attenuating equations which can be used for predicting and estimating the damage of slope were derived. 展开更多
关键词 blasting vibration OPEN pit slope monitoring ASSESSING
下载PDF
Effect of digital elevation models on monitoring slope displacements in open-pit mine by differential interferometry synthetic aperture radar 被引量:4
8
作者 I Nyoman Sudi Parwata Shinichiro Nakashima +1 位作者 Norikazu Shimizu Takahiro Osawa 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2020年第5期1001-1013,共13页
Displacement monitoring in open-pit mines is one of the important tasks for safe management of mining processes.Differential interferometric synthetic aperture radar(DInSAR),mounted on an artificial satellite,has the ... Displacement monitoring in open-pit mines is one of the important tasks for safe management of mining processes.Differential interferometric synthetic aperture radar(DInSAR),mounted on an artificial satellite,has the potential to be a cost-effective method for monitoring surface displacements over extensive areas,such as open-pit mines.DInSAR requires the ground surface elevation data in the process of its analysis as a digital elevation model(DEM).However,since the topography of the ground surface in open-pit mines changes largely due to excavations,measurement errors can occur due to insufficient information on the elevation of mining areas.In this paper,effect of different elevation models on the accuracy of the displacement monitoring results by DInSAR is investigated at a limestone quarry.In addition,validity of the DInSAR results using an appropriate DEM is examined by comparing them with the results obtained by global positioning system(GPS)monitoring conducted for three years at the same limestone quarry.It is found that the uncertainty of DEMs induces large errors in the displacement monitoring results if the baseline length of the satellites between the master and the slave data is longer than a few hundred meters.Comparing the monitoring results of DInSAR and GPS,the root mean square error(RMSE)of the discrepancy between the two sets of results is less than 10 mm if an appropriate DEM,considering the excavation processes,is used.It is proven that DInSAR can be applied for monitoring the displacements of mine slopes with centimeter-level accuracy. 展开更多
关键词 open-pit mine slope monitoring Digital elevation model(DEM) Interferometric synthetic aperture radar (InSAR) Differential interferometric synthetic aperture radar(DInSAR)
下载PDF
Sensitivity analysis for parameters of a monitoring system for steep slopes of open-pit mines 被引量:3
9
作者 HAN Xue HE Man-chao ZHANG Bi 《Mining Science and Technology》 EI CAS 2009年第4期441-445,共5页
Monitoring the stability of steep slopes of open-pit mines is a major issue relating to production safety in mines.In order to determine the technical parameters of a new type of supervising system applied in monitori... Monitoring the stability of steep slopes of open-pit mines is a major issue relating to production safety in mines.In order to determine the technical parameters of a new type of supervising system applied in monitoring steep slopes of open-pit mines,the MSARMA method was used to establish analytical models for the monitoring system,given various parameter settings based on the description of mechanical monitoring principles.We used this sensitivity analysis to conclude that the setting of the most sensitive location of a mechanical monitoring system should be within a range of 1/5~1/2 of the lower part in a vertical direction of steep slopes,with a rational and feasible range of the dip angle setting between 0°~20°.Given the analytical results of our on-site experiments,we have shown that the parameters determined reflect the stability of steep slopes accurately and effectively.These conclusions provide a basis for the application of a new type of steep slope stability monitoring technology in open-pit mines. 展开更多
关键词 open-pit mine steep slope monitoring system setting parameter analysis
下载PDF
Efficient Bayesian networks for slope safety evaluation with large quantity monitoring information 被引量:8
10
作者 Xueyou Li Limin Zhang Shuai Zhang 《Geoscience Frontiers》 SCIE CAS CSCD 2018年第6期1679-1687,共9页
New sensing and wireless technologies generate massive data. This paper proposes an efficient Bayesian network to evaluate the slope safety using large-quantity field monitoring information with underlying physical me... New sensing and wireless technologies generate massive data. This paper proposes an efficient Bayesian network to evaluate the slope safety using large-quantity field monitoring information with underlying physical mechanisms. A Bayesian network for a slope involving correlated material properties and dozens of observational points is constructed. 展开更多
