Cost overrun is a common problem in construction projects worldwide.Most Indian construction projects,particularly those involving high-rise buildings,have had severe cost overruns.For managers,architects,engineers,an...Cost overrun is a common problem in construction projects worldwide.Most Indian construction projects,particularly those involving high-rise buildings,have had severe cost overruns.For managers,architects,engineers,and contractors,completing building projects within the specified cost budget has become the most important and hard assignment.Since it is common for high-rise building projects to go over budget,the aim of this study is to find out the causes of cost overruns and provide effective measures.The study found 70 cost overrun factors based on a comprehensive literature review and expert opinions.A Google form questionnaire was distributed to 150 construction professionals across India.After following up,101 of the 150 responses were received.A five-point Likert scale was used and the acquired data was analyzed and ranked using the Relative Importance Index(RII)technique.According to the findings of RII,the top ten critical factors influencing cost overruns were frequent change orders during construction by the owner,delay in construction,escalation of material prices,market inflation or deflation,rework,frequent changes in design,inaccurate evaluation of the project timeline,unforeseen ground condition,inaccurate quantity take-off,and delay in progressive payment by the owner.Spearman’s rank correlation test revealed that there is a very significant relationship between the rankings of factors provided by the owner,the consultant,and the contractor.In addition,a factor analysis tool in the SPSS software was also used to categorize the seventy factors into sixteen core components.The top ten critical factors were presented to subject matter experts,and their suggestions were being compiled.These results are expected to help construction professionals minimize cost overruns,improve cost control measures,and initiate future research.展开更多
The effects of contact surface on dynamic wedging behavior of the roller and inner-ring of the overrunning clutch in a dual-turbine torque converter were investigated to reveal the friction self-locking mechanism and ...The effects of contact surface on dynamic wedging behavior of the roller and inner-ring of the overrunning clutch in a dual-turbine torque converter were investigated to reveal the friction self-locking mechanism and dynamic process.Planar strain clutch models including roller,inner-ring and outer-ring were built,and transient wedging process was analyzed with an explicit dynamics method.The modeling of stress and strain distribution and variation of two kinds of contact surfaces show that there are three stages named slipping,wedging and binding respectively during whole wedging process.Meanwhile the geometric structures of contact surfaces greatly influence the peak stress and strain distribution of the wedging process of the roller and inner-ring.The load bearing performance of contact surfaces with logarithmic spiral curve is better than that with straight line.Our study provides theoretical foundation for design and further optimization of wedging contact surface of an overrunning clutch in a dual-turbine hydrodynamic torque converter.展开更多
The effect of using camel milk with 2 dates types (Sokary & Al-Khalas), in 3 forms (paste, pieces, and molasses), with 2 different concentrations (5% & 10%) in the manufacturing of ice cream on its viscosity, ...The effect of using camel milk with 2 dates types (Sokary & Al-Khalas), in 3 forms (paste, pieces, and molasses), with 2 different concentrations (5% & 10%) in the manufacturing of ice cream on its viscosity, overrun%, rheological and melting properties during storage period up to 60 days at -18°C was studied. It was noticed that there are higher mean of viscosity values (cp) when using “Al-khalas” dates paste 5% and 10% followed by samples with “sokary” paste then samples with molasses in ice cream samples compared to those with added date’s pieces of either “Sokary” or “Al-khalas”. There are significant differences of overrun values between all treatments and samples with the added date paste of either “sokary” or “Al-khalas” which recorded the lowest values. Increased melting resistance and good qualities as heat shock and melting properties were significantly better for the samples with added dates pieces or paste unlike the molasses. The storage effect is obvious decline, especially when using dates molasses.展开更多
