1. Southern Coastal Optical Cable Engineering Project. The cable was completed and put into operation in 1992, and has a total length of 2,800km, starting from Nanjing in the north, via Shanghai, Hangzhou, Fuzhou, Xia...1. Southern Coastal Optical Cable Engineering Project. The cable was completed and put into operation in 1992, and has a total length of 2,800km, starting from Nanjing in the north, via Shanghai, Hangzhou, Fuzhou, Xiamen, Huizhou, leading to Guangzhou in the south, covering Jiangsu, Shanghai, Zhejiang, Fujian and Guangdong. The whole line has展开更多
文摘1. Southern Coastal Optical Cable Engineering Project. The cable was completed and put into operation in 1992, and has a total length of 2,800km, starting from Nanjing in the north, via Shanghai, Hangzhou, Fuzhou, Xiamen, Huizhou, leading to Guangzhou in the south, covering Jiangsu, Shanghai, Zhejiang, Fujian and Guangdong. The whole line has