期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
Dynamic performance of cable-stayed bridge tower with multi-stage pendulum mass damper under wind excitations——I:Theory 被引量:4
1
作者 郭安薪 徐幼麟 李惠 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2007年第3期295-306,共12页
In this paper, wind-induced vibration control of a single column tower of a cable-stayed bridge with a multi- stage pendulum mass damper (MSPMD) is investigated. Special attention is given to overcoming space limita... In this paper, wind-induced vibration control of a single column tower of a cable-stayed bridge with a multi- stage pendulum mass damper (MSPMD) is investigated. Special attention is given to overcoming space limitations for installing the control device in the tower and the effect of varying natural frequency of the towers during construction. First, the finite element model of the bridge during its construction and the basic equation of motion of the MSPMD are introduced. The equation of motion of the bridge with the MSPMD under along-wind excitation is then established. Finally, a numerical simulation and parametric study are conducted to assess the effectiveness of the control system for reducing the wind-induced vibration of the bridge towers during construction. The numerical simulation results show that the MSPMD is practical and effective for reducing the along-wind response of the single column tower, can be installed in a small area of the tower, and complies with the time-variant characteristics of the bridge during its entire construction stage. 展开更多
关键词 multi-stage pendulum mass damper cable-stayed bridge single column tower wind-induced vibration
下载PDF
Dynamic performance of cable-stayed bridge tower with multi-stage pendulum mass damper under wind excitations—Ⅱ: Experiment 被引量:2
2
作者 郭安薪 徐幼麟 李惠 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2007年第4期417-424,共8页
The possibility of using a multi-stage pendulum mass damper (MSPMD) to control wind-induced vibration of a single column tower of a cable-stayed bridge during construction was studied theoretically in part I of this... The possibility of using a multi-stage pendulum mass damper (MSPMD) to control wind-induced vibration of a single column tower of a cable-stayed bridge during construction was studied theoretically in part I of this work. In this paper, the performance of the MSPMD for reducing bridge tower vibration is studied experimentally. A MSPMD model and a tower model of the bridge with geometry scaling of 1:100 were designed and manufactured. Calibration of the MSPMD model with different wire lengths is conducted to verify the analytical model of the damper. A series of tests for the uncontrolled freestanding tower, tower with cables, and tower with MSPMD model are then performed under harmonic and white noise excitations. The experimental results show that the responses of the tower model significantly decrease with the installation of the MSPMD model, which demonstrates the effectiveness of the M SPMD to mitigate the vibration of the bridge tower. 展开更多
关键词 experimental study cable-stayed bridge single column tower multi-stage pendulum mass damper vibration control
下载PDF
福厦高铁(95+125) m非对称独塔部分斜拉桥设计 被引量:7
3
作者 余艳霞 王德志 《铁道标准设计》 北大核心 2020年第S01期147-151,共5页
新建福州至厦门铁路太城溪特大桥跨越沈海高速公路,斜交角度较大,为减少对高速公路的影响,主桥采用(95+125)m非对称独塔部分斜拉桥方案。对桥体结构体系、主梁梁高、桥塔高度、非对称索力等结构参数进行对比研究,确定合理的结构形式。... 新建福州至厦门铁路太城溪特大桥跨越沈海高速公路,斜交角度较大,为减少对高速公路的影响,主桥采用(95+125)m非对称独塔部分斜拉桥方案。对桥体结构体系、主梁梁高、桥塔高度、非对称索力等结构参数进行对比研究,确定合理的结构形式。结果表明:(1)非对称独塔斜拉桥在不设辅助跨的情况下,采用塔梁墩固结体系能有效提高结构刚度,减小梁部后期徐变,采用墩塔梁固结体系徐变值减小约50%,梁端转角减小约40%;(2)为满足高速铁路无砟轨道梁端转角的限值要求,桥体跨中梁高最小5.3m;(3)随着桥塔高度的增加斜拉索对主梁的加劲效果明显,主梁受力得到有效改善,徐变显著减小;(4)通过不平衡索力的合理选择,有效改善了梁部的结构受力,桥体小跨侧与大跨侧索力比值取1.1时受力最佳。该桥转体质量达3.8万t。 展开更多
关键词 高速铁路 铁路桥 部分斜拉桥 独塔斜拉桥 转体架设法
下载PDF
横桥向地面运动作用下独塔部分斜拉桥易损性分析 被引量:5
4
作者 吴少峰 上官萍 《地震工程与工程振动》 CSCD 北大核心 2010年第2期142-149,共8页
桥梁作为交通生命线系统中的重要工程,屡次在中等强度地震的作用下,遭受严重破坏甚至整体损毁,因此桥梁结构地震易损性研究在世界各国得到重视和发展。部分斜拉桥作为一种新桥型,由于兼有经济性和美学特性,近十年来在国内外发展迅速,但... 桥梁作为交通生命线系统中的重要工程,屡次在中等强度地震的作用下,遭受严重破坏甚至整体损毁,因此桥梁结构地震易损性研究在世界各国得到重视和发展。部分斜拉桥作为一种新桥型,由于兼有经济性和美学特性,近十年来在国内外发展迅速,但这种新桥型尚未经受地震的考验,在可能的地震灾害下,部分斜拉桥的地震破坏损伤概率还不明确,有必要开展有关的易损性研究。本文在桥梁地震易损性研究的基础上,分析在横桥向地面运动作用下独塔部分斜拉桥的易损性,定义五级损伤极限状态,建立桥墩、桥塔、限位器和全桥的易损性曲线,研究结果表明在横桥向地面运动作用下,独塔部分斜拉桥全桥易损性主要受到限位器和中墩的控制。 展开更多
关键词 独塔部分斜拉桥 横桥向地面运动 损伤极限状态 易损性曲线 地震易损性
下载PDF
独塔单索面部分斜拉桥性能评估
5
作者 朱三凡 《福建建筑》 2015年第5期82-87,共6页
以某独塔单索面部分斜拉桥为工程背景,介绍了基于常规定期检查、结构检测、动静载试验结果进行桥梁技术状况全面评估的过程。
关键词 独塔单索面部分斜拉桥 性能评估
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部