This paper delves into the critical aspects of sheet pile walls in civil engineering, highlighting their versatility in soil protection, retention, and waterproofing, all while emphasizing sustainability and efficient...This paper delves into the critical aspects of sheet pile walls in civil engineering, highlighting their versatility in soil protection, retention, and waterproofing, all while emphasizing sustainability and efficient construction practices. The paper explores two fundamental approaches to sheet pile design: limit equilibrium methods and numerical techniques, with a particular focus on finite element analysis. Utilizing the robust PLAXIS 2016 calculation code based on the finite element method and employing a simplified elastoplastic model (Mohr-Coulomb), this study meticulously models the interaction between sheet pile walls and surrounding soil. The research offers valuable insights into settlement and deformation patterns that adjacent buildings may experience during various construction phases. The central objective of this paper is to present the study’s findings and recommend potential mitigation measures for settlement effects on nearby structures. By unraveling the intricate interplay between sheet pile wall construction and neighboring buildings, the paper equips engineers and practitioners to make informed decisions that ensure the safety and integrity of the built environment. In the context of the Cotonou East Corniche development, the study addresses the limitations of existing software, such as RIDO, in predicting settlements and deformations affecting nearby buildings due to the substantial load supported by sheet pile walls. This information gap necessitates a comprehensive study to assess potential impacts on adjacent structures and propose suitable mitigation measures. The research underscores the intricate dynamics between sheet pile wall construction and its influence on the local environment. It emphasizes the critical importance of proactive engineering and vigilant monitoring in managing and mitigating potential hazards to nearby buildings. To mitigate these risks, the paper recommends measures such as deep foundations, ground improvement techniques, and retrofitting. The findings presented in this study contribute significantly to the field of civil engineering and offer invaluable insights into the multifaceted dynamics of construction-induced settlement. The study underscores the importance of continuous evaluation and coordination between construction teams and building owners to effectively manage the impacts of sheet pile wall construction on adjacent structures.展开更多
As it is evident from the practice of construction and maintenance of thin retaining walls, the degree of developing of frictional forces in interlock connections of steel sheet U-shape piles essentially influences th...As it is evident from the practice of construction and maintenance of thin retaining walls, the degree of developing of frictional forces in interlock connections of steel sheet U-shape piles essentially influences the realization of the values of geometric characteristics of the piles cross-section (the moment of inertia and the section modulus) reduced to the length unit of the construction. The article offers new and simple solutions for realization and economically effective technological approaches to provide joint work of the sheet piles being considered, which improve the adequacy of design and reliability of maintenance of thin retaining walls.展开更多
为了研究航道开挖对新老护岸结构的影响,依托东宗线航道四改三工程,利用大型土工离心模型试验平台研究航道开挖对老挡墙护岸结构、新施工钢板桩的受力和变形特征的影响,得出航道开挖过程中板桩两侧土压力的分布规律。结果表明,随开挖深...为了研究航道开挖对新老护岸结构的影响,依托东宗线航道四改三工程,利用大型土工离心模型试验平台研究航道开挖对老挡墙护岸结构、新施工钢板桩的受力和变形特征的影响,得出航道开挖过程中板桩两侧土压力的分布规律。结果表明,随开挖深度增加,靠岸侧(主动侧)土压力逐渐减小;受板桩位移、变形及离心模型试验重液影响,临水侧(被动侧)土压力部分减小,底部土压力增大。开挖卸载导致老挡墙呈现向水侧移动且向后翻转的趋势。设计工况的极限开挖深度约为3.6 m,此时钢板桩顶部帽梁的水平位移达到0.069 m;对于6、8和10 m 3种长度的板桩,其极限开挖深度约为0.5~0.6倍桩长,且随着桩长增加极限开挖深度逐渐降低。研究得出不同板桩长度下开挖深度的阈值,可为工程建设提供技术参数。展开更多
