Planning and production optimization within multiple mines or several work sites (entities) mining systems by using fuzzy linear programming (LP) was studied. LP is the most commonly used operations research metho...Planning and production optimization within multiple mines or several work sites (entities) mining systems by using fuzzy linear programming (LP) was studied. LP is the most commonly used operations research methods in mining engineering. After the introductory review of properties and limitations of applying LP, short reviews of the general settings of deterministic and fuzzy LP models are presented. With the purpose of comparative analysis, the application of both LP models is presented using the example of the Bauxite Basin Niksic with five mines. After the assessment, LP is an efficient mathematical modeling tool in production planning and solving many other single-criteria optimization problems of mining engineering. After the comparison of advantages and deficiencies of both deterministic and fuzzy LP models, the conclusion presents benefits of the fuzzy LP model but is also stating that seeking the optimal plan of production means to accomplish the overall analysis that will encompass the LP model approaches.展开更多
Aiming at the limitations of the traditional mathematical model for production planning, a novel optimization model is proposed to improve the efficiency and performance for production planning in steelmaking and cont...Aiming at the limitations of the traditional mathematical model for production planning, a novel optimization model is proposed to improve the efficiency and performance for production planning in steelmaking and continuous casting (SCC) process. The optimization model combined with parallel-backward inferring algorithm and genetic algorithm is described. To analyze and evaluate the production plans, a simulation model based on cellular automata is presented. And then, the integrated system including the production plan optimization model and the simulation model is introduced to evaluate and adjust the production plan on-line. The test with production data in a steel plant shows that the optimization model demonstrates ability to deal with time uncertainty in production planning and to set up a conflict-free production plan, and the integrated system provides a useful tool for dynamically drawing and adjusting a production plan on-line. The average staying time of the production plan is about 5% shorter than that in a practical process.展开更多
文摘Planning and production optimization within multiple mines or several work sites (entities) mining systems by using fuzzy linear programming (LP) was studied. LP is the most commonly used operations research methods in mining engineering. After the introductory review of properties and limitations of applying LP, short reviews of the general settings of deterministic and fuzzy LP models are presented. With the purpose of comparative analysis, the application of both LP models is presented using the example of the Bauxite Basin Niksic with five mines. After the assessment, LP is an efficient mathematical modeling tool in production planning and solving many other single-criteria optimization problems of mining engineering. After the comparison of advantages and deficiencies of both deterministic and fuzzy LP models, the conclusion presents benefits of the fuzzy LP model but is also stating that seeking the optimal plan of production means to accomplish the overall analysis that will encompass the LP model approaches.
基金Item Sponsored by National High-Tech Research and Development Plan of China(2007AA04Z161)
文摘Aiming at the limitations of the traditional mathematical model for production planning, a novel optimization model is proposed to improve the efficiency and performance for production planning in steelmaking and continuous casting (SCC) process. The optimization model combined with parallel-backward inferring algorithm and genetic algorithm is described. To analyze and evaluate the production plans, a simulation model based on cellular automata is presented. And then, the integrated system including the production plan optimization model and the simulation model is introduced to evaluate and adjust the production plan on-line. The test with production data in a steel plant shows that the optimization model demonstrates ability to deal with time uncertainty in production planning and to set up a conflict-free production plan, and the integrated system provides a useful tool for dynamically drawing and adjusting a production plan on-line. The average staying time of the production plan is about 5% shorter than that in a practical process.