Cost and time overrun are the key troubles of any improvement ventures. These troubles are inflicting the terrible end result in the development of kingdom monetary improvement and thriving. To overcome these problems...Cost and time overrun are the key troubles of any improvement ventures. These troubles are inflicting the terrible end result in the development of kingdom monetary improvement and thriving. To overcome these problems, the?paper examines predominant impact on elements causing the mission postponement and cost. A poll review was led for the situation study embracing various information-gathering procedures. The discoveries from the contextual investigation uncovered that the most persuasive factors in Malaysia:?1) contractor’s inappropriate arranging, 2) poor site the board, 3) deficient contractual worker experience,?are the most powerful factors. This paper has likewise broken down the normal and least effective of the postpone variables causing task deferral and cost overrun in Malaysia. It likewise infers that there are various measures as per the idea of deferring components to decrease the effect on task postponement and cost overruns in the development industry.?There are significant factors in the control of time overrun that would be actual thought related to know and tackle in great impact to improvement rate which may additionally no capacity that be recovered. Thirty (30) massive development extensions in Malaysia were exceptional coping with time overrun at some stage in development. Out of 30 undertakings, 17 (56.67%) ventures had been introduced by using 1100 days’ time overrun, 5 (16.67%) extensions in the middle of a hundred and one to 200 days, 5 (16.67%) ventures?201 to 300 days while three (10%) ventures have been deferred for timeframe over 300 days.展开更多
Recently, the highway construction projects increase rapidly in Vietnam and most of them are international contracting projects. It results serious negative influence on the local government and enterprises that the c...Recently, the highway construction projects increase rapidly in Vietnam and most of them are international contracting projects. It results serious negative influence on the local government and enterprises that the common cost overrun of projects, and the risk factors of it is different in the different countries, different stages and projects types. So in this paper, we generate an evaluation index system of highway construction projects cost overrun risk in Vietnam in the perspective of different project participants, and also evaluate the effects of these factors in method of regression analysis. The empirical results confirmed 7 main factors that have aggravated cost overrun risk in construction stages, e.g. survey and design scheme risk. In final, the corresponding suggestions are proposed to reduce the project cost overrun risk.展开更多
Based on the abort strategy of fixed periods, a novel predictive control scheduling methodology was proposed to efficiently solve overrun problems. By applying the latest control value in the prediction sequences to t...Based on the abort strategy of fixed periods, a novel predictive control scheduling methodology was proposed to efficiently solve overrun problems. By applying the latest control value in the prediction sequences to the control objective, the new strategy was expected to optimize the control system for better performance and yet guarantee the schedulability of all tasks under overrun. The schedulability of the real-time systems with p-period overruns was analyzed, and the corresponding stability criteria was given as well. The simulation results show that the new approach can improve the performance of control system compared to that of conventional abort strategy, it can reduce the overshoot and adjust time as well as ensure the schedulability and stability.展开更多
文摘Cost overrun is a common problem in construction projects worldwide.Most Indian construction projects,particularly those involving high-rise buildings,have had severe cost overruns.For managers,architects,engineers,and contractors,completing building projects within the specified cost budget has become the most important and hard assignment.Since it is common for high-rise building projects to go over budget,the aim of this study is to find out the causes of cost overruns and provide effective measures.The study found 70 cost overrun factors based on a comprehensive literature review and expert opinions.A Google form questionnaire was distributed to 150 construction professionals across India.After following up,101 of the 150 responses were received.A five-point Likert scale was used and the acquired data was analyzed and ranked using the Relative Importance Index(RII)technique.According to the findings of RII,the top ten critical factors influencing cost overruns were frequent change orders during construction by the owner,delay in construction,escalation of material prices,market inflation or deflation,rework,frequent changes in design,inaccurate evaluation of the project timeline,unforeseen ground condition,inaccurate quantity take-off,and delay in progressive payment by the owner.Spearman’s rank correlation test revealed that there is a very significant relationship between the rankings of factors provided by the owner,the consultant,and the contractor.In addition,a factor analysis tool in the SPSS software was also used to categorize the seventy factors into sixteen core components.The top ten critical factors were presented to subject matter experts,and their suggestions were being compiled.These results are expected to help construction professionals minimize cost overruns,improve cost control measures,and initiate future research.
