This paper presents an output feedback design approach based on the adaptive control scheme developed for nonlinearly parameterized systems,to achieve global output regulation for a class of nonlinear systems in outpu...This paper presents an output feedback design approach based on the adaptive control scheme developed for nonlinearly parameterized systems,to achieve global output regulation for a class of nonlinear systems in output feedback form.We solve the output regulation problem without the knowledge of the sign and the value of the high frequency gain a priori.It is not necessary to have both the limiting assumptions that the exogenous signal co and the unknown parameter ju belong to a prior known compact set and the high frequency gain has a determinate lower and upper bounds.The effectiveness of the proposed algorithm is shown with the help of an example.展开更多
In recent years, global wind power has developed rapidly to alleviate environmental pollution and energy crisis. Due to the potential of enhancing the stability of power system through the application of wind power pa...In recent years, global wind power has developed rapidly to alleviate environmental pollution and energy crisis. Due to the potential of enhancing the stability of power system through the application of wind power participating in power grid frequency regulation, the large-scale integration of wind power has become a hot issue for academic research in recent years. This paper classifies the frequency control problems of wind power integration and summarizes the research of power system frequency regulation strategy with high wind power permeability. Energy storage system participating in frequency regulation of the power system with high wind permeability is reviewed and analyzed.展开更多
A power saving frequency difference controlling method was introduced by the double inverter and motor experiment system.The characters of the system under differ- ent loads were investigated.The theoretical analysis ...A power saving frequency difference controlling method was introduced by the double inverter and motor experiment system.The characters of the system under differ- ent loads were investigated.The theoretical analysis and experiment results show the frequency difference method is a ideal power saving speed regulation method for the dou- ble inverter and motor system.The experiment system is simply structured,convenient to operate and provides a new way of character testing for frequency conversion speed regulation.展开更多
Main Exhauster is one of the main equipment of sintering production. It needs to consume a lot of electricity. Therefore, the system' s reconstruction for energy-saving will effectively reduce electricity for the pro...Main Exhauster is one of the main equipment of sintering production. It needs to consume a lot of electricity. Therefore, the system' s reconstruction for energy-saving will effectively reduce electricity for the production. The paper takes an iron and steel enterprise that had successfully transformed the synchronous motors of main exhauster of sintering as an example, which describes the application of high-voltage variable frequency speed regulation system in main exhauster of Sintering, so as to provide a reference for other iron and steel enterprises.展开更多
Hybrid multi-terminal direct current(MTDC)transmission technology has been a research focus,and primary frequency regulation(FR)improvement in the receiving-end system is one of the problems to be solved.This paper pr...Hybrid multi-terminal direct current(MTDC)transmission technology has been a research focus,and primary frequency regulation(FR)improvement in the receiving-end system is one of the problems to be solved.This paper presents a decentralized primary FR scheme for hybrid MTDC power systems considering multi-source enhancement to help suppress frequency disturbance in the receiving-end systems.All the converters only need local frequency or DC voltage signal input to respond to system disturbance without communication or a control center,i.e.,a decentralized control scheme.The proposed scheme can activate appropriate power sources to assist in FR in various system disturbance severities with fine-designed thresholds,ensuring sufficient utilization of each power source.To better balance FR performance and FR resource participation,an evaluation index is proposed and the parameter optimization problem is further conducted.Finally,the validity of the proposed scheme is verified by simulations in MATLAB/Simulink.展开更多
As the proportion of renewable energy(RE)increases,the inertia and the primary frequency regulation(FR)capability of the power system decrease.Thus,ensuring frequency security in the scheduling model has become a new ...As the proportion of renewable energy(RE)increases,the inertia and the primary frequency regulation(FR)capability of the power system decrease.Thus,ensuring frequency security in the scheduling model has become a new technical requirement in power systems with a high share of RE.Due to a shortage of conventional synchronous generators,the frequency support of multi-source converters has become an indispensable part of the system frequency resources,especially variable-speed wind turbine generation(WTG)and battery energy storage(BES).Quantitative expression of the FR capability of multi-source converters is necessary to construct frequency-constrained scheduling model.However,the frequency support performance of these converter-interfaced devices is related to their working states,operation modes,and parameters,and the complex coupling of these factors has not been fully exploited in existing models.In this study,we propose an integrated frequency-constrained scheduling model considering the coordination of FR capabilities from multi-source converters.Switchable FR control strategies and variable FR parameters for WTG with or without reserved power are modeled,and multi-target allocation of BES capacity between tracking dispatch instruction and emergency FR is analyzed.Then,the variable FR capabilities of WTG and BES are embedded into the integrated frequency-constrained scheduling model.The nonlinear constraints for frequency security are precisely linearized through an improved iteration-based strategy.The effectiveness of the proposed model is verified in a modified IEEE 24-bus standard system.The results suggest that the coordinated participation of BES and WTG in FR can effectively reduce the cost of the scheduling model while meeting frequency security constraints.展开更多
