Based on the variational approach for pile groups embedded in soil modeled using a load-transfer curve method, a practical method was conducted to estimate the settlement of symmetric pile group supported embankments....Based on the variational approach for pile groups embedded in soil modeled using a load-transfer curve method, a practical method was conducted to estimate the settlement of symmetric pile group supported embankments. The working mechanism of composite foundations improved by rigid or semi-rigid columns is analyzed by this method. Under equivalent strain conditions, the pile-soil stress ratio approaches the pile-soil modulus ratio up to a limited value of pile stiffness (Rm〈10); in the subsequent stages of high pile stiffness (Rm〉10), a further increase in the pile-soil modulus ratio cannot lead to a significant increase of stress transferred to the columns in composite foundations. The major influencing factor of the stress concentration from soil to pile in a high pile-soil modulus ratio is the padding stiffness. For the composite foundation improved by cement mixing columns, the effective column length is about 15 to 20 m and it is a more economical and effective design when the column length is less than 15 m.展开更多
Based on back analysis of lateral displacements measured in situ by using the analytical solution, a useful method for estimating stress concentration ratio of geosynthetic-reinforced and pile-supported(GRPS) embankme...Based on back analysis of lateral displacements measured in situ by using the analytical solution, a useful method for estimating stress concentration ratio of geosynthetic-reinforced and pile-supported(GRPS) embankments was proposed. In order to validate the proposed method, a full-scale high-speed railway embankment(HSRE) with four instrumented subsections over medium compressibility silty clay was constructed in three stages. The soil profile, construction procedure and monitoring of settlements and lateral displacements of the four test sections were described. The field deformation analysis results show that 1) the combined reinforcement of CFG piles and geosynthetic layer perform well in terms of reducing lateral displacements; 2) the development of lateral displacements lags behind the increase of fill load, which can be attributed to the vertical load transfer mechanism of the pile foundation; and 3) pile length has a dominant effect on the stress distribution proportion between piles and surrounding soils. The comparison between predicted and experimental results suggests that the proposed analytical solution and the back analysis-based method are capable of reasonably estimating the lateral deformation and the stress concentration ratio, respectively, if the appropriate soil elastic modulus is chosen.展开更多
In this paper,a semi-analytical method for the analysis of pile-supported embankments is proposed.The mathematic model describes the cooperative behavior of pile,pile cap,foundation soil,and embankment fills.Based on ...In this paper,a semi-analytical method for the analysis of pile-supported embankments is proposed.The mathematic model describes the cooperative behavior of pile,pile cap,foundation soil,and embankment fills.Based on Terzaghi's 1D consolidation theory of saturated soil,the consolidation of foundation soil is calculated.The embankments with two different types of piles:floating piles and end-bearing piles are investigated and discussed.The results of axial force and skin friction distributions along the pile and the settlements of pile-supported embankments are presented.It is found that it takes a longer time for soil consolidation in the embankment with floating piles,compared with the case using end-bearing piles.The differential settlement between the pile and surrounding soil at the pile top is larger for the embankment with end-bearing piles,compared with the case of floating piles.展开更多
Vehicle bumps at a bridge approach caused by the differential settlement between a bridge and an adjacent backfill embankment are one of the most difficult problems in geotechnical engineering. Large vehicle bumps mak...Vehicle bumps at a bridge approach caused by the differential settlement between a bridge and an adjacent backfill embankment are one of the most difficult problems in geotechnical engineering. Large vehicle bumps make drivers uncomfortable and cause large impact loads on vehicles and the bridge abutment. A new ground-improvement technique called fixed-geosynthetic-reinforced and pile-supported embankment(FGT embankment) was developed and used to alleviate vehicle bumps at a trial bridge-approach site located in central China. To distribute the differential settlement between the bridge and adjacent backfill embankment over a long transition zone, the following three techniques were used at the trial bridge-approach site:(a) the FGT embankment,(b) conventional geosynthetic-reinforced and pile-supported embankment(CT embankment), and(c) geosynthetic-reinforced embankment without piles(GR embankment). The performance of all three techniques in the field trial was investigated by field measurements involving earth pressure cells, geosynthetic deformation sensors, and settlement gauges. The FGT and CT embankments exhibited better performance than the GR embankment. Compared with the CT embankment, the FGT embankment was more effective at ground improvement. At an elevation of 4.0 m from the base of the embankment, the pressures below the geosynthetic were smaller than those above the geosynthetic at the closest measurement point. The difference between the pressures between above and below the geosynthetic tended to increase with the embankment height.展开更多
