Collisions between a moving mass and an anti-collision device increase structural responses and threaten structural safety.An active mass damper(AMD)with stroke limitations is often used to avoid collisions.However,a ...Collisions between a moving mass and an anti-collision device increase structural responses and threaten structural safety.An active mass damper(AMD)with stroke limitations is often used to avoid collisions.However,a strokelimited AMD control system with a fixed limited area shortens the available AMD stroke and leads to significant control power.To solve this problem,the design approach with variable gain and limited area(VGLA)is proposed in this study.First,the boundary of variable-limited areas is calculated based on the real-time status of the moving mass.The variable gain(VG)expression at the variable limited area is deduced by considering the saturation of AMD stroke.Then,numerical simulations of a stroke-limited AMD control system with VGLA are conducted on a high-rise building structure.These numerical simulations show that the proposed approach has superior strokelimitation performance compared with a stroke-limited AMD control system with a fixed limited area.Finally,the proposed approach is validated through experiments on a four-story steel frame.展开更多
To enable the experimental assessment of the seismic performance of full-scale nonstructural elements with multiple engineering parameters(EDPs),a three-layer testbed named Nonstructural Element Simulator on Shake Tab...To enable the experimental assessment of the seismic performance of full-scale nonstructural elements with multiple engineering parameters(EDPs),a three-layer testbed named Nonstructural Element Simulator on Shake Table(NEST)has been developed.The testbed consists of three consecutive floors of steel structure.The bottom two floors provide a space to accommodate a full-scale room.To fully explore the flexibility of NEST,we propose a novel control strategy to generate the required shake table input time histories for the testbed to track the target floor motions of the buildings of interest with high accuracy.The control strategy contains two parts:an inverse dynamic compensation via simulation of feedback control systems(IDCS)algorithm and an offline iteration procedure based on a refined nonlinear numerical model of the testbed.The key aspects of the control strategy were introduced in this paper.Experimental tests were conducted to simulate the seismic responses of a full-scale office room on the 21^(st)floor of a 42-story high-rise building.The test results show that the proposed control strategy can reproduce the target floor motions of the building of interest with less than 20%errors within the specified frequency range.展开更多
With the development of economy and society and the growth of population,the high-rise and multi-function of commercial buildings have become an international trend.But it also poses huge fire hazards.Most of the exis...With the development of economy and society and the growth of population,the high-rise and multi-function of commercial buildings have become an international trend.But it also poses huge fire hazards.Most of the existing studies’research objects are predominantly high-rise residential buildings,without considering the impact of different functional zones(Standard floor,entertainment zone,office zone,equipment room and so on)and personnel distribution of commercial buildings evacuation.And the influence of using elevators to carry evacuees on the refuge floor on personnel evacuation is rarely studied.In this work,the fire scenario of the Yangtze River InternationalConferenceCenter,a high-rise commercial building,is simulated with the Pyrosim programto get the necessary parameters under various fire scenarios and to calculate the available evacuation time TASET.At the same time,according to the complex functional zone of the commercial high-rise building and the distribution of people in different time periods,a reasonable evacuation strategy is developed and simulated by Pathfinder software.The results indicate that unorganized evacuation will lead individuals to take the erroneous evacuation route,resulting in a vast region of congestion;comprehensive consideration of the time staggering and the reasonable distribution of evacuation routes can significantly improve evacuation efficiency,and the TRSET of night and working hours is 36.6%–55.3%and 49.9%–79.6%of unorganized evacuation,respectively.For the night fire,60%of the people use elevator-refuge floor to evacuate is the optimal strategy;for the fire during working hours,half of the people on standard floors use the elevator to evacuate and people on multifunctional floors evacuate in four batches is the best plan.The results of this study can provide viable solutions and a foundation for analyzing the fire evacuation and safety of big commercial high-rise buildings.展开更多
The sol-gel method is used to prepare a new nano-alumina aerogel structure and the thermal properties of this nanomaterial are investigated comprehensively using electron microscope scanning,thermal analysis,X-ray and...The sol-gel method is used to prepare a new nano-alumina aerogel structure and the thermal properties of this nanomaterial are investigated comprehensively using electron microscope scanning,thermal analysis,X-ray and infrared spectrometer analysis methods.It is found that the composite aerogel alumina material has a multi-level porous nano-network structure.When employed for the thermal insulation of high-rise buildings,the alumina nanocomposite aerogel material can lead to effective energy savings in winter.However,it has almost no energy-saving effect on buildings where energy is consumed for cooling in summer.展开更多
A probabilistic seismic loss assessment of RC high-rise(RCHR)buildings designed according to Eurocode 8 and located in the Southern Euro-Mediterranean zone is presented herein.The loss assessment methodology is based ...A probabilistic seismic loss assessment of RC high-rise(RCHR)buildings designed according to Eurocode 8 and located in the Southern Euro-Mediterranean zone is presented herein.The loss assessment methodology is based on a comprehensive simulation approach which takes into account ground motion(GM)uncertainty,and the random effects in seismic demand,as well as in predicting the damage states(DSs).The methodology is implemented on three RCHR buildings of 20-story,30-story and 40-story with a core wall structural system.The loss functions described by a cumulative lognormal probability distribution are obtained for two intensity levels for a large set of simulations(NLTHAs)based on 60 GM records with a wide range of magnitude(M),distance to source(R)and different site soil conditions(SS).The losses expressed in percent of building replacement cost for RCHR buildings are obtained.In the estimation of losses,both structural(S)and nonstructural(NS)damage for four DSs are considered.The effect of different GM characteristics(M,R and SS)on the obtained losses are investigated.Finally,the estimated performance of the RCHR buildings are checked to ensure that they fulfill limit state requirements according to Eurocode 8.展开更多
