To improve the operation efficiency of the photovoltaic power station complementary power generation system,an optimal allocation model of the photovoltaic power station complementary power generation capacity based o...To improve the operation efficiency of the photovoltaic power station complementary power generation system,an optimal allocation model of the photovoltaic power station complementary power generation capacity based on PSO-BP is proposed.Particle Swarm Optimization and BP neural network are used to establish the forecasting model,the Markov chain model is used to correct the forecasting error of the model,and the weighted fitting method is used to forecast the annual load curve,to complete the optimal allocation of complementary generating capacity of photovoltaic power stations.The experimental results show that thismethod reduces the average loss of photovoltaic output prediction,improves the prediction accuracy and recall rate of photovoltaic output prediction,and ensures the effective operation of the power system.展开更多
Since it was first proposed,the space solar power station(SSPS)has attracted great attention all over the world;it is a huge space system and provides energy for Earth.Although several schemes and abundant studies on ...Since it was first proposed,the space solar power station(SSPS)has attracted great attention all over the world;it is a huge space system and provides energy for Earth.Although several schemes and abundant studies on the SSPS have been proposed and conducted,it is still not realized.The reason why SSPS is still an idea is not only because it is a giant and complex project,but also due to the requirement for various excellent space materials.Among the diverse required materials,we believe energy materials are the most important.Herein,we review the space energy conversion materials for the SSPS.展开更多
Distributed photovoltaic power (PV) is the main development model of distributed generation. It is necessary to research on dispatching and operation management with large-scale distributed PV connected. This paper an...Distributed photovoltaic power (PV) is the main development model of distributed generation. It is necessary to research on dispatching and operation management with large-scale distributed PV connected. This paper analyzes development status, technical requirement and dispatching and operation management situation of distributed PV in Germany and China. Then introduce the preparation of distributed PV dispatching and operation management criterion. Through summarizing the experiences and lessons of large-scale distributed PV development in Germany, it gives advice to the development of distributed PV dispatching and operation management in China.展开更多
Being photovoltaic power generation affected by radiation strength, wind speed, clouds cover and environment temperature, the generating in each moment is fluctuating. The operational characteristics of grid-connected...Being photovoltaic power generation affected by radiation strength, wind speed, clouds cover and environment temperature, the generating in each moment is fluctuating. The operational characteristics of grid-connected PV systems are coincided with gray theory application conditions. A gray theory model has been applied in short-term forecast of grid-connected photovoltaic system. The verification model of the probability of small error will help to check the accuracy of the gray forecast results. The calculated result shows that the ?model accuracy has been greatly enhanced.展开更多
This paper primarily discusses the main circuit of single-phase inverter circuits.It begins by introducing the research context and the significance of the subject,then discusses the topology of grid-connected single-...This paper primarily discusses the main circuit of single-phase inverter circuits.It begins by introducing the research context and the significance of the subject,then discusses the topology of grid-connected single-phase inverter circuits,continues by discussing the control strategy for grid-connected single-phase inverter circuits,realizes a sinusoidal pulse width modulation(SPWM)signal generation circuit and an inverse control algorithm program,and finally ensures good output waveform and fast dynamic response.In view of the hysteresis feature of the grid voltage’s synchronous signal sampling circuit,the acquisition function in digital signal processing(DSP)control chips is applied,and the reasons for the hysteresis phenomenon are thoroughly investigated.The reliability of the SPWM control algorithm is revealed through the results.展开更多
突发性自然灾害经常对大型工程的建筑与生产设施造成重大损失,而受损设施的维修和重建过程常出现物资供给不足、物资供给效率低以及物资分配公平性等问题。本文以某大型光伏电站为依托,从应急物资节点选址影响因素入手,建立受突发性灾...突发性自然灾害经常对大型工程的建筑与生产设施造成重大损失,而受损设施的维修和重建过程常出现物资供给不足、物资供给效率低以及物资分配公平性等问题。本文以某大型光伏电站为依托,从应急物资节点选址影响因素入手,建立受突发性灾害作用后的应急物资节点选址评价指标系统,采用AHP-CRITIC(analyt⁃ic hierarchy process-criteria importance through intercriteria correlation)组合赋权法实现应急物资存放点选址评价结果的计算。同时,基于研究区内部路网开展大型光伏场地路口至多物资存储节点的最优路径研究,并采用GIS(geographic information system)技术求解出最短运输路径。结果表明:该大型光伏场地应急物资节点选址评价结果等级为“好”与“较好”的区域主要分布在研究区北部,占总面积的33.38%;基于最短运输路径原则通过综合对比线路总长与重复路线占比,由入口3出发至各应急物资节点的路径为最优路线。研究成果可为类似大型工程的安全运营和应急管理提供技术支持和参考。展开更多
文摘To improve the operation efficiency of the photovoltaic power station complementary power generation system,an optimal allocation model of the photovoltaic power station complementary power generation capacity based on PSO-BP is proposed.Particle Swarm Optimization and BP neural network are used to establish the forecasting model,the Markov chain model is used to correct the forecasting error of the model,and the weighted fitting method is used to forecast the annual load curve,to complete the optimal allocation of complementary generating capacity of photovoltaic power stations.The experimental results show that thismethod reduces the average loss of photovoltaic output prediction,improves the prediction accuracy and recall rate of photovoltaic output prediction,and ensures the effective operation of the power system.