The performance of geosynthetic-reinforced embankments under traffic moving loads is always a hotspot in the geotechnical engineering field.A three-dimensional(3D)model of a geosynthetic-reinforced embankment without ...The performance of geosynthetic-reinforced embankments under traffic moving loads is always a hotspot in the geotechnical engineering field.A three-dimensional(3D)model of a geosynthetic-reinforced embankment without drainage consolidation was established using the finite element software ABAQUS.In this model,the traffic loads were simulated by two moving loads of rectangular pattern,and their amplitude,range,and moving speed were realized by a Fortran subroutine.The embankment fill was simulated by an equivalent linear viscoelastic model,which can reflect its viscoelasticity.The geogrid was simulated by the truss element,and the geocell was simulated by the membrane element.Infinite elements were utilized to weaken the boundary effect caused by the model geometry at the boundaries.Validation of the established numerical model was conducted by comparing the predicted deformations in the cross-section of the geosynthetic-reinforced embankment with those from the existing literature.On this basis,the dynamic stress and strain distribution in the pavement structure layer of the geosynthetic-reinforced embankment under a moving load was also analyzed.Finally,a parametric study was conducted to examine the influences of the different types of reinforcement,overload,and the moving load velocity on the geosynthetic-reinforced embankment.展开更多
Earthquake investigations have shown that near-fault pulse-like(NF-P)ground motions have unique characteristics compared to near-fault non-pulse-like(NF-NP)and far-field(FF)ground motions.It is necessary to study the ...Earthquake investigations have shown that near-fault pulse-like(NF-P)ground motions have unique characteristics compared to near-fault non-pulse-like(NF-NP)and far-field(FF)ground motions.It is necessary to study the seismic response of pile-supported wharf(PSW)structures under NF-P ground motions.In this study,a three-dimensional finite element numerical model is created to simulate a PSW.By imparting three types of ground motion,the engineering demand parameters(EDPs)of PSW under NF-P ground motions were analyzed and compared,in which EDPs are the maximum displacement and bending moment of the piles.Twenty intensity measures(IMs)were selected to characterize the properties of ground motions.The correlation between IMs and EDPs was explored.The results show that the piles present larger displacement and bending moment under NF-P ground motions compared to NF-NP and FF ground motions.None of the IMs have a high correlation with EDPs under NF-P ground motions,and these IMs are more applicable to FF ground motions.The correlation coefficients between EDPs and IMs under three types of ground motion were obtained,which will provide a valuable reference for the seismic design of PSWs.展开更多
It is of great practical value to explore the correlation between the vertical curve radius of desert highway and the increase of sand accumulation in local lines,and to select the appropriate vertical curve radius fo...It is of great practical value to explore the correlation between the vertical curve radius of desert highway and the increase of sand accumulation in local lines,and to select the appropriate vertical curve radius for reducing the risk of sand accumulation.In this study,three-dimensional models of desert highway embankments with different vertical curve radii were constructed,and Fluent software was used to simulate the wind-sand flow field and sand accumulation distribution of vertical curve embankments.The results show that:(1)Along the direction of the road,the concave and the convex vertical curve embankments have the effect of collecting and diverging the wind-sand flow,respectively.When the radius of the concave vertical curve is 3000 m,5000 m,8000 m,10000 m and 20000 m,the wind velocity in the middle of the vertical curve is 31.76%,22.58%,10.78%,10.53%and 10.44%,higher than that at both ends.When the radius of the convex vertical curve is 6500 m,8000 m,10000 m,20000 m and 30000 m,the wind velocity at both ends of the vertical curve is 14.06%,9.99%,6.14%,3.22%and 2.41%,higher than that in the middle.The diversion effect also decreases with the increase of the radius.(2)The conductivity of the concave and convex vertical curve embankments with different radii is greater than 1,which is the sediment transport roadbed.The conductivity increases with the increase of radius and gradually tends to be stable.When the radius of the concave and convex vertical curves reaches 8000 m and 20000 m respectively,the phenomenon of sand accumulation is no longer serious.Under the same radius condition,the concave vertical curve embankment is more prone to sand accumulation than the convex one.(3)Considering the strength of the collection and diversion of the vertical curve embankment with different radii,and the sand accumulation of the vertical curve embankment in the desert section of Wuma Expressway,the radius of the concave vertical curve is not less than 8000 m,and the radius of the convex vertical curve is not less than 20000 m,which can effectively reduce the sand accumulation of the vertical curve embankment.In the desert highway area,the research results of this paper can provide reference for the design of vertical curve to ensure the safe operation of desert highway.展开更多