Cost overrun is a common problem in construction projects worldwide.Most Indian construction projects,particularly those involving high-rise buildings,have had severe cost overruns.For managers,architects,engineers,an...Cost overrun is a common problem in construction projects worldwide.Most Indian construction projects,particularly those involving high-rise buildings,have had severe cost overruns.For managers,architects,engineers,and contractors,completing building projects within the specified cost budget has become the most important and hard assignment.Since it is common for high-rise building projects to go over budget,the aim of this study is to find out the causes of cost overruns and provide effective measures.The study found 70 cost overrun factors based on a comprehensive literature review and expert opinions.A Google form questionnaire was distributed to 150 construction professionals across India.After following up,101 of the 150 responses were received.A five-point Likert scale was used and the acquired data was analyzed and ranked using the Relative Importance Index(RII)technique.According to the findings of RII,the top ten critical factors influencing cost overruns were frequent change orders during construction by the owner,delay in construction,escalation of material prices,market inflation or deflation,rework,frequent changes in design,inaccurate evaluation of the project timeline,unforeseen ground condition,inaccurate quantity take-off,and delay in progressive payment by the owner.Spearman’s rank correlation test revealed that there is a very significant relationship between the rankings of factors provided by the owner,the consultant,and the contractor.In addition,a factor analysis tool in the SPSS software was also used to categorize the seventy factors into sixteen core components.The top ten critical factors were presented to subject matter experts,and their suggestions were being compiled.These results are expected to help construction professionals minimize cost overruns,improve cost control measures,and initiate future research.展开更多
Reponses of structures subjected to severe earthquakes sometimes significantly surpass what was considered in the design.It is important to investigate the failure mechanism and collapse margin of structures beyond de...Reponses of structures subjected to severe earthquakes sometimes significantly surpass what was considered in the design.It is important to investigate the failure mechanism and collapse margin of structures beyond design,especially for high-rise buildings.In this study,steel high-rise buildings using either square concrete-filled-tube(CFT) columns or steel tube columns are designed.A detailed three-dimensional(3 D) structural model is developed to analyze the seismic behavior of a steel high-rise towards a complete collapse.The effectiveness is verified by both component tests and a full-scale shaking table test.The collapse margin,which is defined as the ratio of PGA between the collapse level to the design major earthquake level(Level 2),is quantified by a series of numerical simulations using incremental dynamic analyses(IDA).The baseline building using CFT columns collapsed with a weak first story mechanism and presented a collapse margin ranging from 10 to 20.The significant variation in the collapse margin was caused by the different characteristics of the input ground motions.The building using equivalent steel columns collapsed earlier due to the significant shortening of the locally buckled columns,exhibiting only 57% of the collapse margin of the baseline building.The influence of reducing the height of the first story was quite significant.The shortened first story not only enlarged the collapse margin by 20%,but also changed the collapse mode.展开更多
Spectrum characteristics of different types of seismic waves and dynamic response characteristics of super high-rise building structures under long-period ground motions were comparatively analyzed. First, the ground ...Spectrum characteristics of different types of seismic waves and dynamic response characteristics of super high-rise building structures under long-period ground motions were comparatively analyzed. First, the ground response wave (named LS-R wave) of a soft soil site with deep deposit, taking long-period bedrock seismic record as input, was calculated by wave propagation method. After that, a TOMAKOMAI station long-period seismic record from the Tokachi-Oki earthquake and conventional E1-Centro wave were also chosen. Spectrum characteristics of these waves were analyzed and compared. Then, a series of shaking table tests were performed on a 1:50 scale super high-rise structural model under these seismic waves. Furthermore, numerical simulation of the prototype structure under these excitations was conducted, and structure damages under different intensive ground motions were discussed. The results show that: 1) Spectrum characteristics of ground response wave are significantly influenced by soft soil site with deep deposit, and the predominant period has an increasing trend. 2) The maximum acceleration amplification factor of the structure under the TOM wave is two times that under the E1-Centro wave; while the maximum displacement response of the structure under the TOM wave is 4.4 times that under the E1-Centro wave. Long-period ground motions show greater influences on displacement responses than acceleration responses for super high-rise building structures. 3) Most inelastic damage occurs at the upper 1/3 part of the super high-rise building when subjected to long-period ground motions.展开更多
Since serious fire occurred frequently in recent years, fire safety of high-rise building has attracted extensive attention. A National Basic Research Program (973 program) of China has been set up by Ministry of Sc...Since serious fire occurred frequently in recent years, fire safety of high-rise building has attracted extensive attention. A National Basic Research Program (973 program) of China has been set up by Ministry of Science and Technology (MOST) of China in 2012 to meet the research requirements of fire safety in high-rise buildings. This paper reviews the current state of art of research on fire dynamics of high-rise buildings, including the up-to-date progress of this project. The following three subjects on fire dynamics of high-rise buildings are addressed in this review: the ejected flame and fire plume behavior over facade out of the compartment window, the flame spread behavior over facade thermal insulation materiMs, and the buoyancy-driven smoke transportation characteristics along long vertical channels in high-rise buildings. Prospective future works are discussed and summarized.展开更多