基金Project supported by Fundamental Research Funds for the Central Universities(Grant No.FRF-TP-20-006A2).
文摘Since it was first proposed,the space solar power station(SSPS)has attracted great attention all over the world;it is a huge space system and provides energy for Earth.Although several schemes and abundant studies on the SSPS have been proposed and conducted,it is still not realized.The reason why SSPS is still an idea is not only because it is a giant and complex project,but also due to the requirement for various excellent space materials.Among the diverse required materials,we believe energy materials are the most important.Herein,we review the space energy conversion materials for the SSPS.
文摘Distributed photovoltaic power (PV) is the main development model of distributed generation. It is necessary to research on dispatching and operation management with large-scale distributed PV connected. This paper analyzes development status, technical requirement and dispatching and operation management situation of distributed PV in Germany and China. Then introduce the preparation of distributed PV dispatching and operation management criterion. Through summarizing the experiences and lessons of large-scale distributed PV development in Germany, it gives advice to the development of distributed PV dispatching and operation management in China.
文摘Being photovoltaic power generation affected by radiation strength, wind speed, clouds cover and environment temperature, the generating in each moment is fluctuating. The operational characteristics of grid-connected PV systems are coincided with gray theory application conditions. A gray theory model has been applied in short-term forecast of grid-connected photovoltaic system. The verification model of the probability of small error will help to check the accuracy of the gray forecast results. The calculated result shows that the ?model accuracy has been greatly enhanced.
文摘This paper primarily discusses the main circuit of single-phase inverter circuits.It begins by introducing the research context and the significance of the subject,then discusses the topology of grid-connected single-phase inverter circuits,continues by discussing the control strategy for grid-connected single-phase inverter circuits,realizes a sinusoidal pulse width modulation(SPWM)signal generation circuit and an inverse control algorithm program,and finally ensures good output waveform and fast dynamic response.In view of the hysteresis feature of the grid voltage’s synchronous signal sampling circuit,the acquisition function in digital signal processing(DSP)control chips is applied,and the reasons for the hysteresis phenomenon are thoroughly investigated.The reliability of the SPWM control algorithm is revealed through the results.
文摘突发性自然灾害经常对大型工程的建筑与生产设施造成重大损失,而受损设施的维修和重建过程常出现物资供给不足、物资供给效率低以及物资分配公平性等问题。本文以某大型光伏电站为依托,从应急物资节点选址影响因素入手,建立受突发性灾害作用后的应急物资节点选址评价指标系统,采用AHP-CRITIC(analyt⁃ic hierarchy process-criteria importance through intercriteria correlation)组合赋权法实现应急物资存放点选址评价结果的计算。同时,基于研究区内部路网开展大型光伏场地路口至多物资存储节点的最优路径研究,并采用GIS(geographic information system)技术求解出最短运输路径。结果表明:该大型光伏场地应急物资节点选址评价结果等级为“好”与“较好”的区域主要分布在研究区北部,占总面积的33.38%;基于最短运输路径原则通过综合对比线路总长与重复路线占比,由入口3出发至各应急物资节点的路径为最优路线。研究成果可为类似大型工程的安全运营和应急管理提供技术支持和参考。