Power inverter adopting virtual synchronous generator(VSG)control can provide inertia support for distributed generation systems.However,it cannot take into account the dynamic regulation characteristics of frequency....Power inverter adopting virtual synchronous generator(VSG)control can provide inertia support for distributed generation systems.However,it cannot take into account the dynamic regulation characteristics of frequency.Thus,when the system encounters a sudden change in load or disturbance,the dynamic process of frequency regulation will be greatly influenced.In view of this issue,an improved VSG control strategy based on a coordinated self-adaptive(CSA)method is proposed.The time domain analysis method is used to study the influences of virtual inertia and damping parameter perturbation on the system steady and dynamic performances.Furthermore,in order to make the control strategy suitable for large load changes and suppress frequency variations beyond the limit,the secondary frequency modulation is introduced into the control loop.Through the coordinated adaptive control of virtual inertia,virtual damping and frequency modulation,the dynamic performance of vSG frequency regulation can be obviously improved.Simulation and experiment results have verified the effectiveness of the proposed CSA control strategy.展开更多
The high renewable penetrated power system has severe frequency regulation problems.Distributed resources can provide frequency regulation services but are limited by com-munication time delay.This paper proposes a co...The high renewable penetrated power system has severe frequency regulation problems.Distributed resources can provide frequency regulation services but are limited by com-munication time delay.This paper proposes a communication resources allocation model to reduce communication time delay in frequency regulation service.Communication device resources and wireless spectrum resources are allocated to distributed resources when they participate in frequency regulation.We reveal impact of communication resources allocation on time delay reduction and frequency regulation performance.Besides,we study communication resources allocation solution in high renewable energy penetrated power systems.We provide a case study based on the HRP-38 system.Results show communication time delay decreases distributed resources'ability to provide frequency regulation service.On the other hand,allocating more communication resources to distributed resources'communica-tion services improves their frequency regulation performance.For power systems with renewable energy penetration above 70%,required communications resources are about five times as many as 30%renewable energy penetrated power systems to keep frequency performance the same.Index Terms-Communication resources allocation,commun-ication time delay,distributed resource,frequency regulation,high renewable energy penetrated power system.展开更多
To reduce the difficulty and enhance the enthusiasm of private-owned electric vehicles(EVs) in participating in frequency regulation ancillary service market(FRASM), a decision aid model(DAM) is proposed. This paper p...To reduce the difficulty and enhance the enthusiasm of private-owned electric vehicles(EVs) in participating in frequency regulation ancillary service market(FRASM), a decision aid model(DAM) is proposed. This paper presents three options for EV participating in FRASM, i. e., the base mode(BM), unidirectional charging mode(UCM), and bidirectional charging/discharging mode(BCDM), based on a reasonable simplification of users' participating willingness. In BM, individual EVs will not be involved in FRASM, and DAM will assist users to set the optimal charging schemes based on travel plans under the time-of-use(TOU) price. UCM and BCDM are two modes in which EVs can take part in FRASM. DAM can assist EV users to create their quotation plan, which includes hourly upper and lower reserve capabilities and regulation market mileage prices. In UCM and BCDM, the difference is that only the charging rate can be adjusted in the UCM, and the EVs in BCDM can not only charge but also discharge if necessary. DAM can estimate the expected revenue of all three modes, and EV users can make the final decision based on their preferences. Simulation results indicate that all the three modes of DAM can reduce the cost, while BCDM can get the maximum expected revenue.展开更多
Photovoltaic(PV)and battery energy storage systems(BESSs)are key components in the energy market and crucial contributors to carbon emission reduction targets.These systems can not only provide energy but can also gen...Photovoltaic(PV)and battery energy storage systems(BESSs)are key components in the energy market and crucial contributors to carbon emission reduction targets.These systems can not only provide energy but can also generate considerable revenue by providing frequency regulation services and participating in carbon trading.This study proposes a bidding strategy for PV and BESSs operating in joint energy and frequency regulation markets,with a specific focus on carbon reduction benefits.A two-stage bidding framework that optimizes the profit of PV and BESSs is presented.In the first stage,the day-ahead energy market takes into account potential real-time forecast deviations.In the second stage,the real-time balancing market uses a rolling optimization method to account for multiple uncertainties.Notably,a real-time frequency regulation control method is proposed for the participation of PV and BESSs in automatic generation control(AGC).This is particularly relevant given the uncertainty of grid frequency fluctuations in the optimization model of the real-time balancing market.This control method dynamically assigns the frequency regulation amount undertaken by the PV and BESSs according to the control interval in which the area control error(ACE)occurs.The case study results demonstrate that the proposed bidding strategy not only enables the PV and BESSs to effectively participate in the grid frequency regulation response but also yields considerable carbon emission reduction benefits and effectively improves the system operation economy.展开更多
Frequency regulation of voltage source converter-based multi-terminal high-voltage direct current(VSC-MTDC)system with offshore wind farms enhances the frequency stability by compensating the power for a disturbed AC ...Frequency regulation of voltage source converter-based multi-terminal high-voltage direct current(VSC-MTDC)system with offshore wind farms enhances the frequency stability by compensating the power for a disturbed AC system.However,it is difficult to reasonably allocate frequency-regulation resources due to a lack of coordination mechanisms between wind farms and the MTDC system.Moreover,it is difficult for the frequency control of the wind farms to manage changes in wind speed;and the risk of wind-turbine stalls is high.Thus,based on the kinetic energy of wind turbines and the power margin of the converters,the frequency-regulation capability of wind turbines is evaluated,and a dynamic frequency-support scheme considering the real-time frequency-support capability of the wind turbines and system frequency evolution is proposed to improve the frequency-support performance.A power adaptation technique at variable wind speeds is developed;the active power in the frequency-support stage and restoration stage is switched according to the wind speed.A hierarchical zoning frequency-regulation scheme is designed to use the frequency-regulation resources of different links in the MTDC system with wind farms.The simulation results show that the novel frequency-regulation strategy maintains frequency stability with wind-speed changes and avoids multiple frequency dips.展开更多
