In this paper, the two-way coupling of flow and steel pipe pile platform is simulated by ANSYS Workbench. Taking the construction platform in the deep water area of the Yangtze River Estuary as an example, the stress ...In this paper, the two-way coupling of flow and steel pipe pile platform is simulated by ANSYS Workbench. Taking the construction platform in the deep water area of the Yangtze River Estuary as an example, the stress and deformation characteristics of the steel pipe pile platform under current force are analyzed in detail. As a result, it is suggested the platform piles should be arranged regularly and the connected node de-sign of the platform structure should be strengthened to ensure the safety.展开更多
文摘In this paper, the two-way coupling of flow and steel pipe pile platform is simulated by ANSYS Workbench. Taking the construction platform in the deep water area of the Yangtze River Estuary as an example, the stress and deformation characteristics of the steel pipe pile platform under current force are analyzed in detail. As a result, it is suggested the platform piles should be arranged regularly and the connected node de-sign of the platform structure should be strengthened to ensure the safety.