Reliable long-term settlement prediction of a high embankment relates to mountain infrastructure safety.This study developed a novel hybrid model(NHM)that combines a joint denoising technique with an enhanced gray wol...Reliable long-term settlement prediction of a high embankment relates to mountain infrastructure safety.This study developed a novel hybrid model(NHM)that combines a joint denoising technique with an enhanced gray wolf optimizer(EGWO)-n-support vector regression(n-SVR)method.High-embankment field measurements were preprocessed using the joint denoising technique,which in-cludes complete ensemble empirical mode decomposition,singular value decomposition,and wavelet packet transform.Furthermore,high-embankment settlements were predicted using the EGWO-n-SVR method.In this method,the standard gray wolf optimizer(GWO)was improved to obtain the EGWO to better tune the n-SVR model hyperparameters.The proposed NHM was then tested in two case studies.Finally,the influences of the data division ratio and kernel function on the EGWO-n-SVR forecasting performance and prediction efficiency were investigated.The results indicate that the NHM suppresses noise and restores details in high-embankment field measurements.Simultaneously,the NHM out-performs other alternative prediction methods in prediction accuracy and robustness.This demonstrates that the proposed NHM is effective in predicting high-embankment settlements with noisy field mea-surements.Moreover,the appropriate data division ratio and kernel function for EGWO-n-SVR are 7:3 and radial basis function,respectively.展开更多
Slope failures due to heavy or prolonged rain have been occurring frequently in Japan in recent years.In railway embankments,even small-scale surface collapse can result in track deformation.Currently,train operation ...Slope failures due to heavy or prolonged rain have been occurring frequently in Japan in recent years.In railway embankments,even small-scale surface collapse can result in track deformation.Currently,train operation during rainy periods is regulated according to empirical rules based on rainfall and disaster history.However,the validity of operation regulations is lacking because the rainfall infiltration circumstances inside the slope are unknown.We have been attempting to understand rainfall infiltration in railway embankments by applying a method of predicting surface collapse from observations of volumetric water content in the soil.We used previous field monitoring and model experiments to propose a method for easily understanding the state of rainfall infiltration in the surface layer of an embankment using the relative history of volumetric water content at different depths.In this study,we applied this simple determination method to railway embankments with different topography and geological environments to demonstrate the versatility of the method.展开更多
Geosynthetic-reinforced and pile-supported (GRPS) embankment has been increasingly constructed in a large number of regions and for a wide range of projects in the past decades. However, many disadvantages are expos...Geosynthetic-reinforced and pile-supported (GRPS) embankment has been increasingly constructed in a large number of regions and for a wide range of projects in the past decades. However, many disadvantages are exposed through a lot of applications on conventional technique of GRPS embankment (called CT embankment), i.e., intolerable settlement and lateral displacement, low geosynthetic efficiency, etc. In view of these disadvantages, the fixed geosynthetic technique of GRPS embankment (called FGT embankment) is developed in this work. In this system, the geosynthetic is fixed on the pile head by the steel bar fulcrum and concrete fixed top. The principles and construction techniques involved in the FGT embankment are described firstly. Then, the numerical analysis method and two-stage analysis method are used to study the performance of FGT embankment, respectively. It is shown that the FGT embankment can provide a better improvement technique to construct a high embankment over soft ground.展开更多
In order to analyze the initial cracking behavior of highway embankment in the regions of expansive soil, the changes in peaks of tensile stress and their location on top of the embankment for a typical highway embank...In order to analyze the initial cracking behavior of highway embankment in the regions of expansive soil, the changes in peaks of tensile stress and their location on top of the embankment for a typical highway embankment section were simulated by ABAQUS. The simulation results indicate that the matric suction was a concave distribution on top of the expansive soil foundation and that it induced differential deformation of foundation and embankment. The peaks of tensile stress on top of the embankment are not located at a fixed site, but gradually move towards the shoulder following the evaporation duration. When the evaporation intensity is larger, the peak of tensile stress on top of embankment increases at a faster rate following the evaporation duration,and its location is closer to the shoulder. The thicker expansive soil layer helps the peaks of tensile stress to reach the critical tensile stress quickly, but the embankment cannot crack when the expansive soil layer is no more than 1.5m after 30d soil surface evaporation; the higher the embankment, the smaller the peak of tensile stress occurring on top of the highway embankment, and its location will be further away from the shoulder. Therefore, a higher embankment constructed on a thinner expansive soil layer can reduce the crack generation within the highway embankment.展开更多