This paper presents a method of tuning governor control parameters of an isolated hydropower generator considering the primary frequency performance and small-signal stability. First, generators that can be operated i...This paper presents a method of tuning governor control parameters of an isolated hydropower generator considering the primary frequency performance and small-signal stability. First, generators that can be operated in isolated state are identified. Second, different schemes are proposed for generator mode switching from on-grid to off-grid state through comparison and mechanism analysis. Third, the time domain model and frequency domain model of the isolated generator governor are constructed to respectively estimate the primary frequency performance and small signal stability. Parameter sets that satisfy the primary frequency performance and small signal stability are acquired as optimal values of governor control parameters. Finally, the measurement-based parameters of the governor are identified and validated using simulations to demonstrate the feasibility and effectiveness of the method.展开更多
With various components and complex topologies,the applications of high-voltage direct current(HVDC)links bring new challenges to the interconnected power systems in the aspect of frequency security,which further infl...With various components and complex topologies,the applications of high-voltage direct current(HVDC)links bring new challenges to the interconnected power systems in the aspect of frequency security,which further influence their reliability performances.Consequently,this paper presents an approach to evaluate the impacts of the HVDC link outage on the reliability of interconnected power system considering the frequency regulation process during system contingencies.Firstly,a multi-state model of an HVDC link with different available loading rates(ALRs)is established based on its reliability network.Then,dynamic frequency response models of the interconnected power system are presented and integrated with a novel frequency regulation scheme enabled by the HVDC link.The proposed scheme exploits the temporary overload capability of normal converters to compensate for the imbalanced power during system contingencies.Moreover,it offers frequency support that enables the frequency regulation reserves of the sending-end and receiving-end power systems to be mutually available.Several indices are established to measure the system reliability based on the given models in terms of abnormal frequency duration,frequency deviation,and energy losses of the frequency regulation process during system contingencies.Finally,a modified two-area reliability test system(RTS)with an HVDC link is adopted to verify the proposed approach.展开更多
A continuous-time Model Predictive Controller was proposed using Kautz function in order to improve the performance of Load Frequency Control(LFC).A dynamic model of an interconnected power system was used for Model P...A continuous-time Model Predictive Controller was proposed using Kautz function in order to improve the performance of Load Frequency Control(LFC).A dynamic model of an interconnected power system was used for Model Predictive Controller(MPC)design.MPC predicts the future trajectory of the dynamic model by calculating the optimal closed loop feedback gain matrix.In this paper,the optimal closed loop feedback gain matrix was calculated using Kautz function.Being an Orthonormal Basis Function(OBF),Kautz function has an advantage of solving complex pole-based nonlinear system.Genetic Algorithm(GA)was applied to optimally tune the Kautz function-based MPC.A constraint based on phase plane analysis was implemented with the cost function in order to improve the robustness of the Kautz function-based MPC.The proposed method was simulated with three area interconnected power system and the efficiency of the proposed method was measured and exhibited by comparing with conventional Proportional and Integral(PI)controller and Linear Quadratic Regulation(LQR).展开更多
In this paper, an attempt has been made to produce a recipient system of wireless charge for a simple hearing aid so that electrical signal would be generated through detecting and receiving radio frequency waves (RF)...In this paper, an attempt has been made to produce a recipient system of wireless charge for a simple hearing aid so that electrical signal would be generated through detecting and receiving radio frequency waves (RF). The purpose of this design is to receive wireless charge for hearing aids and basically for any electronic device which is not required to a high energy for being setup. In this study, it has been demonstrated that as the amount of radio receiving energy increases, distance of receiver from antenna should be decreased;otherwise, either maximum amount of the receiving energy, or signal power density of the transmitter should be increased. Since it is impossible to be performed, it is decided to set up an energy receiving system constructed by rectenna and charge Circuit and to adjust their parameters to provide energy requirements for a device with low-power consumption. In this paper, different components of an energy receiving system from radio frequency band have been mentioned and a diagram block has been suggested. Subsequently, input impedance of designed antenna has been adjusted by provided relations. This impedance should be adjusted with the total impedance of regarded hearing aid Circuit by which the highest amount of received signal power is transferred to the battery of hearing aids. Received signal is converted to a dc voltage by rectifier diode. Finally, by applying a voltage regulator which has been designed using a common-collector amplifier not only the output voltage is kept constant, but the power is also strengthened. The battery of the hearing aids will be charged using the obtained power and voltage.展开更多