For super high-rise buildings, the vibration period of the basic mode is several seconds, and it is very close to the period of the fluctuating wind. The damping of super high-rise buildings is low, so super high-rise...For super high-rise buildings, the vibration period of the basic mode is several seconds, and it is very close to the period of the fluctuating wind. The damping of super high-rise buildings is low, so super high-rise buildings are very sensitive to fluctuating wind. The wind load is one of the key loads in the design of super high-rise buildings. It is known that only the basic mode is needed in the wind-response analysis of tall buildings. However, for super high-rise buildings, especially for the acceleration response, because of the frequency amplification of the high modes, the high modes and the mode coupling may need to be considered. Three typical super high-rise projects with the SMPSS in wind tunnel tests and the random vibration theory method were used to analyze the effect of high modes on the wind-induced response. The conclusions can be drawn as follows. First, for the displacement response, the basic mode is dominant, and the high modes can be neglected. Second, for the acceleration response, the high modes and the mode coupling should be considered. Lastly, the strain energy of modes can only give the vibration energy distribution of the high-rise building, and it cannot describe the local wind-induced vibration of high-rise buildings, especially for the top acceleration response.展开更多
This paper based on Reynolds-averaged Navier-Stokes equations standard ?model [1];the surface pressure on the wind field around two adjacent high-rise buildings was numerically simulated with software Fluent. The resu...This paper based on Reynolds-averaged Navier-Stokes equations standard ?model [1];the surface pressure on the wind field around two adjacent high-rise buildings was numerically simulated with software Fluent. The results show that with the influence of adjacent high-rise building, numerical simulation is a good way to study the wind field around high-rise building and the distribution of wind pressure on building’ surface. The pressures on the windward surface are positive with the maximum at 2/3 H height and have lower values on the top and bottom. The pressures on the leeward surface and two sides were negative. Due to the serious flow separation at the corner of building’s windward, the wind field has a high turbulent kinetic energy.展开更多
The design code for each country is revised and updated based on an expected zone’s seismic intensities,geotechnical site classifications,structural systems,construction materials and methods of construction in order...The design code for each country is revised and updated based on an expected zone’s seismic intensities,geotechnical site classifications,structural systems,construction materials and methods of construction in order to provide more realistic considerations of seismic demand,seismic response,and seismic capacity.Based on the aforementioned provisions,structures designed according to different seismic codes may yield different performances for the same level of hazard.This study aims to investigate and compare the induced responses related to the earthquake-resistant design of reinforced concrete(RC)buildings according to the Saudi building code(SBC-301),American code(ASCE-7),uniform building code(UBC-97),and European code(EC-8).In order to account for the provision regarding the hazard specification and its effect on the induced seismic responses,four regions in the Kingdom of Saudi Arabia with different seismic levels are selected.The code provisions related to the specification of site classification and its effect on the induced design base shear are investigated as well.Significant differences are observed in the induced responses with the variation in seismic design codes for the considered seismic hazards and site classifications.展开更多
As a type of nonstructural component, infill walls play a significant role in the seismic behavior of high-rise buildings. However, the stiffness of the infill wall is generally either ignored or considered by simplif...As a type of nonstructural component, infill walls play a significant role in the seismic behavior of high-rise buildings. However, the stiffness of the infill wall is generally either ignored or considered by simplified empirical criteria that lead to a period shortening. The difference can be greatly decreased by using a structural identification methodology. In this study, an ambient vibration test was performed on four on-site reinforced concrete high-rise buildings, and the design results were compared with the PKPM models using corresponding finite element(FE) models. A diagonal strut model was used to simulate the behavior of the infill wall, and the identified modal parameters measured from the on-site test were employed to calibrate the parameters of the diagonal strut in the FE models. The SAP2000 models with calibrated elastic modulus were used to evaluate the seismic response in the elastic state. Based on the load-displacement relationship of the infill wall, nonlinear dynamic analysis models were built in PERFORM-3 D and calibrated using the measured modal periods. The analysis results revealed that the structural performance under small/large earthquake records were both strengthened by infill walls, and the contribution of infill walls should be considered for better accuracy in the design process.展开更多
The pressurization smoke control system has been commonly used as a smoke control system at the emergency stairs of high-rise buildings. However, a higher possibility of overpressure between the lobby and the accommod...The pressurization smoke control system has been commonly used as a smoke control system at the emergency stairs of high-rise buildings. However, a higher possibility of overpressure between the lobby and the accommodation or pressure drop in the lobby could lead to failure in achievement of the purpose of pressurization system, particularly when supplying the leakage and supplementary air flow through one air-supply path at a time. To improve this particular issue, the devise configurations, as well as the different ways to supply the leakage and supplementary air flow through the different flow passages have been proposed. The performance of the trial product was evaluated on the test bed, ultimately providing a safe evacuation environment if high-rise buildings fired.展开更多
With rapid economic and social development in China, high-rise buildings have continuously sprung up since 2006. However, several big fire accidents in high-rise buildings such as the Beijing Television Cultural Cente...With rapid economic and social development in China, high-rise buildings have continuously sprung up since 2006. However, several big fire accidents in high-rise buildings such as the Beijing Television Cultural Center fire in 2009 and the Shanghai Jing'an District fire in 2010 etc. have claimed people's lives and caused huge amounts of economic and property losses,展开更多