Some new approaches to designing and calculation of maritime structures made of sheet piling with staggered toe are considered and discussed. Obtained results allow determination of piles spacing efficiency in stagger...Some new approaches to designing and calculation of maritime structures made of sheet piling with staggered toe are considered and discussed. Obtained results allow determination of piles spacing efficiency in staggered embedment wall. The specificity of interaction of piles in "comb" with the soil foundation Practical application is illustrated by example of calculation. regarding transition from continuous to "comb" wall is investigated.展开更多
文摘This paper delves into the critical aspects of sheet pile walls in civil engineering, highlighting their versatility in soil protection, retention, and waterproofing, all while emphasizing sustainability and efficient construction practices. The paper explores two fundamental approaches to sheet pile design: limit equilibrium methods and numerical techniques, with a particular focus on finite element analysis. Utilizing the robust PLAXIS 2016 calculation code based on the finite element method and employing a simplified elastoplastic model (Mohr-Coulomb), this study meticulously models the interaction between sheet pile walls and surrounding soil. The research offers valuable insights into settlement and deformation patterns that adjacent buildings may experience during various construction phases. The central objective of this paper is to present the study’s findings and recommend potential mitigation measures for settlement effects on nearby structures. By unraveling the intricate interplay between sheet pile wall construction and neighboring buildings, the paper equips engineers and practitioners to make informed decisions that ensure the safety and integrity of the built environment. In the context of the Cotonou East Corniche development, the study addresses the limitations of existing software, such as RIDO, in predicting settlements and deformations affecting nearby buildings due to the substantial load supported by sheet pile walls. This information gap necessitates a comprehensive study to assess potential impacts on adjacent structures and propose suitable mitigation measures. The research underscores the intricate dynamics between sheet pile wall construction and its influence on the local environment. It emphasizes the critical importance of proactive engineering and vigilant monitoring in managing and mitigating potential hazards to nearby buildings. To mitigate these risks, the paper recommends measures such as deep foundations, ground improvement techniques, and retrofitting. The findings presented in this study contribute significantly to the field of civil engineering and offer invaluable insights into the multifaceted dynamics of construction-induced settlement. The study underscores the importance of continuous evaluation and coordination between construction teams and building owners to effectively manage the impacts of sheet pile wall construction on adjacent structures.
文摘As it is evident from the practice of construction and maintenance of thin retaining walls, the degree of developing of frictional forces in interlock connections of steel sheet U-shape piles essentially influences the realization of the values of geometric characteristics of the piles cross-section (the moment of inertia and the section modulus) reduced to the length unit of the construction. The article offers new and simple solutions for realization and economically effective technological approaches to provide joint work of the sheet piles being considered, which improve the adequacy of design and reliability of maintenance of thin retaining walls.
文摘为了研究航道开挖对新老护岸结构的影响,依托东宗线航道四改三工程,利用大型土工离心模型试验平台研究航道开挖对老挡墙护岸结构、新施工钢板桩的受力和变形特征的影响,得出航道开挖过程中板桩两侧土压力的分布规律。结果表明,随开挖深度增加,靠岸侧(主动侧)土压力逐渐减小;受板桩位移、变形及离心模型试验重液影响,临水侧(被动侧)土压力部分减小,底部土压力增大。开挖卸载导致老挡墙呈现向水侧移动且向后翻转的趋势。设计工况的极限开挖深度约为3.6 m,此时钢板桩顶部帽梁的水平位移达到0.069 m;对于6、8和10 m 3种长度的板桩,其极限开挖深度约为0.5~0.6倍桩长,且随着桩长增加极限开挖深度逐渐降低。研究得出不同板桩长度下开挖深度的阈值,可为工程建设提供技术参数。
文摘Some new approaches to designing and calculation of maritime structures made of sheet piling with staggered toe are considered and discussed. Obtained results allow determination of piles spacing efficiency in staggered embedment wall. The specificity of interaction of piles in "comb" with the soil foundation Practical application is illustrated by example of calculation. regarding transition from continuous to "comb" wall is investigated.