In view of the difficulty of automatic adjustment, the recovery lag and the major accident potential of the mine ventilation system, an experimental model of the pipe net was established according to the typical one m...In view of the difficulty of automatic adjustment, the recovery lag and the major accident potential of the mine ventilation system, an experimental model of the pipe net was established according to the typical one mine and one working face ventilation system of Daliuta coal mine. Using the best uniform approximation method of Chebyshev interpolation to fit the fan performance curve, we experimentally determined fan characteristics with different frequencies and establish the data base for the curves. Based on ventilation network monitoring theory, we designed a monitoring system for ventilation network parameter monitoring and fan operating frequency automatic control. Using the absolute methane emission quantity to predict the air quantity requirement of branch and fan frequency, we established a f-ω regulation model based on fan frequency and absolute methane emission quantity. After analysing methane emission and distribution characteristics, using CO_2 to simulate the methane emission characteristics from a working face, we verified the correctness and rationality of the f-ω regulation model. The fan operation frequency is adjusted by the method of air adjustment change with methane emission quantity and the curve searching method after determining air quantity requirements. The results show that the air quantity in a branch strictly changes according to the f-ω regulation model, in the airincreasing dilution by fan frequency regulation, the CO_2 concentration is limited to the set threshold value. The paper verifies the practicability of a frequency regulation system and the feasibility of the frequency adjustment scheme and provides guidance for the construction of automatic frequency conversion control system in coal mine ventilation networks.展开更多
Heavy renewable penetrations and high-voltage cross-regional transmission systems reduce the inertia and critical frequency stability of power systems after disturbances.Therefore,the power system operators should ens...Heavy renewable penetrations and high-voltage cross-regional transmission systems reduce the inertia and critical frequency stability of power systems after disturbances.Therefore,the power system operators should ensure the frequency nadirs after possible disturbances are within the set restriction,e.g.,0.20 Hz.Traditional methods utilize linearized and simplified control models to quantify the frequency nadirs and achieve frequency-constrained unit commitments(FCUCs).However,the simplified models are hard to depict the frequency responses of practical units after disturbances.Also,they usually neglect the regulations from battery storage.This paper achieves FCUCs with linear rules extracted from massive simulation results.We simulate the frequency responses on typical thermal-hydro-storage systems under diverse unit online conditions.Then,we extract the rules of frequency nadirs after disturbances merely with linear support vector machine to evaluate the frequency stability of power systems.The algorithm holds a high accuracy in a wide range of frequency restrictions.Finally,we apply the rules to three typical cases to show the influences of frequency constraints on unit commitments.展开更多
Wind power(WP)is considered as one of the main renewable energy sources(RESs)for future low-carbon and high-cost-efficient power system.However,its low inertia characteristic may threaten the system frequ-ency stabili...Wind power(WP)is considered as one of the main renewable energy sources(RESs)for future low-carbon and high-cost-efficient power system.However,its low inertia characteristic may threaten the system frequ-ency stability of the power system with a high penetration of WP generation.Thus,the capability of WP participating in the system frequency regulation has become a research hotspot.In this paper,the impact of WP on power system frequency stability is initially presented.In addition,various existing control strategies of WP participating in frequency regulation are reviewed from the wind turbine(WT)level to the wind farm(WF)level,and their perfor-mances are compared in terms of operating principles and practical applications.The pros and cons of each control strategy are also discussed.Moreover,the WP combing with energy storage system(ESS)for system frequency regulation is explored.Furthermore,the prospects,future challenges,and solutions of WP participating in power system frequency regulation are summarized.展开更多
The sudden generation-consumption imbalance is becoming more frequent in modern power systems, causing voltage and frequency stability issues. One potential solution is load participation in primary control. We formul...The sudden generation-consumption imbalance is becoming more frequent in modern power systems, causing voltage and frequency stability issues. One potential solution is load participation in primary control. We formulate a novel optimal load control(NOLC) problem that aims to minimize the disutility of controllable loads in providing primary regulation. In this paper, we show that the network dynamics, coupled with welldefined load control(obtained via optimality condition), can be seen as an optimization algorithm to solve the dual problem of NOLC. Unlike most existing load control frameworks that only consider frequency response, our load-side primary control focuses on frequency, voltage, and aggregate cost. Simulation results imply that the NOLC approach can ensure better frequency and voltage regulations. Moreover, the coordination between NOLC and other devices enabled in the system, the NOLC performance against the total size of controllable loads, and the NOLC effectiveness in a multi-machine power system are also verified in MATLAB/Simulink.展开更多
新能源渗透率的提高增加了电网频率控制的复杂度,储能辅助电网调频能在一定程度上缓解该问题,但受储能运行的安全性与经济性约束,要求调频措施更具针对性。文中对此展开研究,提出一种基于频率响应特性的储能辅助电网一次调频方法。首先...新能源渗透率的提高增加了电网频率控制的复杂度,储能辅助电网调频能在一定程度上缓解该问题,但受储能运行的安全性与经济性约束,要求调频措施更具针对性。文中对此展开研究,提出一种基于频率响应特性的储能辅助电网一次调频方法。首先,在储能辅助电网调频模型基础上,选择惯性加下垂的储能辅助电网调频综合控制方法,通过电网频率变化率(rate of change of frequency,RoCoF)、频率偏差与调频需求的关联性分析,设计基于频率响应特性的调频需求分区规则;然后,根据不同调频需求对应的分区判断,对储能有功输出方式进行动态调整,以响应调频需求的不确定性,并在此基础上,针对调频需求与储能出力需求、储能出力强弱与其循环使用寿命间的矛盾关系,通过多目标优化问题的设计与求解来予以平衡;最后,仿真结果验证了所提方法能够在保证电网调频效果的基础上,有效降低储能充放电深度。展开更多
基金supported by the National Natural Science Foundation of China(61663030,61663032)the Natural Science Foundation of Jiangxi Province(20142BAB207021)+4 种基金the Foundation of Jiangxi Educational Committee(GJJ150753)the Open Fund of Key Laboratory of Image Processing and Pattern Recognition of Jiangxi Province(Nanchang Hangkong University)(TX201404003)the Key Laboratory of Nondestructive Testing(Nanchang Hangkong University)Ministry of Education(ZD29529005)the Reform Project of Degree and Postgraduate Education in Jiangxi(JXYJG-2017-131)
文摘This paper presents an output feedback design approach based on the adaptive control scheme developed for nonlinearly parameterized systems,to achieve global output regulation for a class of nonlinear systems in output feedback form.We solve the output regulation problem without the knowledge of the sign and the value of the high frequency gain a priori.It is not necessary to have both the limiting assumptions that the exogenous signal co and the unknown parameter ju belong to a prior known compact set and the high frequency gain has a determinate lower and upper bounds.The effectiveness of the proposed algorithm is shown with the help of an example.