Facing the contradiction of water scarcity and water wastage in most cities of China, this study aims at probing into the factors influencing water-use efficiency and assessing water-saving potential by adopting press...Facing the contradiction of water scarcity and water wastage in most cities of China, this study aims at probing into the factors influencing water-use efficiency and assessing water-saving potential by adopting pressure control measures based on field survey conducted in 23 high-rise buildings in Suqian, China and laboratory tests. Results showed that per capita water consumption (PCWC) exceeding water consumption norms is common in these buildings. The hourly water consumption variation law is quite different among different types of buildings. These differences should be considered in designing building water supply systems to lower water and energy consumption. On the basis of correlation analysis, the order of factors influencing the PCWC follows average tap water pressure, percapita building area, and building age, suggesting pressure management in high-rise buildings is a key water-saving measure. Field tests of outflow characteristics under different water pressures indicated that over-pressure outflow (OPO) is a common cause of water wastage in buildings, however, no branch pipe pressure control measures were found in all the surveyed buildings. Laboratory tests showed that branch pipe pressure-reducing measures can lower water consumption and improve the comfortability of use as well. Therefore, in addition to applying high efficiency water-saving devices, we strongly recommend that branch pipe pressure-reducing measures should be strictly implemented in designing new building water supply systems and reconstruction of existing old building water supply systems, thereby, promoting water, energy saving and development of green building.展开更多
This study aims to propose a method for quantitatively evaluating the influence which the obstruction of sea breezes by clusters of high-rise buildings has on the urban heat island effect using a weather simulation mo...This study aims to propose a method for quantitatively evaluating the influence which the obstruction of sea breezes by clusters of high-rise buildings has on the urban heat island effect using a weather simulation model and Geographic Information Systems (GIS). Specifically, a method of evaluating the influence of the obstruction of sea breeze by high-rise buildings on the urban heat island effect was proposed. In the method, two scenarios that imagine urban forms which differ with regard to whether or not they contain high-rise buildings are created and weather simulation is conducted, and the results of the simulations are comparatively analyzed focusing on temperature and wind speed. Evaluation was conducted in two stages, and Shiodome of Minato City in the Tokyo Metropolis was selected as the region for evaluation. In two stages of evaluation, a rise in temperature of approximately 0.3 K and a reduction in wind speed of approximately 1 m/s were observed in a region approximately five to ten kilometers square downwind of high-rise buildings in the period 6 PM to 9 PM, and a higher temperature caused by the obstruction of sea breeze by high-rise buildings was identified. The fact that such a higher temperature was confirmed in the time period from 6 PM onwards, in which the temperature decreases, reveals that obstruction of sea breeze by high-rise buildings dulls the decrease in temperature which occurs from evening onwards, and influences nighttime urban heat island formation.展开更多
The development of the construction sector is rapidly growing,which induce competition at global level.In order to achieve the current economic development,more high-rise buildings construction projects were commenced...The development of the construction sector is rapidly growing,which induce competition at global level.In order to achieve the current economic development,more high-rise buildings construction projects were commenced without considering importance of the land to human and other living organism.On the other hand,the quality and safety aspect of the engineering technology used must be analyzed carefully and to be the primary aim for engineers to reduce any risk of harm in future.Many of the high-rise buildings in China consist of a frame or skeleton of reinforced concrete wall which need to be strengthened with shear walls to improve the stability and safety of the structures.According to practical work experience and relevant theoretical knowledge,the researcher introduced the reinforcement construction technology of frame-shear wall for high-rise buildings in depth from aspects like the arrangement of steel bar,construction preparation,steel bar anchorage,precautions to follow for the related work in future.展开更多
In recent years with the increasing number of super high-rise buildings and the ever-expanding scale the anti-smoke construction technology has attracted more and more attention.Based on this situation,this paper anal...In recent years with the increasing number of super high-rise buildings and the ever-expanding scale the anti-smoke construction technology has attracted more and more attention.Based on this situation,this paper analyzes the smoke control technology of super high-rise buildings.The paper analyzes the importance of the application of anti-smoke construction technology in super high-rise buildings,analyzes the problems in the construction of smoke control and super high-rise buildings.The anti-smoke construction technology was studied and I hope that it can benefit the application of anti-smoke construction technology in high-rise buildings.展开更多
In the analysis and research of few cases on the characteristics of vertical"burning"and spreading of fire in high-rise buildings in China and overseas,the mechanism of vertical spreading of fire along exter...In the analysis and research of few cases on the characteristics of vertical"burning"and spreading of fire in high-rise buildings in China and overseas,the mechanism of vertical spreading of fire along external wall is caused by hot pressing and wind pressure existing in high-rise buildings.The use of external wall combustible materials and near-window combustible items resulted in the formation of high temperature pyrotechnics and the burning of the external wall.Besides,due to the lack of fire-fighting measurements in high-rise building,it is recommended that the external wall of the high-rise building should be equipped with vertical fire-proof partitioning and non-combustible materials by setting up an automatic fire-fighting water curtain system along the vertical section of the external wall and above the indoor window.Therefore,the automatic sprinkler can be set up to prevent the fire from spreading vertically along the external wall of the building effectively.展开更多
基金This research was founded by the Funds for Creative Research Groups of National Natural Science Foundation of China(Grant No.51921006)the National Natural Science Foundations of China(Grant No.51978224)+2 种基金the National Major Scientific Research Instrument Development Program of China(Grant No.51827811)the National Natural Science Foundation of China,(Grant No.52008141)the Shenzhen Technology Innovation Program(Grant Nos.JCYJ20170811160003571,JCYJ20180508152238111 and JCYJ20200109112803851).