关键词 slope reliability monitoring INFORMATION BAYESIAN networks RISK management VALUE of INFORMATION BIG data
下载PDF
Microseismic monitoring and numerical simulation on the stability of high-steep rock slopes in hydropower engineering 被引量:6
11
作者 Chun’an Tang Lianchong Li +1 位作者 Nuwen Xu Ke Ma 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2015年第5期493-508,共16页
For high-steep slopes in hydropower engineering, damage can be induced or accumulated due to a seriesof human or natural activities, including excavation, dam construction, earthquake, rainstorm, rapid riseor drop of ... For high-steep slopes in hydropower engineering, damage can be induced or accumulated due to a seriesof human or natural activities, including excavation, dam construction, earthquake, rainstorm, rapid riseor drop of water level in the service lifetime of slopes. According to the concept that the progressivedamage (microseismicity) of rock slope is the essence of the precursor of slope instability, a microseismicmonitoring system for high-steep rock slopes is established. Positioning accuracy of the monitoringsystem is tested by fixed-position blasting method. Based on waveform and cluster analyses of microseismicevents recorded during test, the tempo-spatial distribution of microseismic events is analyzed.The deformation zone in the deep rock masses induced by the microseismic events is preliminarilydelimited. Based on the physical information measured by in situ microseismic monitoring, an evaluationmethod for the dynamic stability of rock slopes is proposed and preliminarily implemented bycombining microseismic monitoring and numerical modeling. Based on the rock mass damage modelobtained by back analysis of microseismic information, the rock mass elements within the microseismicdamage zone are automatically searched by finite element program. Then the stiffness and strengthreductions are performed on these damaged elements accordingly. Attempts are made to establish thecorrelation between microseismic event, strength deterioration and slope dynamic instability, so as toquantitatively evaluate the dynamic stability of slope. The case studies about two practical slopes indicatethat the proposed method can reflect the factor of safety of rock slope more objectively. Numericalanalysis can help to understand the characteristics and modes of the monitored microseismic events inrock slopes. Microseismic monitoring data and simulation results can be used to mutually modify thesensitive rock parameters and calibrate the model. Combination of microseismic monitoring and numericalsimulation provides a more objective basis for the numerical model and parameters and a solidmechanical foundation for the microseismic monitoring. 展开更多
关键词 Rock slope Stability analysis DAMAGE Microseismic monitoring Numerical simulation
下载PDF
Influences of rainfall infiltration on stability of accumulation slope by in-situ monitoring test 被引量:9
12
作者 周中 王宏贵 +1 位作者 傅鹤林 刘宝琛 《Journal of Central South University》 SCIE EI CAS 2009年第2期297-302,共6页
In order to improve the understanding of the fundamental mechanism of rainfall infiltration induced landslides in accumulation slope and to clarify some important characteristics of slope performance,artificial rainfa... In order to improve the understanding of the fundamental mechanism of rainfall infiltration induced landslides in accumulation slope and to clarify some important characteristics of slope performance,artificial rainfall simulation tests and field synthetic monitoring were carried out on a typical accumulation slope of Shangrui Freeway in Guizhou Province,China.The monitoring results show that the most accumulation landslides caused by rainfall infiltration are shallow relaxation failure,whose deformation zone lies within the top 0-4 m soil layer.The deformation of slope gradually reduces from the surface,where the greatest deformation lies in,to the deep part of slope.The average percentage of infiltration during the first 2 h is 86%,and then it reduces gradually with time because of the increase of the surface runoff.The average percentage of infiltration drop to a relatively stable value(50%)after 6 h.Rainfall infiltration causes obvious increase of pore-water pressure,which may result in a reduction of shear strength due to a decrease in effective stress and wetting-induced softening.The double-effect of rainfall infiltration is the main reason of rainfall infiltration induced landslides in accumulation slope. 展开更多
关键词 accumulation slope STABILITY rainfall infiltration in-situ monitoring
下载PDF
Distributed Fiber Optic Monitoring and Stability Analysis of a Model Slope under Surcharge Loading 被引量:23
13
作者 ZHU Hong-Hu SHI Bin +2 位作者 ZHANG Jie YAN Jun-Fan ZHANG Cheng-Cheng 《Journal of Mountain Science》 SCIE CSCD 2014年第4期979-989,共11页
