期刊文献+
共找到3,492篇文章
< 1 2 175 >
每页显示 20 50 100
Whole-Process Project Cost Management Based on Building Information Modeling (BIM)
1
作者 Liping Yan 《Journal of Architectural Research and Development》 2024年第4期57-62,共6页
The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the a... The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry. 展开更多
关键词 building Information Modeling(BIM) project cost management Data integration Information sharing Cost control
下载PDF
Simple and fast prediction of train-induced track forces,ground and building vibrations 被引量:1
2
作者 Lutz Auersch 《Railway Engineering Science》 2020年第3期232-250,共19页
A simple and fast prediction scheme is presented for train-induced ground and building vibrations.Simple models such as(one-dimensional)transfer matrices are used for the vehicle–track–soil interaction and for the b... A simple and fast prediction scheme is presented for train-induced ground and building vibrations.Simple models such as(one-dimensional)transfer matrices are used for the vehicle–track–soil interaction and for the building–soil interaction.The wave propagation through layered soils is approximated by a frequency-dependent homogeneous half-space.The prediction is divided into the parts“emission”(excitation by railway traffic),“transmission”(wave propagation through the soil)and“immission”(transfer into a building).The link between the modules is made by the excitation force between emission and transmission,and by the free-field vibration between transmission and immission.All formula for the simple vehicle–track,soil and building models are given in this article.The behaviour of the models is demonstrated by typical examples,including the mitigation of train vibrations by elastic track elements,the low-and high-frequency cut-offs characteristic for layered soils,and the interacting soil,wall and floor resonances of multi-storey buildings.It is shown that the results of the simple prediction models can well represent the behaviour of the more time-consuming detailed models,the finite-element boundary-element models of the track,the wavenumber integrals for the soil and the three-dimensional finite-element models of the building.In addition,measurement examples are given for each part of the prediction,confirming that the methods provide reasonable results.As the prediction models are fast in calculation,many predictions can be done,for example to assess the environmental effect along a new railway line.The simple models have the additional advantage that the user needs to know only a minimum of parameters.So,the prediction is fast and user-friendly,but also theoretically and experimentally well-founded. 展开更多
关键词 Railway-induced vibration Ground vibration Layered soil building response Excitation forces track and vehicle irregularities
下载PDF
Analysis of Budget and Cost Control of New Green Building Projects
3
作者 Liu Jing Wang Pengfei +1 位作者 Li Tao Ma Guiquan 《Journal of Architectural Research and Development》 2018年第4期35-38,共4页
With the increment of public awareness toward ecological environment protection,green building has gradually become an integral part of construction development.Green building refers to a form of architecture that con... With the increment of public awareness toward ecological environment protection,green building has gradually become an integral part of construction development.Green building refers to a form of architecture that conforms to the current social development form and meets the requisites of energy conservation and environmental protection.The budget and cost control of green building construction project play very important roles in improving the quality of the construction and reducing the cost of the project.This paper mainly analyzes the problems and control measures in the new green building engineering budget and cost control. 展开更多
关键词 NEW green building project COST BUDGET COST control
下载PDF
Building the Three Gorges Project for the Chinese Nation—An Interview with General Manager Lu Youmei, China Yangtze River Three Gorges Project Development Corporation
4
《China's Foreign Trade》 1994年第2期25-25,共1页
The Yangtze River has nurtured the fertile land on both its banks and hundreds of millions of Chinese people. but its raging waters have also wreaked havoc on the people living in its reaches. Since the founding of Ne... The Yangtze River has nurtured the fertile land on both its banks and hundreds of millions of Chinese people. but its raging waters have also wreaked havoc on the people living in its reaches. Since the founding of New China, large-scale surveys, planning, scientific research and feasibility studies have been carried out in an effort to harness the 展开更多