Based on analysis of additional horizontal stress in the soil underembankment load, the behavior of the lateral deformation of the soil along the depth is studied. Theresult shows that the distribution of lateral defo...Based on analysis of additional horizontal stress in the soil underembankment load, the behavior of the lateral deformation of the soil along the depth is studied. Theresult shows that the distribution of lateral deformation along the depth is arch-shaped, whichcorresponds nicely with the observed data. According to this, a new prediction model is establishedto forecast the lateral deformation. The shapes of the model curve with three parameters in themodel a, b and c are presented. The three parameters can easily be determined by three measured data(s_0, 0), (s_1, h_0)and (s_2, 2h_0). This model is applied to study two cases. The comparisonsillustrate that the displacement predicted by the model corresponds nicely with the measured data.展开更多
The reinforcement effects of geosynthetics in thick soft subsoil case and thin soft subsoil case are studied in this paper,and a Duncan Chang nonlinear numerical model based on the finite element method (FEM) is deve...The reinforcement effects of geosynthetics in thick soft subsoil case and thin soft subsoil case are studied in this paper,and a Duncan Chang nonlinear numerical model based on the finite element method (FEM) is developed.Moreover,an important conclusion that the thickness of soft subsoil affects greatly the geotechnical behavior of geosynthetic reinforced embankments is drawn.A series of embankment built on soft subsoil is calculated using the FEM program.The results of the computer program,such as the lateral displacements,settlements,and stress level and shear stresses in the subsoil,are presented in great detail and the comparison of those results disposes clearly the huge discrepancy of reinforce benefit between the thick subsoil embankment and thin subsoil embankment.Reinforcement mechanism of geosynthetics is also discussed in this paper and several conclusions are reached.This paper also gives recommendations for design.展开更多
Ecological embankment is a new bank protection technique.The present domestic and international studies on ecological embankment mainly focus on its definition,type,implementation procedures,problems as well as attent...Ecological embankment is a new bank protection technique.The present domestic and international studies on ecological embankment mainly focus on its definition,type,implementation procedures,problems as well as attentions.The authors put forward an evaluation method based on Group Analytic Hierarchy Process(GAHP) to establish an evaluation index system,comprehensively evaluate late works of a project,and prove the rationality of the model.展开更多
Piled embankments,which offer many advantages,are increasingly popular in construction of high-speed railways in China.Although the performance of piled embankment under static loading is well-known,the behavior under...Piled embankments,which offer many advantages,are increasingly popular in construction of high-speed railways in China.Although the performance of piled embankment under static loading is well-known,the behavior under the dynamic train load of a high-speed railway is not yet understood.In light of this,a heavily instrumented piled embankment model was set up,and a model test was carried out,in which a servo-hydraulic actuator outputting M-shaped waves was adopted to simulate the process of a running train.Earth pressure,settlement,strain in the geogrid and pile and excess pore water pressure were measured.The results show that the soil arching height under the dynamic train load of a high-speed railway is shorter than under static loading.The growth trend for accumulated settlement slowed down after long-term vibration although there was still a tendency for it to increase.Accumulated geogrid strain has an increasing tendency after long-term vibration.The closer the embankment edge,the greater the geogrid strain over the subsoil.Strains in the pile were smaller under dynamic train loads,and their distribution was different from that under static loading.At the same elevation,excess pore water pressure under the track slab was greater than that under the embankment shoulder.展开更多
The objective of this work is to compare the responses of geosynthetically-reinforced embankment and unreinforced embankment due to road widening by using the centrifuge model tests and a two-dimensional(2D) finite el...The objective of this work is to compare the responses of geosynthetically-reinforced embankment and unreinforced embankment due to road widening by using the centrifuge model tests and a two-dimensional(2D) finite element(FE) model. The measured and calculated responses of the embankment and foundation exposed to road widening include the settlement,horizontal displacement,pore water pressure,and shear stresses. It is found that the road widening changed the transverse slope of the original pavement surface resulting from the nonuniform settlements. The maximum horizontal movement is found to be located at the shoulder of the original embankment. Although the difference is small,it is clearly seen that the geosynthetic reinforcement reduces the nonuniform settlements and horizontal movements due to road widening. Thus the reinforcement reduces the potential of pavement cracking and increases the stability of the embankment on soft ground in road widening.展开更多