文摘In recent years, global wind power has developed rapidly to alleviate environmental pollution and energy crisis. Due to the potential of enhancing the stability of power system through the application of wind power participating in power grid frequency regulation, the large-scale integration of wind power has become a hot issue for academic research in recent years. This paper classifies the frequency control problems of wind power integration and summarizes the research of power system frequency regulation strategy with high wind power permeability. Energy storage system participating in frequency regulation of the power system with high wind permeability is reviewed and analyzed.
文摘A power saving frequency difference controlling method was introduced by the double inverter and motor experiment system.The characters of the system under differ- ent loads were investigated.The theoretical analysis and experiment results show the frequency difference method is a ideal power saving speed regulation method for the dou- ble inverter and motor system.The experiment system is simply structured,convenient to operate and provides a new way of character testing for frequency conversion speed regulation.
文摘Main Exhauster is one of the main equipment of sintering production. It needs to consume a lot of electricity. Therefore, the system' s reconstruction for energy-saving will effectively reduce electricity for the production. The paper takes an iron and steel enterprise that had successfully transformed the synchronous motors of main exhauster of sintering as an example, which describes the application of high-voltage variable frequency speed regulation system in main exhauster of Sintering, so as to provide a reference for other iron and steel enterprises.
基金supported by the National Natural Science Foundation of China(No.52077196)the Science and Technology Project of State Grid Zhejiang Electric Power Co.,Ltd.(No.5211JY21N001)。
文摘Hybrid multi-terminal direct current(MTDC)transmission technology has been a research focus,and primary frequency regulation(FR)improvement in the receiving-end system is one of the problems to be solved.This paper presents a decentralized primary FR scheme for hybrid MTDC power systems considering multi-source enhancement to help suppress frequency disturbance in the receiving-end systems.All the converters only need local frequency or DC voltage signal input to respond to system disturbance without communication or a control center,i.e.,a decentralized control scheme.The proposed scheme can activate appropriate power sources to assist in FR in various system disturbance severities with fine-designed thresholds,ensuring sufficient utilization of each power source.To better balance FR performance and FR resource participation,an evaluation index is proposed and the parameter optimization problem is further conducted.Finally,the validity of the proposed scheme is verified by simulations in MATLAB/Simulink.
基金supported by the National Key Research and Development Program of China(No.2021YFB2400500)the Science and Technology Project of State Grid Corporation of China“Fast control of photovoltaic and wind power plant for transient frequency/voltage support”.
文摘As the proportion of renewable energy(RE)increases,the inertia and the primary frequency regulation(FR)capability of the power system decrease.Thus,ensuring frequency security in the scheduling model has become a new technical requirement in power systems with a high share of RE.Due to a shortage of conventional synchronous generators,the frequency support of multi-source converters has become an indispensable part of the system frequency resources,especially variable-speed wind turbine generation(WTG)and battery energy storage(BES).Quantitative expression of the FR capability of multi-source converters is necessary to construct frequency-constrained scheduling model.However,the frequency support performance of these converter-interfaced devices is related to their working states,operation modes,and parameters,and the complex coupling of these factors has not been fully exploited in existing models.In this study,we propose an integrated frequency-constrained scheduling model considering the coordination of FR capabilities from multi-source converters.Switchable FR control strategies and variable FR parameters for WTG with or without reserved power are modeled,and multi-target allocation of BES capacity between tracking dispatch instruction and emergency FR is analyzed.Then,the variable FR capabilities of WTG and BES are embedded into the integrated frequency-constrained scheduling model.The nonlinear constraints for frequency security are precisely linearized through an improved iteration-based strategy.The effectiveness of the proposed model is verified in a modified IEEE 24-bus standard system.The results suggest that the coordinated participation of BES and WTG in FR can effectively reduce the cost of the scheduling model while meeting frequency security constraints.