关键词 project China Yangtze River Three Gorges project Development Corporation An Interview with General Manager Lu Youmei building the Three Gorges project for the Chinese Nation
下载PDF
Inter-Organizational Conflict (IOC) in Building Refurbishment Projects;an Exploratory Factor Analysis (EFA) approach
5
作者 Adel Noori Nazanin Nafisi +1 位作者 Mohamadreza Mokariantabari 《Journal of Construction Research》 2020年第1期29-36,共8页
Over the past years,there has been an expanding intrigued in building refurbishment projects because of the alter in financial conditions and the accentuation on sustainable development.Increasing demand for building ... Over the past years,there has been an expanding intrigued in building refurbishment projects because of the alter in financial conditions and the accentuation on sustainable development.Increasing demand for building refurbishment projects will lead to an increase in organizational interactions in the construction works as building refurbishment works involve interactions among many different organizations and it can cause Inter-Organizational conflict(IOC)among organizations involved in projects.This paper adopted an Exploratory Factor Analysis(EFA)approach to analyses IOC in building refurbishment projects.For this study,a fivepoint Likert Scale was adopted to ensure the instruments of the study are reliable.The researcher ultimately sent questionnaires as a web-link and email invitation to 1050 construction firms and 733 architectural firms.The questionnaire sent to managers and professionals from construction and architectural firms in Malaysia.Finally,one-hundred-seventy-nine(179)refurbishment projects formed a database for this paper.The finding of this paper shows the IOC factors that contribute to the improve the performance of building refurbishment project can be conflict during the construction stage,conflict between the client and the consultant,task expectations,basic responsibilities,final duration,project’s goals,conflict between the client and the contractor,final cost,final quality,standards of behaviors,conflict between the contractor and the consultant,interference and conflict during the design stage. 展开更多
关键词 building refurbishment project Inter-Organizational Conflict(IOC) UNCERTAINTY Exploratory Factor Analysis(EFA) Existing building
下载PDF
基于Microsoft Project的建筑施工项目管理分析
6
作者 杨盛华 《中国厨卫》 2024年第7期82-84,共3页
在当前社会经济快速发展的情况下,建设工程数量不断增加,而传统的手工记录方式已经无法满足现代建设工程的需求。因此,采用先进的计算机技术来辅助建筑施工项目管理已成为当今建筑业发展的趋势。Microsoft Project作为一种专业的项目管... 在当前社会经济快速发展的情况下,建设工程数量不断增加,而传统的手工记录方式已经无法满足现代建设工程的需求。因此,采用先进的计算机技术来辅助建筑施工项目管理已成为当今建筑业发展的趋势。Microsoft Project作为一种专业的项目管理软件,具有良好的数据存储和可视化展示功能,可以有效地提高建筑施工项目的质量和效率。文章分析了如何利用Microsoft Project软件进行建筑施工项目管理,并对该方法的应用效果进行评估,以期为今后的建筑施工项目管理提供参考价值。 展开更多
关键词 Microsoft project 建筑施工 项目管理
下载PDF
Key State Projects in the Building Materials Industry
7
《China's Foreign Trade》 1998年第2期16-16,共1页
关键词 Key State projects in the building Materials Industry
下载PDF
The Contributions of Building Information Modelling to Sustainable Construction
8
作者 Sahar Soltani 《World Journal of Engineering and Technology》 2016年第2期193-199,共7页
Global concerns toward environmental issues have induced growing demand for new approaches in the construction because of its considerable impact on the environment and use of natural resources. Through using construc... Global concerns toward environmental issues have induced growing demand for new approaches in the construction because of its considerable impact on the environment and use of natural resources. Through using construction sustainability tools, methods and techniques, a greener design can be applied during various building phases. In this connection, it is argued that the analytical and integrated models applied by Building Information Modelling (BIM) may also facilitate this process to be performed more efficiently. BIM and construction sustainability are quite different initiatives, but both have received much attention in recent years in the architecture, engineering and construction (AEC) industry. A rigorous analysis of the interactions between them implies that a synergy exists which, if properly it is understood that can be helpful to reduce the environmental impacts of the AEC industry. A BIM-based design model can contribute to sustainability through its three main dimensions which are environmental, economic and social. In this paper, by reviewing the existing literature on BIM and construction sustainability and using a matrix to analyze construction sustainability dimensions and BIM functionalities a number of interactions have been discussed. It can be concluded that despite there are many improvements in implementation of BIM in environmental and economic aspects of sustainability, its potential impact on social dimension has not been explicitly explored hence further studies need to be undertaken in this area. 展开更多