For the purpose of enhancing air convection and controlling solar radiation, a new crushed-rock slope embankment design combined with a sun-shade measure is proposed. A newly designed embankment was constructed in the...For the purpose of enhancing air convection and controlling solar radiation, a new crushed-rock slope embankment design combined with a sun-shade measure is proposed. A newly designed embankment was constructed in the Tuotuohe section of the Qinghai-Tibet Railway and a field-testing experiment was carried out to determine its convection and temperature characteristics. The results show that distinct air convection occurred in the crushed-rock layer of the new embankment, especially in cold seasons, which was enhanced when it flowed upwards along the slope. This preliminarily indicated that the new design of the embankment slope was good for reinforcing air convection in the crushed-rock layer. The frequent fluctuations of the convection speed and the environmental wind speed were in good agreement, suggesting that the convection in the crushed rock primarily came from the ambient wind. It was also preliminarily determined that the new embankment had a better cooling effect and sun-shade effect for decreasing the temperature of the embankment slope compared with a traditional crushed-rock slope embankment, and the mean temperature difference between them was up to 1.7 °C. The mean annual temperature at the bottom boundary of the crushed-rock layer was obviously lower than that at the top boundary, and heat flux calculation showed that the shallow soil beneath the embankment slope was weakly releasing heat, all of which indicated that the new embankment slope design was beneficial to the thermal stability of the embankment. This study is helpful in providing some references for improved engineering design and maintenance of roadbeds in permafrost regions.展开更多
The formation of thawed interlayer beneath embankment can result in embankment settlement in permafrost regions. Based on the data on ground temperatures and deformations beneath the embankment, observed in-situ along...The formation of thawed interlayer beneath embankment can result in embankment settlement in permafrost regions. Based on the data on ground temperatures and deformations beneath the embankment, observed in-situ along the QinghaiTibet Railway in permafrost regions from 2006 to2013, characteristics of the thawed interlayer beneath the embankment and its influence on the embankment settlement are studied. The results indicate that the thawed interlayer hardly forms beneath the natural field, and beneath the embankments from the Qinghai-Tibet Railway the thawed interlayer develops widely, and it can be refrozen totally in the regions with lower mean annual ground temperature, and developed further in the regions with higher mean annual ground temperature.The thawed interlayer is closely related to the embankment settlement. The ice content of permafrost underlying the thawed interlayer influences the settlement of embankment. The higher the ice content is, the larger the settlement is, and vice versa. The increase in thickness of thawed interlayer mainly results from the decline of artificial permafrost table in high-temperature permafrost regions.展开更多
Based on the vehicle track coupling dynamics theory, a new spatial dynamic numerical model of vehicle track subgrade coupling system was established considering the interaction among different structural layers in the...Based on the vehicle track coupling dynamics theory, a new spatial dynamic numerical model of vehicle track subgrade coupling system was established considering the interaction among different structural layers in the subgrade system. The dynamic responses of the coupled system were analyzed when the speed of train was 350 km/h and the transition was filled with graded broken stones mixed with 5% cement. The results indicate that the setting form of bridge-approach embankment section has little effect on the dynamic responses, thus designers can choose it on account of the practical circumstances. Because the location about 5 m from the bridge abutment has the greatest deformation, the stiffness within 0 5 m zone behind the abutment should be specially designed. The results of the study from vehicle track dynamics show that the maximum allowable track deflection angle should be 0.09% and the coefficient of subgrade reaction(K30) is greater than 190 MPa within the 0 5 m zone behind the abutment and greater than 150 MPa in other zones.展开更多
Two and three-dimensional finite element analysis programs for pile-soil interaction are compiled. Duncan-Chang's Model is used. The construction sequence of the pier is modeled. The pile-soil interface element is...Two and three-dimensional finite element analysis programs for pile-soil interaction are compiled. Duncan-Chang's Model is used. The construction sequence of the pier is modeled. The pile-soil interface element is used. The influence of the combination type of piles on the deformation of bank slope and pile behaviour is analyzed. Different designs of a pile-supported pier are compared thoroughly. Calculation results show that the stresses and displacements of the pile are directly related to the distance from the bank slope and the direction of inclination. An inclined prop pile set in the rear platform would remarkably reduce the stresses of piles and the displacement of the pier.展开更多
文摘Based on the variational approach for pile groups embedded in soil modeled using a load-transfer curve method, a practical method was conducted to estimate the settlement of symmetric pile group supported embankments. The working mechanism of composite foundations improved by rigid or semi-rigid columns is analyzed by this method. Under equivalent strain conditions, the pile-soil stress ratio approaches the pile-soil modulus ratio up to a limited value of pile stiffness (Rm〈10); in the subsequent stages of high pile stiffness (Rm〉10), a further increase in the pile-soil modulus ratio cannot lead to a significant increase of stress transferred to the columns in composite foundations. The major influencing factor of the stress concentration from soil to pile in a high pile-soil modulus ratio is the padding stiffness. For the composite foundation improved by cement mixing columns, the effective column length is about 15 to 20 m and it is a more economical and effective design when the column length is less than 15 m.
