Exergetic Performance Analysis of a Cogeneration Plant at Part Load Operations
1
作者 B.T. Aklilu S.I. Gilani 《Journal of Energy and Power Engineering》 2010年第10期1-8,共8页
A cogeneration plant can run at off-design due to change of load demand or ambient conditions. The cogeneration considered for this study is gas turbine based engine consists of variable stator vanes (VSVs) compress... A cogeneration plant can run at off-design due to change of load demand or ambient conditions. The cogeneration considered for this study is gas turbine based engine consists of variable stator vanes (VSVs) compressor that are re-staggered for loads greater than 50% to maintain the gas turbine exhaust gas temperature at the set value. In order to evaluate the exergetic performance of the cogeneration, exergy model of each cogeneration component is formulated. A 4.2 MW gas turbine based cogeneration plant is analysed for a wide range of part load operations including the effect of VSVs modulation. For loads less than 50%, the major exergy destruction contributors are the combustor and the loss with the stack gas. At full load, the exergy destructions in the combustor, turbine, heat recovery, compressor and the exergy loss with stack gas are 63.7, 14.1, 11.5, 5.7, and 4.9%, respectively. The corresponding first and second law cogeneration efficiencies are 78.5 and 45%, respectively. For comparison purpose both the first and second law efticiencies of each component are represented together. This analysis would help to identify the equipment where the potential for performance improvement is high, and trends which may aid in the design of future plants. 展开更多
关键词 Gas turbine variable stator vanes COGENERATION exergy destruction part load performance.
下载PDF
Off-Design Performance of Gas Turbine Power Units with Alternative Load-Control Strategies
2
作者 Zhiqiang Pan Zhiwen Lin +2 位作者 Kunle Fan Cheng Yang Xiaoqian Ma 《Energy Engineering》 EI 2021年第1期119-141,共23页
Gas turbine power units,as an effective way to cope with the severe challenge of renewable energy accommodation in power grids,arouse the interest of power enterprises in the deep peak-load regulation performance.Two ... Gas turbine power units,as an effective way to cope with the severe challenge of renewable energy accommodation in power grids,arouse the interest of power enterprises in the deep peak-load regulation performance.Two common alternative load-control strategies including constant turbine inlet temperature(TIT)and constant turbine exhaust temperature(TET)regulations were taken into consideration.To comparatively investigate the part-load performance under these strategies,both mathematical and physical models were set up successively to serve as a validation and complementary to each other.For the mathematical model of compressor with inlet guide vane(IGV),combustor and turbine,stage-stacking method based on blade average geometric parameter,energy conservation and turbine stage model were adopted respectively.For the physical model,design and off-design analysis were carried out based on GT PRO and THERMOFLEX respectively.The simulation result of mathematical model validated the reliability of the physical model.Based on this,the influence of ambient temperature and different load-regulating strategies on the off-design performance of gas turbine power units was studied in THERMOFLEX.The results in the case of a PG 9351FA gas turbine show that the ambient temperature has a great impact on system performance,i.e.,every 5℃ increase in the ambient temperature produces a reduction of 3.7%in the relative full-load output and 1.1%in the relative efficiency respectively;when the gas turbine operates under constant TIT strategy,TET starts to rise till it reaches the maximum allowable value with the load rate decreasing,and IGV keeps at the minimum angle with both TIT and TET decreasing when the load rate is lower than 65%;when the gas turbine operates under constant TET strategy,TIT drops slightly at load rate of above 60%while both TIT and TET evidently decrease below 60%load rate operating along the constant corrected speed line at the minimum allowable IGV opening;gas turbine effi-ciency is greatly affected by load rate and the performance degradation is more obvious especially in lower load rate regions;constant TET strategy is superior in the operating efficiency to constant TIT strategy under part-load conditions. 展开更多
关键词 Gas turbine part load performance operating strategy comparative simulation
下载PDF