文摘Collisions between a moving mass and an anti-collision device increase structural responses and threaten structural safety.An active mass damper(AMD)with stroke limitations is often used to avoid collisions.However,a strokelimited AMD control system with a fixed limited area shortens the available AMD stroke and leads to significant control power.To solve this problem,the design approach with variable gain and limited area(VGLA)is proposed in this study.First,the boundary of variable-limited areas is calculated based on the real-time status of the moving mass.The variable gain(VG)expression at the variable limited area is deduced by considering the saturation of AMD stroke.Then,numerical simulations of a stroke-limited AMD control system with VGLA are conducted on a high-rise building structure.These numerical simulations show that the proposed approach has superior strokelimitation performance compared with a stroke-limited AMD control system with a fixed limited area.Finally,the proposed approach is validated through experiments on a four-story steel frame.
基金supported by the Natural Science Foundation of China(52122811)。
文摘To enable the experimental assessment of the seismic performance of full-scale nonstructural elements with multiple engineering parameters(EDPs),a three-layer testbed named Nonstructural Element Simulator on Shake Table(NEST)has been developed.The testbed consists of three consecutive floors of steel structure.The bottom two floors provide a space to accommodate a full-scale room.To fully explore the flexibility of NEST,we propose a novel control strategy to generate the required shake table input time histories for the testbed to track the target floor motions of the buildings of interest with high accuracy.The control strategy contains two parts:an inverse dynamic compensation via simulation of feedback control systems(IDCS)algorithm and an offline iteration procedure based on a refined nonlinear numerical model of the testbed.The key aspects of the control strategy were introduced in this paper.Experimental tests were conducted to simulate the seismic responses of a full-scale office room on the 21^(st)floor of a 42-story high-rise building.The test results show that the proposed control strategy can reproduce the target floor motions of the building of interest with less than 20%errors within the specified frequency range.
基金the grant fromthe Key Technologies Research and Development Program(Grant No.2021YFF0602005)the National Natural Science Foundation of China(No.51678135)the Fundamental Research Funds for the Central Universities(Nos.2242022k30031,2242022k30033).
文摘With the development of economy and society and the growth of population,the high-rise and multi-function of commercial buildings have become an international trend.But it also poses huge fire hazards.Most of the existing studies’research objects are predominantly high-rise residential buildings,without considering the impact of different functional zones(Standard floor,entertainment zone,office zone,equipment room and so on)and personnel distribution of commercial buildings evacuation.And the influence of using elevators to carry evacuees on the refuge floor on personnel evacuation is rarely studied.In this work,the fire scenario of the Yangtze River InternationalConferenceCenter,a high-rise commercial building,is simulated with the Pyrosim programto get the necessary parameters under various fire scenarios and to calculate the available evacuation time TASET.At the same time,according to the complex functional zone of the commercial high-rise building and the distribution of people in different time periods,a reasonable evacuation strategy is developed and simulated by Pathfinder software.The results indicate that unorganized evacuation will lead individuals to take the erroneous evacuation route,resulting in a vast region of congestion;comprehensive consideration of the time staggering and the reasonable distribution of evacuation routes can significantly improve evacuation efficiency,and the TRSET of night and working hours is 36.6%–55.3%and 49.9%–79.6%of unorganized evacuation,respectively.For the night fire,60%of the people use elevator-refuge floor to evacuate is the optimal strategy;for the fire during working hours,half of the people on standard floors use the elevator to evacuate and people on multifunctional floors evacuate in four batches is the best plan.The results of this study can provide viable solutions and a foundation for analyzing the fire evacuation and safety of big commercial high-rise buildings.
