期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Optimal ship imaging for shore-based ISAR using DCF estimation 被引量:1
1
作者 Ling Wang Zhenxiao Cao +2 位作者 Ning Li Teng Jing Daiyin Zhu 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2015年第4期739-745,共7页
The optimal imaging time selection of ship targets for shore-based inverse synthetic aperture radar (ISAR) in high sea conditions is investigated. The optimal imaging time includes opti- mal imaging instants and opt... The optimal imaging time selection of ship targets for shore-based inverse synthetic aperture radar (ISAR) in high sea conditions is investigated. The optimal imaging time includes opti- mal imaging instants and optimal imaging duration. A novel method for optimal imaging instants selection based on the estimation of the Doppler centroid frequencies (DCFs) of a series of images obtained over continuous short durations is proposed. Combined with the optimal imaging duration selection scheme using the image contrast maximization criteria, this method can provide the ship images with the highest focus. Simulated and real data pro- cessing results verify the effectiveness of the proposed imaging method. 展开更多
关键词 inverse synthetic aperture radar (ISAR) ship target optimal imaging time selection Doppler centroid frequency (DCF).
下载PDF
Ready-to-implement low-carbon retrofit of coal-fired power plants in China:Optimal scenarios selection based on sludge and photovoltaic utilization
2
作者 Yunchao Xia Jian Deng +4 位作者 Bo Hu Qing Yang Jianlan Li Hongqun Gu Guiping Zhou 《Environmental Science and Ecotechnology》 SCIE 2022年第1期60-71,共12页
Currently the flexible demand for high proportion penetration of renewable energy depends on coal-fired units(CFUs),and the large-scale phase-out of CFUs in a short time is not realistic in China.Due to urban expansio... Currently the flexible demand for high proportion penetration of renewable energy depends on coal-fired units(CFUs),and the large-scale phase-out of CFUs in a short time is not realistic in China.Due to urban expansion,approximately 458 Chinese coal-fired power plants(CFPPs)are now located in cities.Limited by space,urban CFUs face difficulty in becoming equipped with carbon capture and storage systems.This presents a sizeable challenge for the low-carbon transition of urban CFPPs and carbon neutral processes.Here,we present a ready-to-implement method to reduce the carbon emission of CFPPs in limited space:roof photovoltaic-assisted power generation combined with sludge cocombustion for coal-fired power generation systems(PVSCs).We also consider nonurban CFPPs with the method of roof photovoltaic-assisted power generation(PVs)only.Based on remaining life cycle analysis,we find that the PVSCs could save 28.47 Mt of coal,reduce CO_(2)emissions by 69.76 Mt,treat 125.70 Mt of sludge,and also generate 12.08 billion RMB worth of electricity revenue per year.In addition,our scenario analysis shows that PVSCs are more profitable when choosing an urban CFU with a remaining life of more than 12 years and while the sludge treatment subsidy is set at 100 RMB t1.Under strict and lenient CFU decommissioning policies,CFUs with a remaining life of between 19 and 30 years and between 13 and 24 years should be selected for PVs,respectively.Thus,we conclude that PVSCs can not only generate economic benefits but also facilitate carbon reduction and solid waste treatment. 展开更多
关键词 Roof photovoltaic Sludge co-combustion CFPPs Decarbonization optimal emission target selection
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部