In the discipline of geotechnical engineering, fiber optic sensor based distributed monitoring has played an increasingly important role over the past few decades. Compared with conventional sensors, fiber optic senso... In the discipline of geotechnical engineering, fiber optic sensor based distributed monitoring has played an increasingly important role over the past few decades. Compared with conventional sensors, fiber optic sensors have a variety of exclusive advantages, such as smaller size, higher precision, and better corrosion resistance. These innovative monitoring technologies have been successfully applied for performance monitoring of geo-structures and early warning of potential geo- hazards around the world. In order to investigate their ability to monitor slope stability problems, a medium-sized model of soil nailed slope has been constructed in laboratory. The fully distributed Brillouin optical time-domain analysis (BOTDA) sensing technology was employed to measure the horizontal strain distributions inside the model slope. During model construction, a specially designed strain sensing fiber was buried in the soil mass. Afterward, the surcharge loading was applied on the slope crest in stages using hydraulic jacks and a reaction frame. During testing, an NBX-6o5o BOTDA sensing interrogator was used to collect the fiber optic sensing data. The test results have been analyzed in detail, which shows that the fiber optic sensors can capture the progressive deformation and failure pattern of the model slope. The limit equilibrium analyses were also conducted to obtain the factors ofsafety of the slope under different surface loadings. It is found that the characteristic maximum strains can reflect the stability of the model slope and an empirical relationship was obtained, This study verified the effectiveness of the distributed BOTDA sensing technology in performance monitoring of slope. 展开更多
关键词 slope stability Geotechnical monitoring Fiber optic sensor Distributed strain sensing Brillouin optical time-domain analysis (BOTDA) Model test
下载PDF
Slope Seismic Response Monitoring on the Aftershocks of the Wenchuan Earthquake in the Mianzhu Section 被引量:6
14
作者 WANG Yunsheng LUO Yonghong +4 位作者 WANG Fuhai WANG Dong MA Xiao LI Shun DENG Xi 《Journal of Mountain Science》 SCIE CSCD 2012年第4期523-528,共6页
Previous investigations have shown that the seismic response of slopes during the Wenchuan earthquake was highly variable. The present study tries to give an answer to the question: Which are the main factors affecti... Previous investigations have shown that the seismic response of slopes during the Wenchuan earthquake was highly variable. The present study tries to give an answer to the question: Which are the main factors affecting the seismic response degree of slopes? With the support of the China Geological Survey Bureau, we set 3 monitoring sections in Jiulong slope, Mianzhu city, China with the aim to record the site response of the slope during the affershoeks of the Wenehuan earthquake. After the Wenchuan earthquake, which happened on 12 May 2008, 30 aftershocks have been recorded in these monitoring points. We analyzed 11 records, with magnitudes ranging from ML = 4.6 to ML = 3.1. The amplification factors of the horizontal compound PGA and 3D compound PGA have been determined for the 3 points at different elevations on the slope. Results showed that the dynamic response of the slope on the earthquake was controlled by factors such as topography and the thickness of the Quaternary overburden. 展开更多
关键词 Seismic response slope monitoring Longmen Mountains AFTERSHOCKS Wenchuanearthquake
下载PDF
Monitoring result analyses of high slope of five-step ship lock in the Three Gorges Project 被引量:4
15
作者 Qixiang Fan Hongbing Zhu Jun Gen 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2015年第2期199-206,共8页
The construction of the double-lane five-step ship lock of the Three Gorges Project (TGP) wascommenced in 1994, the excavation of the ship lock was completed by the end of 1999, and the ship lockwas put in operation... The construction of the double-lane five-step ship lock of the Three Gorges Project (TGP) wascommenced in 1994, the excavation of the ship lock was completed by the end of 1999, and the ship lockwas put in operation in June 2003. The side slopes of the ship lock are characterized by great height(170 m), steepness (70 m in height of upright slope), and great length (over 7000 m in total length). Inassociation with the ship lock, the surrounding rocks in slope have a high potential to deform, withwhich the magnitude of deformation is restricted. Monitoring results show that the deformation of thefive-step ship lock high slopes of the TGP primarily occurred in excavation period, and deformationtended to be stable and convergent during operation period, suggesting the allowable ranges of deformation.At present, the slopes and lock chambers are stable, and the ship lock works well under normaloperation condition, enabling the social and economic benefits of the TGP. 2015 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting byElsevier B.V. All rights reserved. 展开更多
