The effects of lance height and bottom blown flowrate on the mixed time, the splashing amount, the penetrating depth, and the level fluctuation of an 85 t combined blown converter have been studied using a water model...The effects of lance height and bottom blown flowrate on the mixed time, the splashing amount, the penetrating depth, and the level fluctuation of an 85 t combined blown converter have been studied using a water model. The results show that the maximal stirring energy is provided to the bath at the top lance height of about 50-100 mm. When the top lance height is in the range ofg0- 110 mm, the splashing amount caused by the top jet can reach the maximal value. The appropriate operational parameters of Chongqing Iron and Steel Company (CISC) converter have been established that the top lance height is 1600-1760 mm and the bottom blowing flowrate is 240-480 Nm^3/h in the primary phase of a heat, 1100-1300 mm and 160-200 Nm^3/h in the second phase, and 1040-1120 mm and 200-350 Nm^3/h in the end phase. Also, the trial shows that the metallurgical result of the studied blow pattern is better than that of the former pattern. At the starting 3-4 min of a heat, the strong splashing is eliminated. 2008 University of Science and Technology Beijing. All rights reserved.展开更多
Mathematical model for mass transfer of chemical reactions on the surface of the smelting bath pit in oxygen top blown smelting furnace was put forward. Additionally, one of two mathematical models for mass transfer o...Mathematical model for mass transfer of chemical reactions on the surface of the smelting bath pit in oxygen top blown smelting furnace was put forward. Additionally, one of two mathematical models for mass transfer of chemical reactions forming copper matte in smelting bath and the other for parameters of smelting process were developed. The verification tests were simultaneously carried out in a pilot scale furnace and the experimental results show that these mathematical models are convincing. Thus, these numerical models are reliable to simulate pyritic smelting process for copper nickel mineral in oxygen top blown furnace.展开更多
文摘The effects of lance height and bottom blown flowrate on the mixed time, the splashing amount, the penetrating depth, and the level fluctuation of an 85 t combined blown converter have been studied using a water model. The results show that the maximal stirring energy is provided to the bath at the top lance height of about 50-100 mm. When the top lance height is in the range ofg0- 110 mm, the splashing amount caused by the top jet can reach the maximal value. The appropriate operational parameters of Chongqing Iron and Steel Company (CISC) converter have been established that the top lance height is 1600-1760 mm and the bottom blowing flowrate is 240-480 Nm^3/h in the primary phase of a heat, 1100-1300 mm and 160-200 Nm^3/h in the second phase, and 1040-1120 mm and 200-350 Nm^3/h in the end phase. Also, the trial shows that the metallurgical result of the studied blow pattern is better than that of the former pattern. At the starting 3-4 min of a heat, the strong splashing is eliminated. 2008 University of Science and Technology Beijing. All rights reserved.
文摘Mathematical model for mass transfer of chemical reactions on the surface of the smelting bath pit in oxygen top blown smelting furnace was put forward. Additionally, one of two mathematical models for mass transfer of chemical reactions forming copper matte in smelting bath and the other for parameters of smelting process were developed. The verification tests were simultaneously carried out in a pilot scale furnace and the experimental results show that these mathematical models are convincing. Thus, these numerical models are reliable to simulate pyritic smelting process for copper nickel mineral in oxygen top blown furnace.