基金supported by National Natural Science Foundation of China(No.51577124,No.51877148)National Key Research and Development Program of China(SQ2023YFE0198100)。
文摘Power inverter adopting virtual synchronous generator(VSG)control can provide inertia support for distributed generation systems.However,it cannot take into account the dynamic regulation characteristics of frequency.Thus,when the system encounters a sudden change in load or disturbance,the dynamic process of frequency regulation will be greatly influenced.In view of this issue,an improved VSG control strategy based on a coordinated self-adaptive(CSA)method is proposed.The time domain analysis method is used to study the influences of virtual inertia and damping parameter perturbation on the system steady and dynamic performances.Furthermore,in order to make the control strategy suitable for large load changes and suppress frequency variations beyond the limit,the secondary frequency modulation is introduced into the control loop.Through the coordinated adaptive control of virtual inertia,virtual damping and frequency modulation,the dynamic performance of vSG frequency regulation can be obviously improved.Simulation and experiment results have verified the effectiveness of the proposed CSA control strategy.
基金supported in part by the National Key R&D Program of China(No.2021YFB2401200)the National Natural Science Foundation of China Enterprise Innovation and Development Joint Fund(No.U21B2002).
文摘The high renewable penetrated power system has severe frequency regulation problems.Distributed resources can provide frequency regulation services but are limited by com-munication time delay.This paper proposes a communication resources allocation model to reduce communication time delay in frequency regulation service.Communication device resources and wireless spectrum resources are allocated to distributed resources when they participate in frequency regulation.We reveal impact of communication resources allocation on time delay reduction and frequency regulation performance.Besides,we study communication resources allocation solution in high renewable energy penetrated power systems.We provide a case study based on the HRP-38 system.Results show communication time delay decreases distributed resources'ability to provide frequency regulation service.On the other hand,allocating more communication resources to distributed resources'communica-tion services improves their frequency regulation performance.For power systems with renewable energy penetration above 70%,required communications resources are about five times as many as 30%renewable energy penetrated power systems to keep frequency performance the same.Index Terms-Communication resources allocation,commun-ication time delay,distributed resource,frequency regulation,high renewable energy penetrated power system.
基金supported in part by the National Natural Science Foundation of China(No.51777065).
文摘To reduce the difficulty and enhance the enthusiasm of private-owned electric vehicles(EVs) in participating in frequency regulation ancillary service market(FRASM), a decision aid model(DAM) is proposed. This paper presents three options for EV participating in FRASM, i. e., the base mode(BM), unidirectional charging mode(UCM), and bidirectional charging/discharging mode(BCDM), based on a reasonable simplification of users' participating willingness. In BM, individual EVs will not be involved in FRASM, and DAM will assist users to set the optimal charging schemes based on travel plans under the time-of-use(TOU) price. UCM and BCDM are two modes in which EVs can take part in FRASM. DAM can assist EV users to create their quotation plan, which includes hourly upper and lower reserve capabilities and regulation market mileage prices. In UCM and BCDM, the difference is that only the charging rate can be adjusted in the UCM, and the EVs in BCDM can not only charge but also discharge if necessary. DAM can estimate the expected revenue of all three modes, and EV users can make the final decision based on their preferences. Simulation results indicate that all the three modes of DAM can reduce the cost, while BCDM can get the maximum expected revenue.
基金supported by the Jilin Province Science and Technology Development Plan Project(No.20220203163SF).
文摘Photovoltaic(PV)and battery energy storage systems(BESSs)are key components in the energy market and crucial contributors to carbon emission reduction targets.These systems can not only provide energy but can also generate considerable revenue by providing frequency regulation services and participating in carbon trading.This study proposes a bidding strategy for PV and BESSs operating in joint energy and frequency regulation markets,with a specific focus on carbon reduction benefits.A two-stage bidding framework that optimizes the profit of PV and BESSs is presented.In the first stage,the day-ahead energy market takes into account potential real-time forecast deviations.In the second stage,the real-time balancing market uses a rolling optimization method to account for multiple uncertainties.Notably,a real-time frequency regulation control method is proposed for the participation of PV and BESSs in automatic generation control(AGC).This is particularly relevant given the uncertainty of grid frequency fluctuations in the optimization model of the real-time balancing market.This control method dynamically assigns the frequency regulation amount undertaken by the PV and BESSs according to the control interval in which the area control error(ACE)occurs.The case study results demonstrate that the proposed bidding strategy not only enables the PV and BESSs to effectively participate in the grid frequency regulation response but also yields considerable carbon emission reduction benefits and effectively improves the system operation economy.
基金supported by the National Key R&D Program of China(No.2022YFB2402700).
文摘Frequency regulation of voltage source converter-based multi-terminal high-voltage direct current(VSC-MTDC)system with offshore wind farms enhances the frequency stability by compensating the power for a disturbed AC system.However,it is difficult to reasonably allocate frequency-regulation resources due to a lack of coordination mechanisms between wind farms and the MTDC system.Moreover,it is difficult for the frequency control of the wind farms to manage changes in wind speed;and the risk of wind-turbine stalls is high.Thus,based on the kinetic energy of wind turbines and the power margin of the converters,the frequency-regulation capability of wind turbines is evaluated,and a dynamic frequency-support scheme considering the real-time frequency-support capability of the wind turbines and system frequency evolution is proposed to improve the frequency-support performance.A power adaptation technique at variable wind speeds is developed;the active power in the frequency-support stage and restoration stage is switched according to the wind speed.A hierarchical zoning frequency-regulation scheme is designed to use the frequency-regulation resources of different links in the MTDC system with wind farms.The simulation results show that the novel frequency-regulation strategy maintains frequency stability with wind-speed changes and avoids multiple frequency dips.