关键词 Sustainable Construction building Information Modelling BIM Design for Quality project Management
下载PDF
Agricultural Changes in Xinjiang in the Sixth Year of Guangxu s Reign from the Perspective of the Monument for Building Qarqi Canal
9
作者 Danyang GONG 《Asian Agricultural Research》 2022年第12期57-59,共3页
The Monument for Building Qarqi Canal was inscribed in the sixth year of Guangxu s reign in the Qing Dynasty(1880).This inscription made a detailed record of the event when the Qing army expelled the invading army of ... The Monument for Building Qarqi Canal was inscribed in the sixth year of Guangxu s reign in the Qing Dynasty(1880).This inscription made a detailed record of the event when the Qing army expelled the invading army of Mohammad Yaqub Beg,whenever the Qing army regained a place,it immediately started recruiting exiled people,restoring agriculture,building water conservancy and did other rehabilitation works.The army of the Qing Dynasty successively established rehabilitation bureaus in various parts of southern Xinjiang to be responsible for the rehabilitation works.These once again set off a climax in the development of water conservancy in multi-ethnic areas in Xinjiang,and laid the foundation for the rapid development of agricultural development and water conservancy in Xinjiang during the Guangxu s reign in the Qing Dynasty. 展开更多
关键词 Monument for building Qarqi Canal Guangxu s reign in the Qing Dynasty Appeasing refugees Restoring agriculture building water conservancy projects
下载PDF
Proposal to build Gongboxia Hydropower Station Project has been approved
10
《Electricity》 2001年第1期51-51,共1页
关键词 project Proposal to build Gongboxia Hydropower Station project has been approved
下载PDF
Impact of Risk on Performance of Design and Build Projects in Lagos State, Nigeria
11
作者 Ajayi Oluwaseyi Modupe Ogunsanmi Olabode Emmanuel +1 位作者 Salako Olukemi Agnes Mafimidiwo Bamidele Ayodele 《Journal of Civil Engineering and Architecture》 2012年第9期1210-1217,共8页
关键词 风险设计 设计性能 尼日利亚 利益相关者 采购方式 产品质量 从业人员 统计软件包
下载PDF
Building-integrated renewable energy policy analysis in China
12
作者 姚春妮 郝斌 《Journal of Central South University》 SCIE EI CAS 2009年第S1期209-213,共5页
With the dramatic development of renewable energy all over the world,and for purpose of adjusting energy structure,the Ministry of Construction of China plans to promote the large scale application of renewable energy... With the dramatic development of renewable energy all over the world,and for purpose of adjusting energy structure,the Ministry of Construction of China plans to promote the large scale application of renewable energy in buildings. In order to ensure the validity of policy-making,this work firstly exerts a method to do cost-benefit analysis for three kinds of technologies such as building-integrated solar hot water (BISHW) system,building-integrated photovoltaic (BIPV) technology and ground water heat pump (GWHP). Through selecting a representative city of every climate region,the analysis comes into different results for different climate regions in China and respectively different suggestion for policy-making. On the analysis basis,the Ministry of Construction (MOC) and the Ministry of Finance of China (MOF) united to start-up Building-integrated Renewable Energy Demonstration Projects (BIREDP) in 2006. In the demonstration projects,renewable energy takes place of traditional energy to supply the domestic hot water,electricity,air-conditioning and heating. Through carrying out the demonstration projects,renewable energy related market has been expanded. More and more relative companies and local governments take the opportunity to promote the large scale application of renewable energy in buildings. 展开更多
关键词 building-integrated RENEWABLE Energy Policy COST-BENEFIT analysis DEMONSTRATION projectS
下载PDF
An object tracking and global localization method using the cylindrical projection of omnidirectional image
13
作者 孙英杰 曹其新 洪炳熔 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2004年第5期474-480,共7页
