Aiming at the safety problem of the stage separation of parallel reusable high-speed air vehicles,this paper studies the unsteady test method and focuses on deriving a similarity law of parallel stage separation free-...Aiming at the safety problem of the stage separation of parallel reusable high-speed air vehicles,this paper studies the unsteady test method and focuses on deriving a similarity law of parallel stage separation free-flight wind tunnel tests.The new similarity law considers the influences of aerodynamic force and gravity on the motions of the two stages,as well as the influence of aerodynamic interference between the two stages on each other’s motion.From the perspective of multiangle physical equations,the conditions to ensure that the two-stage separation trajectory of a wind tunnel test is similar to that of a real air vehicle are derived innovatively,so as to ensure the authenticity and credibility of wind tunnel test results.The similarity law is verified by an HIFiRE-5 air vehicle,and the separation trajectories of wind tunnel tests and the real air vehicle are obtained by numerical simulation.The research shows that the similarity law derived in this paper can ensure that wind tunnel free-flight tests have the ability to predict the two-stage separation characteristics of real parallel vehicles.By analyzing the separation trajectory curve of the typical state,it is found that the new method can ensure that the trajectory error of a wind tunnel test does not exceed 1%,which indicates that this method is credible.The establishment of the new method lays the foundation for subsequent wind tunnel tests and provides support for research on the safety of the stage separation of parallel reusable air vehicles.展开更多
A novel rule-based model for multi-stage multi-product scheduling problem(MMSP)in batch plants with parallel units is proposed.The scheduling problem is decomposed into two sub-problems of order assignment and order s...A novel rule-based model for multi-stage multi-product scheduling problem(MMSP)in batch plants with parallel units is proposed.The scheduling problem is decomposed into two sub-problems of order assignment and order sequencing.Firstly,hierarchical scheduling strategy is presented for solving the former sub-problem,where the multi-stage multi-product batch process is divided into multiple sequentially connected single process stages,and then the production of orders are arranged in each single stage by using forward order assignment strategy and backward order assignment strategy respectively according to the feature of scheduling objective.Line-up competition algorithm(LCA)is presented to find out optimal order sequence and order assignment rule,which can minimize total flow time or maximize total weighted process time.Computational results show that the proposed approach can obtain better solutions than those of the literature for all scheduling problems with more than 10 orders.Moreover,with the problem size increasing,the solutions obtained by the proposed approach are improved remarkably.The proposed approach has the potential to solve large size MMSP.展开更多
基金supported by the National Natural Science Foundation of China(Nos.U21B2054 and 11772317).
文摘Aiming at the safety problem of the stage separation of parallel reusable high-speed air vehicles,this paper studies the unsteady test method and focuses on deriving a similarity law of parallel stage separation free-flight wind tunnel tests.The new similarity law considers the influences of aerodynamic force and gravity on the motions of the two stages,as well as the influence of aerodynamic interference between the two stages on each other’s motion.From the perspective of multiangle physical equations,the conditions to ensure that the two-stage separation trajectory of a wind tunnel test is similar to that of a real air vehicle are derived innovatively,so as to ensure the authenticity and credibility of wind tunnel test results.The similarity law is verified by an HIFiRE-5 air vehicle,and the separation trajectories of wind tunnel tests and the real air vehicle are obtained by numerical simulation.The research shows that the similarity law derived in this paper can ensure that wind tunnel free-flight tests have the ability to predict the two-stage separation characteristics of real parallel vehicles.By analyzing the separation trajectory curve of the typical state,it is found that the new method can ensure that the trajectory error of a wind tunnel test does not exceed 1%,which indicates that this method is credible.The establishment of the new method lays the foundation for subsequent wind tunnel tests and provides support for research on the safety of the stage separation of parallel reusable air vehicles.
基金Supported by the National Natural Science Foundation of China(21376185)
文摘A novel rule-based model for multi-stage multi-product scheduling problem(MMSP)in batch plants with parallel units is proposed.The scheduling problem is decomposed into two sub-problems of order assignment and order sequencing.Firstly,hierarchical scheduling strategy is presented for solving the former sub-problem,where the multi-stage multi-product batch process is divided into multiple sequentially connected single process stages,and then the production of orders are arranged in each single stage by using forward order assignment strategy and backward order assignment strategy respectively according to the feature of scheduling objective.Line-up competition algorithm(LCA)is presented to find out optimal order sequence and order assignment rule,which can minimize total flow time or maximize total weighted process time.Computational results show that the proposed approach can obtain better solutions than those of the literature for all scheduling problems with more than 10 orders.Moreover,with the problem size increasing,the solutions obtained by the proposed approach are improved remarkably.The proposed approach has the potential to solve large size MMSP.