基金supported by the Fujian Provincial Government Project (Title: Research on whole process evaluation of dynamic stability and control strategy in condition of grid connection of ultra-high voltage and large scale penetration of nuclear power.No.2015H0023)the State Grid Science & Technology Project (Title: Research on the improvement on stability of primary frequency of generator in account of the tolerance of equipment.No.52130417002P)the Key project of State Grid Fujian Electric Power Company,Ltd (research on key technologies of primary frequency power oscillation mechanism analysis and inhibition measures in large-scale unit in Fujian power grid.No.52130417000J)
文摘This paper presents a method of tuning governor control parameters of an isolated hydropower generator considering the primary frequency performance and small-signal stability. First, generators that can be operated in isolated state are identified. Second, different schemes are proposed for generator mode switching from on-grid to off-grid state through comparison and mechanism analysis. Third, the time domain model and frequency domain model of the isolated generator governor are constructed to respectively estimate the primary frequency performance and small signal stability. Parameter sets that satisfy the primary frequency performance and small signal stability are acquired as optimal values of governor control parameters. Finally, the measurement-based parameters of the governor are identified and validated using simulations to demonstrate the feasibility and effectiveness of the method.
基金supported by the National Science Foundation of China (No.51807173)the Foundation Research Funds for Central Universities (No.2021QNA4012)the Project of State Grid Zhejiang Electric Power Co.,Ltd. (No.2021ZK11)。
文摘With various components and complex topologies,the applications of high-voltage direct current(HVDC)links bring new challenges to the interconnected power systems in the aspect of frequency security,which further influence their reliability performances.Consequently,this paper presents an approach to evaluate the impacts of the HVDC link outage on the reliability of interconnected power system considering the frequency regulation process during system contingencies.Firstly,a multi-state model of an HVDC link with different available loading rates(ALRs)is established based on its reliability network.Then,dynamic frequency response models of the interconnected power system are presented and integrated with a novel frequency regulation scheme enabled by the HVDC link.The proposed scheme exploits the temporary overload capability of normal converters to compensate for the imbalanced power during system contingencies.Moreover,it offers frequency support that enables the frequency regulation reserves of the sending-end and receiving-end power systems to be mutually available.Several indices are established to measure the system reliability based on the given models in terms of abnormal frequency duration,frequency deviation,and energy losses of the frequency regulation process during system contingencies.Finally,a modified two-area reliability test system(RTS)with an HVDC link is adopted to verify the proposed approach.
文摘A continuous-time Model Predictive Controller was proposed using Kautz function in order to improve the performance of Load Frequency Control(LFC).A dynamic model of an interconnected power system was used for Model Predictive Controller(MPC)design.MPC predicts the future trajectory of the dynamic model by calculating the optimal closed loop feedback gain matrix.In this paper,the optimal closed loop feedback gain matrix was calculated using Kautz function.Being an Orthonormal Basis Function(OBF),Kautz function has an advantage of solving complex pole-based nonlinear system.Genetic Algorithm(GA)was applied to optimally tune the Kautz function-based MPC.A constraint based on phase plane analysis was implemented with the cost function in order to improve the robustness of the Kautz function-based MPC.The proposed method was simulated with three area interconnected power system and the efficiency of the proposed method was measured and exhibited by comparing with conventional Proportional and Integral(PI)controller and Linear Quadratic Regulation(LQR).
文摘In this paper, an attempt has been made to produce a recipient system of wireless charge for a simple hearing aid so that electrical signal would be generated through detecting and receiving radio frequency waves (RF). The purpose of this design is to receive wireless charge for hearing aids and basically for any electronic device which is not required to a high energy for being setup. In this study, it has been demonstrated that as the amount of radio receiving energy increases, distance of receiver from antenna should be decreased;otherwise, either maximum amount of the receiving energy, or signal power density of the transmitter should be increased. Since it is impossible to be performed, it is decided to set up an energy receiving system constructed by rectenna and charge Circuit and to adjust their parameters to provide energy requirements for a device with low-power consumption. In this paper, different components of an energy receiving system from radio frequency band have been mentioned and a diagram block has been suggested. Subsequently, input impedance of designed antenna has been adjusted by provided relations. This impedance should be adjusted with the total impedance of regarded hearing aid Circuit by which the highest amount of received signal power is transferred to the battery of hearing aids. Received signal is converted to a dc voltage by rectifier diode. Finally, by applying a voltage regulator which has been designed using a common-collector amplifier not only the output voltage is kept constant, but the power is also strengthened. The battery of the hearing aids will be charged using the obtained power and voltage.