We present an omnidirectional vision system we have implemented to provide our mobile robot with a fast tracking and robust localization capability. An algorithm is proposed to do reconstruction of the environment fro... We present an omnidirectional vision system we have implemented to provide our mobile robot with a fast tracking and robust localization capability. An algorithm is proposed to do reconstruction of the environment from the omnidirectional image and global localization of the robot in the context of the Middle Size League RoboCup field. This is accomplished by learning a set of visual landmarks such as the goals and the corner posts. Due to the dynamic changing environment and the partially observable landmarks, four localization cases are discussed in order to get robust localization performance. Localization is performed using a method that matches the observed landmarks, i.e. color blobs, which are extracted from the environment. The advantages of the cylindrical projection are discussed giving special consideration to the characteristics of the visual landmark and the meaning of the blob extraction. The analysis is established based on real time experiments with our omnidirectional vision system and the actual mobile robot. The comparative studies are presented and the feasibility of the method is shown. 展开更多
关键词 移动式机器人 全程视觉系统 柱面圆柱投影 目标跟踪 全球定位 全程图像 粗程序
下载PDF
Analysis and Comparison of Electric Drive System Projects of Military Tracked Vehicles
14
作者 廖自力 马晓军 +1 位作者 赵玉慧 臧克茂 《Defence Technology(防务技术)》 SCIE EI CAS 2007年第2期81-85,共5页
The electric drive system characteristics of different projects for tracked vehicles are analyzed.For the two most typical projects,the parameters of power,torque and rotating speed and others of drive motor are figur... The electric drive system characteristics of different projects for tracked vehicles are analyzed.For the two most typical projects,the parameters of power,torque and rotating speed and others of drive motor are figured out under the condition of satisfying adequate steering performance of the tracked vehicles.General opinions on the two projects are brought forward and conclusions are drawn. 展开更多
关键词 机械工程 轨道 装甲车 汽车工程
下载PDF
Demonstration of the Nearly Zero Energy Building Concept
15
作者 Marjana Sijanec Zavrl Gasper Stegnar Henrik Gjerkes 《Journal of Geoscience and Environment Protection》 2015年第6期45-54,共10页
Nearly zero energy buildings (nZEB) will become an obligatory energy efficiency standard in Europe. Following to common guidelines in European legislation, the countries investigated technical and economic framework f... Nearly zero energy buildings (nZEB) will become an obligatory energy efficiency standard in Europe. Following to common guidelines in European legislation, the countries investigated technical and economic framework for the preparation of detailed national technical definition of nZEB. Slovenia accepted the nZEB criteria in early 2015. This paper describes the technical and economic background for identification of economically viable concepts of highly energy efficient apartment building. The highrise demonstration building Eco Silver House revealed that meeting nZEB standards was not an easy task, not so much for technical reasons, but mostly due to the processes, inadequate skills, not fully compliant regulation and insufficient possibilities for interaction between the building and energy networks. Analysis of cost effectiveness showed that the Eco Silver House fulfilled minimal requirements of cost-optimal for apartment building with Net Present Value of 272 EUR/m2 and Primary energy use of 79 kWh/ m2?a in line with the Slovenian national cost optimal study of minimum energy performance requirements from the year 2014. At the time, the requirement of 50% share of renewables in final energy use is not fulfilled, but will be easily reached when EU2020 energy efficiency targets set in the Slovenian Energy Act regarding the RES share in district heating systems and public power grid will be gradually implemented. The demonstration project FP7 EE-HIGHRISE confirms that in spite of the barriers, the nZEB minimum requirements defined on profound theoretical studies can be met in practice. 展开更多
关键词 Nearly Zero Energy building Demonstration project Cost-Optimal Highrise
下载PDF
Analysis of Causes of Delay in Middle and High Income Self-Build Housing Projects (SBHPs) in Wa, Ghana
16
作者 Samuel Owusu Afram Anthony Bangdome-Dery +1 位作者 Genevieve Ekua Eghan Titus Ebenezer Kwofie 《Journal of Building Construction and Planning Research》 2015年第4期171-179,共9页
