期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Design and development of a synchronized operation control system for Thomson scattering diagnostic on J-TEXT
1
作者 Jingjun ZHOU Li GAO +2 位作者 Yinan ZHOU Jiefeng HUANG Ge ZHUANG 《Plasma Science and Technology》 SCIE EI CAS CSCD 2018年第8期1-5,共5页
A Thomson scattering diagnostic system is under construction at the Joint Texas Experimental Tokamak(J-TEXT). A 1064 nm Nd:YAG laser with 50 Hz repetition rate is used as the laser source. We have used a software f... A Thomson scattering diagnostic system is under construction at the Joint Texas Experimental Tokamak(J-TEXT). A 1064 nm Nd:YAG laser with 50 Hz repetition rate is used as the laser source. We have used a software for careful and precise control of the laser through serial communication. A time sequence operating system has been developed to synchronize the laser control and data acquisition system with the central control system(CSS). The system operates commands from the CSS of J-TEXT and generates triggers for the laser and data acquisition system in the proper sequence. It also measures an asynchronous time value that is needed for accurate time stamping. All functions are served by a field-programmable gate array development platform that is suitable for high-speed data and signal processing applications.Several embedded peripherals, including Ethernet and USB 2.0, provide communication with the CSS and the server. 展开更多
关键词 Thomson scattering diagnostic laser control synchronized operation
下载PDF
Guidance and evaluation system for smooth operation of heavy-haul trains
2
作者 Zhi Zhang Xiang Wei +1 位作者 Tao Zhang Songxu Wang 《Transportation Safety and Environment》 EI 2020年第3期226-235,共10页
The operation rules and methods for heavy-haul trains were studied and summarized according to the characteristics of the Daqin Railway,such as a large traffic volume,a high density and high-speed and difficult-to-ope... The operation rules and methods for heavy-haul trains were studied and summarized according to the characteristics of the Daqin Railway,such as a large traffic volume,a high density and high-speed and difficult-to-operate heavy-haul trains.Combined with traction calculation and operation experience,these can be quantificationally decomposed into an evaluation standard for the smooth modularized operation of heavy-haul trains that can be recognized by computers.A train operation guidance system was designed to collect locomotive drivers’operation data,display the actual operation and standard curves in real time and give voice prompts and violation-operation alarms for safety-critical operation.In addition,software for operation analysis and evaluation was developed according to the quantified smooth operation standard.The smooth operation of heavy-haul trains was evaluated and statistically analysed through a comparative analysis of the actual operation records.Moreover,a train impact force detection device capable of monitoring the three-dimensional impact force of heavy-haul trains in real time was developed.Meanwhile,the evaluation standard for smooth operation was verified and optimized by real-time monitoring of the impact force of heavy-haul trains.Finally,on the basis of the above studies,a complete closed-loop management scheme for the smooth operation of heavy-haul trains was constructed,and the objectives of optimizing train operation strategy,standardizing drivers’operations and ensuring the smooth operation of trains were realized through application. 展开更多
关键词 heavy-haul trains smooth operation traction calculation synchronous operation simplified line model
原文传递
Synchronous Construction and Operation of Coal Mine and Power Plant in Mining Area
3
作者 Zheng Yonglian (Diector ,Power under Yongxia Area Management Committee ,Henan)Wang Jiawer (Yongxia Mining Area Management Committee ,Henan) 《China Coal》 1997年第S1期34-35,共2页
In accordance with the experience withSynchronous construction of coal mine andpower plant in Yongxia mining area, thispaper discusses the existing issues regardingmine mouth power plant including capital,power grid c... In accordance with the experience withSynchronous construction of coal mine andpower plant in Yongxia mining area, thispaper discusses the existing issues regardingmine mouth power plant including capital,power grid connection, electricity price for gridconnection, installed capacity generation setselection as well as self- protection of coalindustry. It is regarded that under marketeconomy as long as the benefits of the threesectors of coal, electricity and the local arecomprehensively considered, a suitable waycan be arrived for conl industry to operate electricity business. 展开更多
关键词 Synchronous Construction and Operation of Coal Mine and Power Plant in Mining Area
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部