基金support from the National Key Research and Development Plan (No.2016YFC0801800)the National Natural Science Foundation of China (No.51404263)+2 种基金the National Natural Science Foundation of Jiangsu (No.BK20130203)the Project Funded by the Priority Academic Program Development (PAPD) of Jiangsu Higher Education Institutionsthe Fundamental Research Funds for the Central Universities (Nos.2014XT02 and 2014ZDPY03)
文摘In view of the difficulty of automatic adjustment, the recovery lag and the major accident potential of the mine ventilation system, an experimental model of the pipe net was established according to the typical one mine and one working face ventilation system of Daliuta coal mine. Using the best uniform approximation method of Chebyshev interpolation to fit the fan performance curve, we experimentally determined fan characteristics with different frequencies and establish the data base for the curves. Based on ventilation network monitoring theory, we designed a monitoring system for ventilation network parameter monitoring and fan operating frequency automatic control. Using the absolute methane emission quantity to predict the air quantity requirement of branch and fan frequency, we established a f-ω regulation model based on fan frequency and absolute methane emission quantity. After analysing methane emission and distribution characteristics, using CO_2 to simulate the methane emission characteristics from a working face, we verified the correctness and rationality of the f-ω regulation model. The fan operation frequency is adjusted by the method of air adjustment change with methane emission quantity and the curve searching method after determining air quantity requirements. The results show that the air quantity in a branch strictly changes according to the f-ω regulation model, in the airincreasing dilution by fan frequency regulation, the CO_2 concentration is limited to the set threshold value. The paper verifies the practicability of a frequency regulation system and the feasibility of the frequency adjustment scheme and provides guidance for the construction of automatic frequency conversion control system in coal mine ventilation networks.
基金supported by the research project from China Three Gorges Corporation(No.202103386).
文摘Heavy renewable penetrations and high-voltage cross-regional transmission systems reduce the inertia and critical frequency stability of power systems after disturbances.Therefore,the power system operators should ensure the frequency nadirs after possible disturbances are within the set restriction,e.g.,0.20 Hz.Traditional methods utilize linearized and simplified control models to quantify the frequency nadirs and achieve frequency-constrained unit commitments(FCUCs).However,the simplified models are hard to depict the frequency responses of practical units after disturbances.Also,they usually neglect the regulations from battery storage.This paper achieves FCUCs with linear rules extracted from massive simulation results.We simulate the frequency responses on typical thermal-hydro-storage systems under diverse unit online conditions.Then,we extract the rules of frequency nadirs after disturbances merely with linear support vector machine to evaluate the frequency stability of power systems.The algorithm holds a high accuracy in a wide range of frequency restrictions.Finally,we apply the rules to three typical cases to show the influences of frequency constraints on unit commitments.
基金supported by the State Grid Corporation Headquarters Science and Technology Project(Grant No.5100-202199273A-0-0-00).
文摘Wind power(WP)is considered as one of the main renewable energy sources(RESs)for future low-carbon and high-cost-efficient power system.However,its low inertia characteristic may threaten the system frequ-ency stability of the power system with a high penetration of WP generation.Thus,the capability of WP participating in the system frequency regulation has become a research hotspot.In this paper,the impact of WP on power system frequency stability is initially presented.In addition,various existing control strategies of WP participating in frequency regulation are reviewed from the wind turbine(WT)level to the wind farm(WF)level,and their perfor-mances are compared in terms of operating principles and practical applications.The pros and cons of each control strategy are also discussed.Moreover,the WP combing with energy storage system(ESS)for system frequency regulation is explored.Furthermore,the prospects,future challenges,and solutions of WP participating in power system frequency regulation are summarized.
基金supported in part by the National Natural Science Foundation of China (No.U1909201)。
文摘The sudden generation-consumption imbalance is becoming more frequent in modern power systems, causing voltage and frequency stability issues. One potential solution is load participation in primary control. We formulate a novel optimal load control(NOLC) problem that aims to minimize the disutility of controllable loads in providing primary regulation. In this paper, we show that the network dynamics, coupled with welldefined load control(obtained via optimality condition), can be seen as an optimization algorithm to solve the dual problem of NOLC. Unlike most existing load control frameworks that only consider frequency response, our load-side primary control focuses on frequency, voltage, and aggregate cost. Simulation results imply that the NOLC approach can ensure better frequency and voltage regulations. Moreover, the coordination between NOLC and other devices enabled in the system, the NOLC performance against the total size of controllable loads, and the NOLC effectiveness in a multi-machine power system are also verified in MATLAB/Simulink.
文摘新能源渗透率的提高增加了电网频率控制的复杂度,储能辅助电网调频能在一定程度上缓解该问题,但受储能运行的安全性与经济性约束,要求调频措施更具针对性。文中对此展开研究,提出一种基于频率响应特性的储能辅助电网一次调频方法。首先,在储能辅助电网调频模型基础上,选择惯性加下垂的储能辅助电网调频综合控制方法,通过电网频率变化率(rate of change of frequency,RoCoF)、频率偏差与调频需求的关联性分析,设计基于频率响应特性的调频需求分区规则;然后,根据不同调频需求对应的分区判断,对储能有功输出方式进行动态调整,以响应调频需求的不确定性,并在此基础上,针对调频需求与储能出力需求、储能出力强弱与其循环使用寿命间的矛盾关系,通过多目标优化问题的设计与求解来予以平衡;最后,仿真结果验证了所提方法能够在保证电网调频效果的基础上,有效降低储能充放电深度。