文摘The sol-gel method is used to prepare a new nano-alumina aerogel structure and the thermal properties of this nanomaterial are investigated comprehensively using electron microscope scanning,thermal analysis,X-ray and infrared spectrometer analysis methods.It is found that the composite aerogel alumina material has a multi-level porous nano-network structure.When employed for the thermal insulation of high-rise buildings,the alumina nanocomposite aerogel material can lead to effective energy savings in winter.However,it has almost no energy-saving effect on buildings where energy is consumed for cooling in summer.
文摘A probabilistic seismic loss assessment of RC high-rise(RCHR)buildings designed according to Eurocode 8 and located in the Southern Euro-Mediterranean zone is presented herein.The loss assessment methodology is based on a comprehensive simulation approach which takes into account ground motion(GM)uncertainty,and the random effects in seismic demand,as well as in predicting the damage states(DSs).The methodology is implemented on three RCHR buildings of 20-story,30-story and 40-story with a core wall structural system.The loss functions described by a cumulative lognormal probability distribution are obtained for two intensity levels for a large set of simulations(NLTHAs)based on 60 GM records with a wide range of magnitude(M),distance to source(R)and different site soil conditions(SS).The losses expressed in percent of building replacement cost for RCHR buildings are obtained.In the estimation of losses,both structural(S)and nonstructural(NS)damage for four DSs are considered.The effect of different GM characteristics(M,R and SS)on the obtained losses are investigated.Finally,the estimated performance of the RCHR buildings are checked to ensure that they fulfill limit state requirements according to Eurocode 8.
文摘Cost overrun is a common problem in construction projects worldwide.Most Indian construction projects,particularly those involving high-rise buildings,have had severe cost overruns.For managers,architects,engineers,and contractors,completing building projects within the specified cost budget has become the most important and hard assignment.Since it is common for high-rise building projects to go over budget,the aim of this study is to find out the causes of cost overruns and provide effective measures.The study found 70 cost overrun factors based on a comprehensive literature review and expert opinions.A Google form questionnaire was distributed to 150 construction professionals across India.After following up,101 of the 150 responses were received.A five-point Likert scale was used and the acquired data was analyzed and ranked using the Relative Importance Index(RII)technique.According to the findings of RII,the top ten critical factors influencing cost overruns were frequent change orders during construction by the owner,delay in construction,escalation of material prices,market inflation or deflation,rework,frequent changes in design,inaccurate evaluation of the project timeline,unforeseen ground condition,inaccurate quantity take-off,and delay in progressive payment by the owner.Spearman’s rank correlation test revealed that there is a very significant relationship between the rankings of factors provided by the owner,the consultant,and the contractor.In addition,a factor analysis tool in the SPSS software was also used to categorize the seventy factors into sixteen core components.The top ten critical factors were presented to subject matter experts,and their suggestions were being compiled.These results are expected to help construction professionals minimize cost overruns,improve cost control measures,and initiate future research.
基金Heilongjiang Province Application Technology Research and Development under Grant No.GX16C007National Key Research and Development Program of China under Grant No.2017YFC1500605
文摘Reponses of structures subjected to severe earthquakes sometimes significantly surpass what was considered in the design.It is important to investigate the failure mechanism and collapse margin of structures beyond design,especially for high-rise buildings.In this study,steel high-rise buildings using either square concrete-filled-tube(CFT) columns or steel tube columns are designed.A detailed three-dimensional(3 D) structural model is developed to analyze the seismic behavior of a steel high-rise towards a complete collapse.The effectiveness is verified by both component tests and a full-scale shaking table test.The collapse margin,which is defined as the ratio of PGA between the collapse level to the design major earthquake level(Level 2),is quantified by a series of numerical simulations using incremental dynamic analyses(IDA).The baseline building using CFT columns collapsed with a weak first story mechanism and presented a collapse margin ranging from 10 to 20.The significant variation in the collapse margin was caused by the different characteristics of the input ground motions.The building using equivalent steel columns collapsed earlier due to the significant shortening of the locally buckled columns,exhibiting only 57% of the collapse margin of the baseline building.The influence of reducing the height of the first story was quite significant.The shortened first story not only enlarged the collapse margin by 20%,but also changed the collapse mode.
基金Project(50978198) supported by the National Natural Science Foundation of ChinaProject(SLDRCE08-B-03) supported by the Ministry of Science and Technology of China
文摘Spectrum characteristics of different types of seismic waves and dynamic response characteristics of super high-rise building structures under long-period ground motions were comparatively analyzed. First, the ground response wave (named LS-R wave) of a soft soil site with deep deposit, taking long-period bedrock seismic record as input, was calculated by wave propagation method. After that, a TOMAKOMAI station long-period seismic record from the Tokachi-Oki earthquake and conventional E1-Centro wave were also chosen. Spectrum characteristics of these waves were analyzed and compared. Then, a series of shaking table tests were performed on a 1:50 scale super high-rise structural model under these seismic waves. Furthermore, numerical simulation of the prototype structure under these excitations was conducted, and structure damages under different intensive ground motions were discussed. The results show that: 1) Spectrum characteristics of ground response wave are significantly influenced by soft soil site with deep deposit, and the predominant period has an increasing trend. 2) The maximum acceleration amplification factor of the structure under the TOM wave is two times that under the E1-Centro wave; while the maximum displacement response of the structure under the TOM wave is 4.4 times that under the E1-Centro wave. Long-period ground motions show greater influences on displacement responses than acceleration responses for super high-rise building structures. 3) Most inelastic damage occurs at the upper 1/3 part of the super high-rise building when subjected to long-period ground motions.
