Peak load and wind energy emission pressure rise more as wind energy penetration keeps growing,which affects the stabilization of the PS(power system).This paper suggests integrated optimal dispatching of thermal powe...Peak load and wind energy emission pressure rise more as wind energy penetration keeps growing,which affects the stabilization of the PS(power system).This paper suggests integrated optimal dispatching of thermal power generators and BESS(battery energy storage system)taking wind energy emission grading punishment and deep peak clipping into consideration.Firstly,in order to minimize wind abandonment,a hierarchical wind abandonment penalty strategy based on fuzzy control is designed and introduced,and the optimal grid-connected power of wind energy is determined as a result of minimizing the peak cutting cost of the system.Secondly,considering BESS and thermal power,the management approach of BESS-assisted virtual peak clipping of thermal power generators is aimed at reducing the degree of deep peak clipping of thermal power generators and optimizing the output of thermal power generators and the charging and discharging power of BESS.Finally,Give an example of how this strategy has been effective in reducing abandonment rates by 0.66% and 7.46% individually for different wind penetration programs,and the daily average can reduce the peak clipping power output of thermal power generators by 42.97 and 72.31 MWh and enhances the effect and economy of system peak clipping.展开更多
As the smart home is the end-point power consumer, it is the major part to be controlled in a smart micro grid. There are so many challenges for implementing a smart home system in which the most important ones are th...As the smart home is the end-point power consumer, it is the major part to be controlled in a smart micro grid. There are so many challenges for implementing a smart home system in which the most important ones are the cost and simplicity of the implementation method. It is clear that the major share of the total cost is referred to the internal controlling system network; although there are too many methods proposed but still there is not any satisfying method at the consumers' point of view. In this paper, a novel solution for this demand is proposed, which not only minimizes the implementation cost, but also provides a high level of reliability and simplicity of operation; feasibility, extendibility, and flexibility are other leading properties of the design.展开更多
基金supported by Jilin Province Higher Education Teaching Reform Research Project in 2021(JLJY202186163419).
文摘Peak load and wind energy emission pressure rise more as wind energy penetration keeps growing,which affects the stabilization of the PS(power system).This paper suggests integrated optimal dispatching of thermal power generators and BESS(battery energy storage system)taking wind energy emission grading punishment and deep peak clipping into consideration.Firstly,in order to minimize wind abandonment,a hierarchical wind abandonment penalty strategy based on fuzzy control is designed and introduced,and the optimal grid-connected power of wind energy is determined as a result of minimizing the peak cutting cost of the system.Secondly,considering BESS and thermal power,the management approach of BESS-assisted virtual peak clipping of thermal power generators is aimed at reducing the degree of deep peak clipping of thermal power generators and optimizing the output of thermal power generators and the charging and discharging power of BESS.Finally,Give an example of how this strategy has been effective in reducing abandonment rates by 0.66% and 7.46% individually for different wind penetration programs,and the daily average can reduce the peak clipping power output of thermal power generators by 42.97 and 72.31 MWh and enhances the effect and economy of system peak clipping.
文摘As the smart home is the end-point power consumer, it is the major part to be controlled in a smart micro grid. There are so many challenges for implementing a smart home system in which the most important ones are the cost and simplicity of the implementation method. It is clear that the major share of the total cost is referred to the internal controlling system network; although there are too many methods proposed but still there is not any satisfying method at the consumers' point of view. In this paper, a novel solution for this demand is proposed, which not only minimizes the implementation cost, but also provides a high level of reliability and simplicity of operation; feasibility, extendibility, and flexibility are other leading properties of the design.