基金Project(2010G003-F)supported by Technological Research and Development Programs of the Ministry of Railways,China
文摘Based on back analysis of lateral displacements measured in situ by using the analytical solution, a useful method for estimating stress concentration ratio of geosynthetic-reinforced and pile-supported(GRPS) embankments was proposed. In order to validate the proposed method, a full-scale high-speed railway embankment(HSRE) with four instrumented subsections over medium compressibility silty clay was constructed in three stages. The soil profile, construction procedure and monitoring of settlements and lateral displacements of the four test sections were described. The field deformation analysis results show that 1) the combined reinforcement of CFG piles and geosynthetic layer perform well in terms of reducing lateral displacements; 2) the development of lateral displacements lags behind the increase of fill load, which can be attributed to the vertical load transfer mechanism of the pile foundation; and 3) pile length has a dominant effect on the stress distribution proportion between piles and surrounding soils. The comparison between predicted and experimental results suggests that the proposed analytical solution and the back analysis-based method are capable of reasonably estimating the lateral deformation and the stress concentration ratio, respectively, if the appropriate soil elastic modulus is chosen.
基金Project supported by the Research Committee of the University of Macao (Nos. MYRG189(Y2-L3)-FST11-ZWH and MYRG067(Y1-L2)-FST12-ZWH),Macao SAR,China
文摘In this paper,a semi-analytical method for the analysis of pile-supported embankments is proposed.The mathematic model describes the cooperative behavior of pile,pile cap,foundation soil,and embankment fills.Based on Terzaghi's 1D consolidation theory of saturated soil,the consolidation of foundation soil is calculated.The embankments with two different types of piles:floating piles and end-bearing piles are investigated and discussed.The results of axial force and skin friction distributions along the pile and the settlements of pile-supported embankments are presented.It is found that it takes a longer time for soil consolidation in the embankment with floating piles,compared with the case using end-bearing piles.The differential settlement between the pile and surrounding soil at the pile top is larger for the embankment with end-bearing piles,compared with the case of floating piles.
基金supported by the National Natural Science Foundation of China(Grant No.51278216)the Research Fund of the Key Laboratory of Transportation Tunnel Engineering+1 种基金Ministry of Education(Grant No.TTE2014-05)the Basic Research Program in Shanxi Province(Grant No.2014021033-1)
文摘Vehicle bumps at a bridge approach caused by the differential settlement between a bridge and an adjacent backfill embankment are one of the most difficult problems in geotechnical engineering. Large vehicle bumps make drivers uncomfortable and cause large impact loads on vehicles and the bridge abutment. A new ground-improvement technique called fixed-geosynthetic-reinforced and pile-supported embankment(FGT embankment) was developed and used to alleviate vehicle bumps at a trial bridge-approach site located in central China. To distribute the differential settlement between the bridge and adjacent backfill embankment over a long transition zone, the following three techniques were used at the trial bridge-approach site:(a) the FGT embankment,(b) conventional geosynthetic-reinforced and pile-supported embankment(CT embankment), and(c) geosynthetic-reinforced embankment without piles(GR embankment). The performance of all three techniques in the field trial was investigated by field measurements involving earth pressure cells, geosynthetic deformation sensors, and settlement gauges. The FGT and CT embankments exhibited better performance than the GR embankment. Compared with the CT embankment, the FGT embankment was more effective at ground improvement. At an elevation of 4.0 m from the base of the embankment, the pressures below the geosynthetic were smaller than those above the geosynthetic at the closest measurement point. The difference between the pressures between above and below the geosynthetic tended to increase with the embankment height.