关键词 Three Gorges Project(TGP) Five-step ship lock slope monitoring analysis
下载PDF
Effect of slope angle on fractured rock masses under combined influence of variable rainfall infiltration and excavation unloading 被引量:1
16
作者 Xiaoshuang Li Qihang Li +3 位作者 Yunmin Wang Wei Liu Di Hou Chun Zhu 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第10期4154-4176,共23页
Intense precipitation infiltration and intricate excavation processes are crucial factors that impact the stability and security of towering and steep rock slopes within mining sites.The primary aim of this research w... Intense precipitation infiltration and intricate excavation processes are crucial factors that impact the stability and security of towering and steep rock slopes within mining sites.The primary aim of this research was to investigate the progression of cumulative failure within a cracked rock formation,considering the combined effects of precipitation and excavation activities.The study was conducted in the Huangniuqian eastern mining area of the Dexing Copper Mine in Jiangxi Province,China.An engineering geological investigation was conducted,a physical model experiment was performed,numerical calculations and theoretical analysis were conducted using the matrix discrete element method(Mat-DEM),and the deformation characteristics and the effect of the slope angle of a fractured rock mass under different scenarios were examined.The failure and instability mechanisms of the fractured rock mass under three slope angle models were analyzed.The experimental results indicate that as the slope angle increases,the combined effect of rainfall infiltration and excavation unloading is reduced.A novel approach to simulating unsaturated seepage in a rock mass,based on the van Genuchten model(VGM),has been developed.Compared to the vertical displacement observed in a similar physical experiment,the average relative errors associated with the slope angles of 45,50,and 55were 2.094%,1.916%,and 2.328%,respectively.Accordingly,the combined effect of rainfall and excavation was determined using the proposed method.Moreover,the accuracy of the numerical simulation was validated.The findings contribute to the seepage field in a meaningful way,offering insight that can inform and enhance existing methods and theories for research on the underlying mechanism of ultra-high and steep rock slope instability,which can inform the development of more effective risk management strategies. 展开更多
关键词 open-pit to underground excavation Rainfall infiltration Similarity simulation Numerical simulation Image recognition slope angle
下载PDF
Monitoring slope deformation using a 3-D laser image scanning system: a case study 被引量:10
17
作者 YUE Depeng WANG Jiping +2 位作者 ZHOU Jinxing CHEN Xiaoxue REN Huijun 《Mining Science and Technology》 EI CAS 2010年第6期898-903,共6页
An ILRIS-36D 3-D laser image scanning system was used to monitor the Anjialing strip mine slope on Pingshuo in Shanxi province. The basic working principles, performance indexes, features and data collection and proce... An ILRIS-36D 3-D laser image scanning system was used to monitor the Anjialing strip mine slope on Pingshuo in Shanxi province. The basic working principles, performance indexes, features and data collection and processing methods are illus-trated. The point cloud results are analyzed in detail. The rescale range analysis method was used to analyze the deformation char-acteristics of the slope. The results show that the trend of slope displacement is stable and that the degree of landslide danger is low. This work indicates that 3-D laser image scanning can supply multi-parameter, high precision real time data over long distances. These data can be used to study the distortion of the slope quickly and accurately. 展开更多
关键词 3-D laser image scanning system ILRIS-36D -distortion slope monitor
下载PDF
Automatic prediction of time to failure of open pit mine slopes based on radar monitoring and inverse velocity method 被引量:10
18
作者 Osasan K.S. Stacey T.R. 《International Journal of Mining Science and Technology》 SCIE EI 2014年第2期275-280,共6页
