The grouting method applied in bored pile is an improvement to the conventional bored pile. Load tests have proved that grouting under the bored pile tip is an effective method to enhance the bearing capacity of the p...The grouting method applied in bored pile is an improvement to the conventional bored pile. Load tests have proved that grouting under the bored pile tip is an effective method to enhance the bearing capacity of the pile and to reduce the pile settlement. In this paper, the grouting technology is described and pile load test results are discussed. In order to put the grouting method into design practice, the authors analyze the working mechanism of soil compaction. And, based on the theory of cavities expansion in soil mass, approximate formulae are proposed for estimating the bearing capacity of the grouted pile. The theoretical prediction agrees well with the load test results.展开更多
A new method of detecting the vertical bearing capacity for single-pile with high strain is discussed in this paper. A heavy hammer or a small type of rocket is used to strike the pile top and the detectors are used ...A new method of detecting the vertical bearing capacity for single-pile with high strain is discussed in this paper. A heavy hammer or a small type of rocket is used to strike the pile top and the detectors are used to record vibra- tion graphs. An expression of higher degree of strain (deformation force) is introduced. It is testified theoretically that the displacement, velocity and acceleration cannot be obtained by simple integral acceleration and differential velocity when long displacement and high strain exist, namely when the pile phase generates a whole slip relative to the soil body. That is to say that there are non-linear relations between them. It is educed accordingly that the force P and displacement S are calculated from the amplitude of wave train and (dynamic) P-S curve is drew so as to determine the yield points. Further, a method of determining the vertical bearing capacity for single-pile is dis- cussed. A static load test is utilized to check the result of dynamic test and determine the correlative constants of dynamic-static P(Q)-S curve.展开更多
文摘The grouting method applied in bored pile is an improvement to the conventional bored pile. Load tests have proved that grouting under the bored pile tip is an effective method to enhance the bearing capacity of the pile and to reduce the pile settlement. In this paper, the grouting technology is described and pile load test results are discussed. In order to put the grouting method into design practice, the authors analyze the working mechanism of soil compaction. And, based on the theory of cavities expansion in soil mass, approximate formulae are proposed for estimating the bearing capacity of the grouted pile. The theoretical prediction agrees well with the load test results.
文摘A new method of detecting the vertical bearing capacity for single-pile with high strain is discussed in this paper. A heavy hammer or a small type of rocket is used to strike the pile top and the detectors are used to record vibra- tion graphs. An expression of higher degree of strain (deformation force) is introduced. It is testified theoretically that the displacement, velocity and acceleration cannot be obtained by simple integral acceleration and differential velocity when long displacement and high strain exist, namely when the pile phase generates a whole slip relative to the soil body. That is to say that there are non-linear relations between them. It is educed accordingly that the force P and displacement S are calculated from the amplitude of wave train and (dynamic) P-S curve is drew so as to determine the yield points. Further, a method of determining the vertical bearing capacity for single-pile is dis- cussed. A static load test is utilized to check the result of dynamic test and determine the correlative constants of dynamic-static P(Q)-S curve.