基金Supported by the National Natural Science Foundation of China(51475041)the Ministerial Level Advanced Research Foundation(40402060103)the Ministerial Basic Products Innovation Program(VTDP2104)
文摘The effects of contact surface on dynamic wedging behavior of the roller and inner-ring of the overrunning clutch in a dual-turbine torque converter were investigated to reveal the friction self-locking mechanism and dynamic process.Planar strain clutch models including roller,inner-ring and outer-ring were built,and transient wedging process was analyzed with an explicit dynamics method.The modeling of stress and strain distribution and variation of two kinds of contact surfaces show that there are three stages named slipping,wedging and binding respectively during whole wedging process.Meanwhile the geometric structures of contact surfaces greatly influence the peak stress and strain distribution of the wedging process of the roller and inner-ring.The load bearing performance of contact surfaces with logarithmic spiral curve is better than that with straight line.Our study provides theoretical foundation for design and further optimization of wedging contact surface of an overrunning clutch in a dual-turbine hydrodynamic torque converter.
文摘The effect of using camel milk with 2 dates types (Sokary & Al-Khalas), in 3 forms (paste, pieces, and molasses), with 2 different concentrations (5% & 10%) in the manufacturing of ice cream on its viscosity, overrun%, rheological and melting properties during storage period up to 60 days at -18°C was studied. It was noticed that there are higher mean of viscosity values (cp) when using “Al-khalas” dates paste 5% and 10% followed by samples with “sokary” paste then samples with molasses in ice cream samples compared to those with added date’s pieces of either “Sokary” or “Al-khalas”. There are significant differences of overrun values between all treatments and samples with the added date paste of either “sokary” or “Al-khalas” which recorded the lowest values. Increased melting resistance and good qualities as heat shock and melting properties were significantly better for the samples with added dates pieces or paste unlike the molasses. The storage effect is obvious decline, especially when using dates molasses.
文摘Cost and time overrun are the key troubles of any improvement ventures. These troubles are inflicting the terrible end result in the development of kingdom monetary improvement and thriving. To overcome these problems, the?paper examines predominant impact on elements causing the mission postponement and cost. A poll review was led for the situation study embracing various information-gathering procedures. The discoveries from the contextual investigation uncovered that the most persuasive factors in Malaysia:?1) contractor’s inappropriate arranging, 2) poor site the board, 3) deficient contractual worker experience,?are the most powerful factors. This paper has likewise broken down the normal and least effective of the postpone variables causing task deferral and cost overrun in Malaysia. It likewise infers that there are various measures as per the idea of deferring components to decrease the effect on task postponement and cost overruns in the development industry.?There are significant factors in the control of time overrun that would be actual thought related to know and tackle in great impact to improvement rate which may additionally no capacity that be recovered. Thirty (30) massive development extensions in Malaysia were exceptional coping with time overrun at some stage in development. Out of 30 undertakings, 17 (56.67%) ventures had been introduced by using 1100 days’ time overrun, 5 (16.67%) extensions in the middle of a hundred and one to 200 days, 5 (16.67%) ventures?201 to 300 days while three (10%) ventures have been deferred for timeframe over 300 days.
文摘Recently, the highway construction projects increase rapidly in Vietnam and most of them are international contracting projects. It results serious negative influence on the local government and enterprises that the common cost overrun of projects, and the risk factors of it is different in the different countries, different stages and projects types. So in this paper, we generate an evaluation index system of highway construction projects cost overrun risk in Vietnam in the perspective of different project participants, and also evaluate the effects of these factors in method of regression analysis. The empirical results confirmed 7 main factors that have aggravated cost overrun risk in construction stages, e.g. survey and design scheme risk. In final, the corresponding suggestions are proposed to reduce the project cost overrun risk.
基金Project (60505018) supported by the National Natural Science Foundation of China
文摘Based on the abort strategy of fixed periods, a novel predictive control scheduling methodology was proposed to efficiently solve overrun problems. By applying the latest control value in the prediction sequences to the control objective, the new strategy was expected to optimize the control system for better performance and yet guarantee the schedulability of all tasks under overrun. The schedulability of the real-time systems with p-period overruns was analyzed, and the corresponding stability criteria was given as well. The simulation results show that the new approach can improve the performance of control system compared to that of conventional abort strategy, it can reduce the overshoot and adjust time as well as ensure the schedulability and stability.