Radar slope monitoring is now widely used across the world, for example, the slope stability radar(SSR)and the movement and surveying radar(MSR) are currently in use in many mines around the world.However, to fully re... Radar slope monitoring is now widely used across the world, for example, the slope stability radar(SSR)and the movement and surveying radar(MSR) are currently in use in many mines around the world.However, to fully realize the effectiveness of this radar in notifying mine personnel of an impending slope failure, a method that can confidently predict the time of failure is necessary. The model developed in this study is based on the inverse velocity method pioneered by Fukuzono in 1985. The model named the slope failure prediction model(SFPM) was validated with the displacement data from two slope failures monitored with the MSR. The model was found to be very effective in predicting the time to failure while providing adequate evacuation time once the progressive displacement stage is reached. 展开更多
关键词 slope monitoring radar Displacement Rate of displacement slope failure slope monitoring Time to failure
下载PDF
Investigation on long-term progressive deformation of engineering slope based on comprehensive monitoring 被引量:2
19
作者 ZHANG Shi-shu GUO Song-feng +9 位作者 QI Sheng-wen TANG Feng-jiao HU Jin-shan ZHAO Xiao-ping RAN Cong-yan WANG Xin ZOU Yu HUANG Xiao-lin ZHENG Bo-wen LIANG Ning 《Journal of Mountain Science》 SCIE CSCD 2022年第6期1576-1587,共12页
A landslide always results from a progressive process of slope deformation. In recent years, an increasing number of slope instabilities have occurred with regard to human engineering activities such as hydropower or ... A landslide always results from a progressive process of slope deformation. In recent years, an increasing number of slope instabilities have occurred with regard to human engineering activities such as hydropower or traffic construction in mountainous area, which cause even greater casualties and economic loss compared with the natural hazards. The development of such earth surface process may hold long period with mechanisms still not fully understood. Using monitoring technology is an effective and intuitive approach to assist analyzing the slope deformation process and their driving factors. This study presents an engineering slope excavated during the construction of Changheba Hydropower Station, which is located in the upper reaches of Dadu River, Sichuan Province, southwest China. The engineering slope experienced and featured a five-year continuous deformation which caused continuous high risks to the engineering activities. We conducted in-depth analysis for such a long-term deformation process based on ground and subsurface monitoring data, collected successive data with a series of monitoring equipment such as automated total station, borehole inclinometers and other auxiliary apparatus, and identified the deformation process based on the comprehensive analysis of monitoring data as well as field investigation. After analyzing the effects of engineering activities and natural factors on the continuous deformation, we found that the overburden strata provided deformable mass while the excavation-produced steep terrain initiated the slope deformation in limit equilibrium state over a long period of time;afterwards, the intense rainwater accelerated slope deformation in the rainy season. 展开更多
关键词 Engineering slope Mountainous area Long-term deformation LANDSLIDES monitoring STABILITY
下载PDF
Applying real time seismic monitoring technology for slope stability assessment—An Indian opencast coal mine perspective 被引量:9
20
作者 Vinoth S. Ajay Kumar L. 《International Journal of Mining Science and Technology》 SCIE EI 2014年第1期75-80,共6页
This paper outlines the results obtained from real time microseismic monitoring of an opencast coal mine in South India.The objective of the study is to investigate the stress changes within the rockmass along the slo... This paper outlines the results obtained from real time microseismic monitoring of an opencast coal mine in South India.The objective of the study is to investigate the stress changes within the rockmass along the slope due to underground mine development operation and their impact on the stability of the highwall slope.The installed microseismic systems recorded the seismic triggerings down toà2 moment magnitude.In general,most of the events recorded during the monitoring period are weak in seismic energy.The study adopts a simple and more reliable tool to characterize the seismically active zone for assessing the stability of the highwall in real time.The impact of underground working on the slope is studied on the basis of the seismic event impact contours and seismic clusters.During the monitoring period,it is observed that the intensity of the overall microseismic activity along the slope due to the mine development operations did not cause any adverse impact on the highwall stability. 展开更多
关键词 Seismic monitoring Induced seismicity Seismic clusters slope stability Opencast mining