基金This research was funded through the National Natural Science Foundation of China(Grant Nos.52108299 and 52178312)the China Postdoctoral Science Foundation(Grant No.2021M693740)the Basal Research Fund Support by Chongqing University.
文摘The performance of geosynthetic-reinforced embankments under traffic moving loads is always a hotspot in the geotechnical engineering field.A three-dimensional(3D)model of a geosynthetic-reinforced embankment without drainage consolidation was established using the finite element software ABAQUS.In this model,the traffic loads were simulated by two moving loads of rectangular pattern,and their amplitude,range,and moving speed were realized by a Fortran subroutine.The embankment fill was simulated by an equivalent linear viscoelastic model,which can reflect its viscoelasticity.The geogrid was simulated by the truss element,and the geocell was simulated by the membrane element.Infinite elements were utilized to weaken the boundary effect caused by the model geometry at the boundaries.Validation of the established numerical model was conducted by comparing the predicted deformations in the cross-section of the geosynthetic-reinforced embankment with those from the existing literature.On this basis,the dynamic stress and strain distribution in the pavement structure layer of the geosynthetic-reinforced embankment under a moving load was also analyzed.Finally,a parametric study was conducted to examine the influences of the different types of reinforcement,overload,and the moving load velocity on the geosynthetic-reinforced embankment.
基金National Natural Science Foundation of China under Grant Nos.42072310 and 51808307。
文摘Earthquake investigations have shown that near-fault pulse-like(NF-P)ground motions have unique characteristics compared to near-fault non-pulse-like(NF-NP)and far-field(FF)ground motions.It is necessary to study the seismic response of pile-supported wharf(PSW)structures under NF-P ground motions.In this study,a three-dimensional finite element numerical model is created to simulate a PSW.By imparting three types of ground motion,the engineering demand parameters(EDPs)of PSW under NF-P ground motions were analyzed and compared,in which EDPs are the maximum displacement and bending moment of the piles.Twenty intensity measures(IMs)were selected to characterize the properties of ground motions.The correlation between IMs and EDPs was explored.The results show that the piles present larger displacement and bending moment under NF-P ground motions compared to NF-NP and FF ground motions.None of the IMs have a high correlation with EDPs under NF-P ground motions,and these IMs are more applicable to FF ground motions.The correlation coefficients between EDPs and IMs under three types of ground motion were obtained,which will provide a valuable reference for the seismic design of PSWs.
基金The research described in this paper was financially supported by Youth Science Foundation Project’Research on Failure Mechanism and Evaluation Method of Sand Control Measures for Railway Machinery in Sandy Area’(12302511)Ningxia Transportation Department Science and Technology Project(20200173)Central guide local science and technology development funds(22ZY1QA005)。
文摘It is of great practical value to explore the correlation between the vertical curve radius of desert highway and the increase of sand accumulation in local lines,and to select the appropriate vertical curve radius for reducing the risk of sand accumulation.In this study,three-dimensional models of desert highway embankments with different vertical curve radii were constructed,and Fluent software was used to simulate the wind-sand flow field and sand accumulation distribution of vertical curve embankments.The results show that:(1)Along the direction of the road,the concave and the convex vertical curve embankments have the effect of collecting and diverging the wind-sand flow,respectively.When the radius of the concave vertical curve is 3000 m,5000 m,8000 m,10000 m and 20000 m,the wind velocity in the middle of the vertical curve is 31.76%,22.58%,10.78%,10.53%and 10.44%,higher than that at both ends.When the radius of the convex vertical curve is 6500 m,8000 m,10000 m,20000 m and 30000 m,the wind velocity at both ends of the vertical curve is 14.06%,9.99%,6.14%,3.22%and 2.41%,higher than that in the middle.The diversion effect also decreases with the increase of the radius.(2)The conductivity of the concave and convex vertical curve embankments with different radii is greater than 1,which is the sediment transport roadbed.The conductivity increases with the increase of radius and gradually tends to be stable.When the radius of the concave and convex vertical curves reaches 8000 m and 20000 m respectively,the phenomenon of sand accumulation is no longer serious.Under the same radius condition,the concave vertical curve embankment is more prone to sand accumulation than the convex one.(3)Considering the strength of the collection and diversion of the vertical curve embankment with different radii,and the sand accumulation of the vertical curve embankment in the desert section of Wuma Expressway,the radius of the concave vertical curve is not less than 8000 m,and the radius of the convex vertical curve is not less than 20000 m,which can effectively reduce the sand accumulation of the vertical curve embankment.In the desert highway area,the research results of this paper can provide reference for the design of vertical curve to ensure the safe operation of desert highway.