基金supported by National Basic Research Program of China (2012CB719702)
文摘Since serious fire occurred frequently in recent years, fire safety of high-rise building has attracted extensive attention. A National Basic Research Program (973 program) of China has been set up by Ministry of Science and Technology (MOST) of China in 2012 to meet the research requirements of fire safety in high-rise buildings. This paper reviews the current state of art of research on fire dynamics of high-rise buildings, including the up-to-date progress of this project. The following three subjects on fire dynamics of high-rise buildings are addressed in this review: the ejected flame and fire plume behavior over facade out of the compartment window, the flame spread behavior over facade thermal insulation materiMs, and the buoyancy-driven smoke transportation characteristics along long vertical channels in high-rise buildings. Prospective future works are discussed and summarized.
基金National Natural Science Foundation of China Under Grant No.50908044 Jiangsu Provincial Natural Science Foundation of China Under Grant No.SBK201123270 a Project Funded by the Priority Academic Program Development of Jiangsu Higher Education Institutions and StateKey Lab of Subtropical Building Science,South China University of Technology Under Grant No.2011KA05
文摘For super high-rise buildings, the vibration period of the basic mode is several seconds, and it is very close to the period of the fluctuating wind. The damping of super high-rise buildings is low, so super high-rise buildings are very sensitive to fluctuating wind. The wind load is one of the key loads in the design of super high-rise buildings. It is known that only the basic mode is needed in the wind-response analysis of tall buildings. However, for super high-rise buildings, especially for the acceleration response, because of the frequency amplification of the high modes, the high modes and the mode coupling may need to be considered. Three typical super high-rise projects with the SMPSS in wind tunnel tests and the random vibration theory method were used to analyze the effect of high modes on the wind-induced response. The conclusions can be drawn as follows. First, for the displacement response, the basic mode is dominant, and the high modes can be neglected. Second, for the acceleration response, the high modes and the mode coupling should be considered. Lastly, the strain energy of modes can only give the vibration energy distribution of the high-rise building, and it cannot describe the local wind-induced vibration of high-rise buildings, especially for the top acceleration response.
文摘This paper based on Reynolds-averaged Navier-Stokes equations standard ?model [1];the surface pressure on the wind field around two adjacent high-rise buildings was numerically simulated with software Fluent. The results show that with the influence of adjacent high-rise building, numerical simulation is a good way to study the wind field around high-rise building and the distribution of wind pressure on building’ surface. The pressures on the windward surface are positive with the maximum at 2/3 H height and have lower values on the top and bottom. The pressures on the leeward surface and two sides were negative. Due to the serious flow separation at the corner of building’s windward, the wind field has a high turbulent kinetic energy.
文摘The design code for each country is revised and updated based on an expected zone’s seismic intensities,geotechnical site classifications,structural systems,construction materials and methods of construction in order to provide more realistic considerations of seismic demand,seismic response,and seismic capacity.Based on the aforementioned provisions,structures designed according to different seismic codes may yield different performances for the same level of hazard.This study aims to investigate and compare the induced responses related to the earthquake-resistant design of reinforced concrete(RC)buildings according to the Saudi building code(SBC-301),American code(ASCE-7),uniform building code(UBC-97),and European code(EC-8).In order to account for the provision regarding the hazard specification and its effect on the induced seismic responses,four regions in the Kingdom of Saudi Arabia with different seismic levels are selected.The code provisions related to the specification of site classification and its effect on the induced design base shear are investigated as well.Significant differences are observed in the induced responses with the variation in seismic design codes for the considered seismic hazards and site classifications.
基金Supported by:National Key Research and Development Program of China under Grant Nos.2016YFC0701400 and 2016YFC0701308the Key Research and Development Program of Hunan Province under Grant No.2017SK2220the National Natural Science Foundation of China(NSFC)under Grant No.51878264
文摘As a type of nonstructural component, infill walls play a significant role in the seismic behavior of high-rise buildings. However, the stiffness of the infill wall is generally either ignored or considered by simplified empirical criteria that lead to a period shortening. The difference can be greatly decreased by using a structural identification methodology. In this study, an ambient vibration test was performed on four on-site reinforced concrete high-rise buildings, and the design results were compared with the PKPM models using corresponding finite element(FE) models. A diagonal strut model was used to simulate the behavior of the infill wall, and the identified modal parameters measured from the on-site test were employed to calibrate the parameters of the diagonal strut in the FE models. The SAP2000 models with calibrated elastic modulus were used to evaluate the seismic response in the elastic state. Based on the load-displacement relationship of the infill wall, nonlinear dynamic analysis models were built in PERFORM-3 D and calibrated using the measured modal periods. The analysis results revealed that the structural performance under small/large earthquake records were both strengthened by infill walls, and the contribution of infill walls should be considered for better accuracy in the design process.
