In this paper,the application strategy of ultrasonic detection technology in the detection of concrete foundation piles is analyzed using a construction project as an example.It includes a basic overview of the projec...In this paper,the application strategy of ultrasonic detection technology in the detection of concrete foundation piles is analyzed using a construction project as an example.It includes a basic overview of the project,an overview of ultrasonic testing technology in bridge concrete pile foundation testing,and an analysis of its practical application in the concrete pile foundation testing of this project.The objective of this analysis is to provide some reference for the application of ultrasonic testing technology and the improvement of the quality of bridge concrete pile foundation testing.展开更多
In the process of piling ,there are many various defects in foundation pile of bridge such as mud-bearing,sediment-bearing, isolation, honeycomb, broken piles, and so on, showing physical and mechanical features of lo...In the process of piling ,there are many various defects in foundation pile of bridge such as mud-bearing,sediment-bearing, isolation, honeycomb, broken piles, and so on, showing physical and mechanical features of low-density and low-intensity. In fact, by using the comprehensive detection of acoustic transmission method, the reflected wave method as well as drill coring sample method, and the rational utilization of engineering geological condition in field, the characteristics, size and location of common defects of foundation pile of bridge can be accurately detected and judged and the integrity of piles and the quality of concrete can be impersonally estimated.comprehensive detecting and analyzing methods on this kind of piles are introduced briefly. The physical characters of defects and basic features of detecting curves and their corresponding relation are emphasized, and causes are analyzed in in detail in this paper.展开更多
新建津石高速公路与既有铁路线路交汇,采用2×65 m T形刚构大节段现浇转体上跨既有铁路。考虑桥墩下部承台桩基距离既有铁路较近,通过施作防护桩、拉森钢板桩、回灌井及调整施工顺序等手段最大限度的减小对既有铁路的影响;采用水泥...新建津石高速公路与既有铁路线路交汇,采用2×65 m T形刚构大节段现浇转体上跨既有铁路。考虑桥墩下部承台桩基距离既有铁路较近,通过施作防护桩、拉森钢板桩、回灌井及调整施工顺序等手段最大限度的减小对既有铁路的影响;采用水泥搅拌桩加固地基,满足现浇梁支架地基承载要求;转体施工加强防护与监测。采用PLAXIS完成相关模拟运算,顺利完成上跨铁路转体施工,对后续类似工程有较大的参考价值。展开更多
文摘In this paper,the application strategy of ultrasonic detection technology in the detection of concrete foundation piles is analyzed using a construction project as an example.It includes a basic overview of the project,an overview of ultrasonic testing technology in bridge concrete pile foundation testing,and an analysis of its practical application in the concrete pile foundation testing of this project.The objective of this analysis is to provide some reference for the application of ultrasonic testing technology and the improvement of the quality of bridge concrete pile foundation testing.
文摘In the process of piling ,there are many various defects in foundation pile of bridge such as mud-bearing,sediment-bearing, isolation, honeycomb, broken piles, and so on, showing physical and mechanical features of low-density and low-intensity. In fact, by using the comprehensive detection of acoustic transmission method, the reflected wave method as well as drill coring sample method, and the rational utilization of engineering geological condition in field, the characteristics, size and location of common defects of foundation pile of bridge can be accurately detected and judged and the integrity of piles and the quality of concrete can be impersonally estimated.comprehensive detecting and analyzing methods on this kind of piles are introduced briefly. The physical characters of defects and basic features of detecting curves and their corresponding relation are emphasized, and causes are analyzed in in detail in this paper.
文摘新建津石高速公路与既有铁路线路交汇,采用2×65 m T形刚构大节段现浇转体上跨既有铁路。考虑桥墩下部承台桩基距离既有铁路较近,通过施作防护桩、拉森钢板桩、回灌井及调整施工顺序等手段最大限度的减小对既有铁路的影响;采用水泥搅拌桩加固地基,满足现浇梁支架地基承载要求;转体施工加强防护与监测。采用PLAXIS完成相关模拟运算,顺利完成上跨铁路转体施工,对后续类似工程有较大的参考价值。