Self-build housing projects (SBHPs) among middle and high income developers are faced with many challenges that cause delay in the delivery time of the house(s). The focus of this paper is to analyse the factors that ... Self-build housing projects (SBHPs) among middle and high income developers are faced with many challenges that cause delay in the delivery time of the house(s). The focus of this paper is to analyse the factors that cause delay in SBHPs in order to identify the critical delay factors. Review of literature and expert input revealed 20 variables which were used in a structured questionnaire for data collection from owners, consultants and builders in Wa Municipality. Reliability test, t-test analysis and mean ranking were used in the data analysis. The results revealed that “Delay in obtaining permit from Local Authorities” was the first delay factor followed by “Poor site management and supervision”. The delay factor ranked least was “Inadequate cost estimation and related details” from consultants. The paper recommends that Government agencies that regulate physical development should intensify public education, particularly on responsibilities and obligations, especially among self-builders. The paper recommends further study into labour-related issues as well as communication and information management among participants and its impact on self-build project success. 展开更多
关键词 DELAYS Self-build HOUSING projectS Ghana
下载PDF
Building for the Future
17
作者 Liu Wei 《ChinAfrica》 2012年第2期14-15,共2页
ASCHELEW Tdsse, an Ethiopian construction contractor, is looking up at a new 20-story building with pride. The recently completed structure is now home base for the African Union (AU). Tdsse has worked on its constr... ASCHELEW Tdsse, an Ethiopian construction contractor, is looking up at a new 20-story building with pride. The recently completed structure is now home base for the African Union (AU). Tdsse has worked on its construction in Addis Ababa since 2009. 展开更多
关键词 building for the Future project
下载PDF
Comparison of Energy Consumption of the 12 Classroom Typical School Buildings in Selected 4 City in Turkey
18
作者 Demet SARAC Zulkuf GUNELI 《Journal of Architectural Research and Development》 2019年第6期51-57,共7页
School is a special place where students come together to become productive individuals of society,acquire basic skills and acquire citizenship knowledge.With the introduction of the new education system(4+4+4)in Turk... School is a special place where students come together to become productive individuals of society,acquire basic skills and acquire citizenship knowledge.With the introduction of the new education system(4+4+4)in Turkey in 2012-2013,some difficulties occurred in the spatial structure of the schools.After the new system,increasing number of students and decreasing student requirements have been tried to be solved with temporary solutions.At the same time that millions of students studying in primary schools all over Turkey have the same architectural feature as one type of architectural school project,regardless of the geographical and social situation began to be implemented in all parts of the city.Therefore,the increase in consumption varies depending on the geographical reasons where the type projects are implemented.Selected regions of the four thermal zones in Turkey for this research are provided below:1^st Thermal district in Antalya;2^nd Thermal district in Bursa;3^rd Thermal district in Elaz??;4^th Thermal district in Kars.The calculation of the energy consumption created by the above cities by means of BEP-TR program and comparing classes. 展开更多
关键词 Typical school project Thermal districts Effective energy consumption building energy consumption BEP-TR
下载PDF
Development of Human Resources for GEN (Generation) II1+ New Build Projects
19
作者 Didier Schoevaerts Christian Schoenfelder 《Journal of Energy and Power Engineering》 2013年第9期1786-1794,共9页
关键词 人力资源开发 项目开发 核电站 建设项目 新建项目 协调方法 III 供应商
下载PDF
基于发包人视角的政府投资项目工程总承包投资管控研究
20
作者 殷晓敏 刘金灿 《建筑经济》 2024年第2期89-96,共8页
政府投资项目作为我国推行工程总承包的主要项目类型,加强投资控制是规范合理使用财政资金的必然要求。根据标准合同条件,对设计施工总承包模式下政府投资项目的计量计价规则进行具体设定。在分析其投资运行及关键问题的基础上,采用合... 政府投资项目作为我国推行工程总承包的主要项目类型,加强投资控制是规范合理使用财政资金的必然要求。根据标准合同条件,对设计施工总承包模式下政府投资项目的计量计价规则进行具体设定。在分析其投资运行及关键问题的基础上,采用合同状态分析方法,解析优化设计和设计优化两种典型情形下承包人的逐利行为,并提出制约承包人潜在违约机会主义行为,引导承包人由字面履约行为向尽善履约行为转变的对策建议。研究成果将为发包人进一步加强投资管控,引导承包人改善履约绩效,提供理论指导和策略靶向。 展开更多
关键词 工程总承包 设计施工总承包 政府投资项目 投资管控
下载PDF
上一页 1 2 175 下一页 到第
使用帮助 返回顶部