文摘The pressurization smoke control system has been commonly used as a smoke control system at the emergency stairs of high-rise buildings. However, a higher possibility of overpressure between the lobby and the accommodation or pressure drop in the lobby could lead to failure in achievement of the purpose of pressurization system, particularly when supplying the leakage and supplementary air flow through one air-supply path at a time. To improve this particular issue, the devise configurations, as well as the different ways to supply the leakage and supplementary air flow through the different flow passages have been proposed. The performance of the trial product was evaluated on the test bed, ultimately providing a safe evacuation environment if high-rise buildings fired.
文摘With rapid economic and social development in China, high-rise buildings have continuously sprung up since 2006. However, several big fire accidents in high-rise buildings such as the Beijing Television Cultural Center fire in 2009 and the Shanghai Jing'an District fire in 2010 etc. have claimed people's lives and caused huge amounts of economic and property losses,
文摘Facing the contradiction of water scarcity and water wastage in most cities of China, this study aims at probing into the factors influencing water-use efficiency and assessing water-saving potential by adopting pressure control measures based on field survey conducted in 23 high-rise buildings in Suqian, China and laboratory tests. Results showed that per capita water consumption (PCWC) exceeding water consumption norms is common in these buildings. The hourly water consumption variation law is quite different among different types of buildings. These differences should be considered in designing building water supply systems to lower water and energy consumption. On the basis of correlation analysis, the order of factors influencing the PCWC follows average tap water pressure, percapita building area, and building age, suggesting pressure management in high-rise buildings is a key water-saving measure. Field tests of outflow characteristics under different water pressures indicated that over-pressure outflow (OPO) is a common cause of water wastage in buildings, however, no branch pipe pressure control measures were found in all the surveyed buildings. Laboratory tests showed that branch pipe pressure-reducing measures can lower water consumption and improve the comfortability of use as well. Therefore, in addition to applying high efficiency water-saving devices, we strongly recommend that branch pipe pressure-reducing measures should be strictly implemented in designing new building water supply systems and reconstruction of existing old building water supply systems, thereby, promoting water, energy saving and development of green building.
文摘This study aims to propose a method for quantitatively evaluating the influence which the obstruction of sea breezes by clusters of high-rise buildings has on the urban heat island effect using a weather simulation model and Geographic Information Systems (GIS). Specifically, a method of evaluating the influence of the obstruction of sea breeze by high-rise buildings on the urban heat island effect was proposed. In the method, two scenarios that imagine urban forms which differ with regard to whether or not they contain high-rise buildings are created and weather simulation is conducted, and the results of the simulations are comparatively analyzed focusing on temperature and wind speed. Evaluation was conducted in two stages, and Shiodome of Minato City in the Tokyo Metropolis was selected as the region for evaluation. In two stages of evaluation, a rise in temperature of approximately 0.3 K and a reduction in wind speed of approximately 1 m/s were observed in a region approximately five to ten kilometers square downwind of high-rise buildings in the period 6 PM to 9 PM, and a higher temperature caused by the obstruction of sea breeze by high-rise buildings was identified. The fact that such a higher temperature was confirmed in the time period from 6 PM onwards, in which the temperature decreases, reveals that obstruction of sea breeze by high-rise buildings dulls the decrease in temperature which occurs from evening onwards, and influences nighttime urban heat island formation.
文摘The development of the construction sector is rapidly growing,which induce competition at global level.In order to achieve the current economic development,more high-rise buildings construction projects were commenced without considering importance of the land to human and other living organism.On the other hand,the quality and safety aspect of the engineering technology used must be analyzed carefully and to be the primary aim for engineers to reduce any risk of harm in future.Many of the high-rise buildings in China consist of a frame or skeleton of reinforced concrete wall which need to be strengthened with shear walls to improve the stability and safety of the structures.According to practical work experience and relevant theoretical knowledge,the researcher introduced the reinforcement construction technology of frame-shear wall for high-rise buildings in depth from aspects like the arrangement of steel bar,construction preparation,steel bar anchorage,precautions to follow for the related work in future.
文摘In recent years with the increasing number of super high-rise buildings and the ever-expanding scale the anti-smoke construction technology has attracted more and more attention.Based on this situation,this paper analyzes the smoke control technology of super high-rise buildings.The paper analyzes the importance of the application of anti-smoke construction technology in super high-rise buildings,analyzes the problems in the construction of smoke control and super high-rise buildings.The anti-smoke construction technology was studied and I hope that it can benefit the application of anti-smoke construction technology in high-rise buildings.
文摘In the analysis and research of few cases on the characteristics of vertical"burning"and spreading of fire in high-rise buildings in China and overseas,the mechanism of vertical spreading of fire along external wall is caused by hot pressing and wind pressure existing in high-rise buildings.The use of external wall combustible materials and near-window combustible items resulted in the formation of high temperature pyrotechnics and the burning of the external wall.Besides,due to the lack of fire-fighting measurements in high-rise building,it is recommended that the external wall of the high-rise building should be equipped with vertical fire-proof partitioning and non-combustible materials by setting up an automatic fire-fighting water curtain system along the vertical section of the external wall and above the indoor window.Therefore,the automatic sprinkler can be set up to prevent the fire from spreading vertically along the external wall of the building effectively.