It is well known that the overbreak caused by the blasting damage during tunnel excavation increases costs associated with filling the collapsed area with shotcrete and results in filing of a claim by the contractor. ...It is well known that the overbreak caused by the blasting damage during tunnel excavation increases costs associated with filling the collapsed area with shotcrete and results in filing of a claim by the contractor. This paper outlines a new approach for prediction the overbreak depth during tunnel construction. Hence, firstly excavation damage zone(EDZ) are determined by average specific charge in each zone. Numerical modelling is used to simulate the EDZ around tunnel boundary and the overbreak depth are calculated by the rock strength factor. The predicted overbreak depth compared with observed field data from a case study. The results show that there exists an approximately up to 40% difference between the prediction and the observed volume of overbreak depth. Therefore, the method can be well used to predict the overbreak depth to estimate more precision of shotcrete and concrete volumes in tunnelling cost during design phase.展开更多
In order to increase the safety of working environment and decrease the unwanted costs related to overbreak in tunnel excavation projects, it is necessary to minimize overbreak percentage. Thus, based on regression an...In order to increase the safety of working environment and decrease the unwanted costs related to overbreak in tunnel excavation projects, it is necessary to minimize overbreak percentage. Thus, based on regression analysis and fuzzy inference system, this paper tries to develop predictive models to estimate overbreak caused by blasting at the Alborz Tunnel. To develop the models, 202 datasets were utilized, out of which 182 were used for constructing the models. To validate and compare the obtained results,determination coefficient(R2) and root mean square error(RMSE) indexes were chosen. For the fuzzy model, R2 and RMSE are equal to 0.96 and 0.55 respectively, whereas for regression model, they are 0.41 and 1.75 respectively, proving that the fuzzy predictor performs, significantly, better than the statistical method. Using the developed fuzzy model, the percentage of overbreak was minimized in the Alborz Tunnel.展开更多
Overbreak and underbreak are the crucial problems during the blasting excavation of underground tunnels owing to their effects on the construction costs and operational safety.A critical challenge facing overbreak and...Overbreak and underbreak are the crucial problems during the blasting excavation of underground tunnels owing to their effects on the construction costs and operational safety.A critical challenge facing overbreak and underbreak control is the difficulty in developing guidelines with respect to various and complex engineering conditions.In this study,a series of field measurements of overbreak and underbreak using the Focus^(S)150 laser scanner were performed in a deep roadway of the Kaiyang phosphate mine,China.The distri-bution and extent of the overbreak and underbreak surrounding the roadway contour were accurately analyzed in accordance with the collected point cloud data.Subsequently,a simplified three-dimensional model was established to simulate the blasting excavation of pre-stressed roadway using the explicit dynamic analysis code LS-DYNA.A comparison of numerical and measurement results revealed that the proposed model was a reliable tool to simulate the overbreak and underbreak induced by blasting excavation.Thereafter,the influ-ences of uncontrollable geological factors such as in situ stress conditions and controllable blasting factors including contour hole spac-ing(S),charge concentration(b)and decoupled coefficient(f)as well as stemming were further numerically investigated.The simulation results indicated that the lateral pressure coefficient significantly affected the distribution pattern of the overbreak and underbreak,while the stress magnitude contributed to their extents.Moreover,a comparison of the simulation findings and the field measurement data indicated that the minimal extents of the overbreak and underbreak corresponding the optimal contour blasting results were obtained at S=0.70 m,b=0.9 kg/m and f=2.5,respectively.Furthermore,the contour blastholes stemmed with sand created smaller damage to the periphery rock mass of roadway and enhanced the utilization efficiency of explosive energy.The research findings of this study pro-vide important implications for similar blasting excavation projects.展开更多
文摘It is well known that the overbreak caused by the blasting damage during tunnel excavation increases costs associated with filling the collapsed area with shotcrete and results in filing of a claim by the contractor. This paper outlines a new approach for prediction the overbreak depth during tunnel construction. Hence, firstly excavation damage zone(EDZ) are determined by average specific charge in each zone. Numerical modelling is used to simulate the EDZ around tunnel boundary and the overbreak depth are calculated by the rock strength factor. The predicted overbreak depth compared with observed field data from a case study. The results show that there exists an approximately up to 40% difference between the prediction and the observed volume of overbreak depth. Therefore, the method can be well used to predict the overbreak depth to estimate more precision of shotcrete and concrete volumes in tunnelling cost during design phase.
文摘In order to increase the safety of working environment and decrease the unwanted costs related to overbreak in tunnel excavation projects, it is necessary to minimize overbreak percentage. Thus, based on regression analysis and fuzzy inference system, this paper tries to develop predictive models to estimate overbreak caused by blasting at the Alborz Tunnel. To develop the models, 202 datasets were utilized, out of which 182 were used for constructing the models. To validate and compare the obtained results,determination coefficient(R2) and root mean square error(RMSE) indexes were chosen. For the fuzzy model, R2 and RMSE are equal to 0.96 and 0.55 respectively, whereas for regression model, they are 0.41 and 1.75 respectively, proving that the fuzzy predictor performs, significantly, better than the statistical method. Using the developed fuzzy model, the percentage of overbreak was minimized in the Alborz Tunnel.
基金the National Natural Science Foundation of China(Grant Nos.11772357,12072376)the Fundamental Research Funds for the Central Universities of Central South University(Grant No.2021XQLH053).
文摘Overbreak and underbreak are the crucial problems during the blasting excavation of underground tunnels owing to their effects on the construction costs and operational safety.A critical challenge facing overbreak and underbreak control is the difficulty in developing guidelines with respect to various and complex engineering conditions.In this study,a series of field measurements of overbreak and underbreak using the Focus^(S)150 laser scanner were performed in a deep roadway of the Kaiyang phosphate mine,China.The distri-bution and extent of the overbreak and underbreak surrounding the roadway contour were accurately analyzed in accordance with the collected point cloud data.Subsequently,a simplified three-dimensional model was established to simulate the blasting excavation of pre-stressed roadway using the explicit dynamic analysis code LS-DYNA.A comparison of numerical and measurement results revealed that the proposed model was a reliable tool to simulate the overbreak and underbreak induced by blasting excavation.Thereafter,the influ-ences of uncontrollable geological factors such as in situ stress conditions and controllable blasting factors including contour hole spac-ing(S),charge concentration(b)and decoupled coefficient(f)as well as stemming were further numerically investigated.The simulation results indicated that the lateral pressure coefficient significantly affected the distribution pattern of the overbreak and underbreak,while the stress magnitude contributed to their extents.Moreover,a comparison of the simulation findings and the field measurement data indicated that the minimal extents of the overbreak and underbreak corresponding the optimal contour blasting results were obtained at S=0.70 m,b=0.9 kg/m and f=2.5,respectively.Furthermore,the contour blastholes stemmed with sand created smaller damage to the periphery rock mass of roadway and enhanced the utilization efficiency of explosive energy.The research findings of this study pro-vide important implications for similar blasting excavation projects.