基金We acknowledge the funding support from the National Natural Science Foundation of China(Grant No.51808462)the Natural Science Foundation Project of Sichuan Province,China(Grant No.2023NSFSC0346)the Science and Technology Project of Inner Mongolia Transportation Department,China(Grant No.NJ-2022-14).
文摘Reliable long-term settlement prediction of a high embankment relates to mountain infrastructure safety.This study developed a novel hybrid model(NHM)that combines a joint denoising technique with an enhanced gray wolf optimizer(EGWO)-n-support vector regression(n-SVR)method.High-embankment field measurements were preprocessed using the joint denoising technique,which in-cludes complete ensemble empirical mode decomposition,singular value decomposition,and wavelet packet transform.Furthermore,high-embankment settlements were predicted using the EGWO-n-SVR method.In this method,the standard gray wolf optimizer(GWO)was improved to obtain the EGWO to better tune the n-SVR model hyperparameters.The proposed NHM was then tested in two case studies.Finally,the influences of the data division ratio and kernel function on the EGWO-n-SVR forecasting performance and prediction efficiency were investigated.The results indicate that the NHM suppresses noise and restores details in high-embankment field measurements.Simultaneously,the NHM out-performs other alternative prediction methods in prediction accuracy and robustness.This demonstrates that the proposed NHM is effective in predicting high-embankment settlements with noisy field mea-surements.Moreover,the appropriate data division ratio and kernel function for EGWO-n-SVR are 7:3 and radial basis function,respectively.
文摘Slope failures due to heavy or prolonged rain have been occurring frequently in Japan in recent years.In railway embankments,even small-scale surface collapse can result in track deformation.Currently,train operation during rainy periods is regulated according to empirical rules based on rainfall and disaster history.However,the validity of operation regulations is lacking because the rainfall infiltration circumstances inside the slope are unknown.We have been attempting to understand rainfall infiltration in railway embankments by applying a method of predicting surface collapse from observations of volumetric water content in the soil.We used previous field monitoring and model experiments to propose a method for easily understanding the state of rainfall infiltration in the surface layer of an embankment using the relative history of volumetric water content at different depths.In this study,we applied this simple determination method to railway embankments with different topography and geological environments to demonstrate the versatility of the method.
基金Foundation item: Project(51278216) supported by the National Natural Science Foundation of China Project(11-2-05) supported by the Scientific and Technological Project for Shanxi Communication Construction, China Project(HF-08-01-2011-240) supported by the Graduates' Innovation Fund of Huazhong University of Science and Technology, China
文摘Geosynthetic-reinforced and pile-supported (GRPS) embankment has been increasingly constructed in a large number of regions and for a wide range of projects in the past decades. However, many disadvantages are exposed through a lot of applications on conventional technique of GRPS embankment (called CT embankment), i.e., intolerable settlement and lateral displacement, low geosynthetic efficiency, etc. In view of these disadvantages, the fixed geosynthetic technique of GRPS embankment (called FGT embankment) is developed in this work. In this system, the geosynthetic is fixed on the pile head by the steel bar fulcrum and concrete fixed top. The principles and construction techniques involved in the FGT embankment are described firstly. Then, the numerical analysis method and two-stage analysis method are used to study the performance of FGT embankment, respectively. It is shown that the FGT embankment can provide a better improvement technique to construct a high embankment over soft ground.
基金The National Natural Science Foundation of China(No.51378121)
文摘In order to analyze the initial cracking behavior of highway embankment in the regions of expansive soil, the changes in peaks of tensile stress and their location on top of the embankment for a typical highway embankment section were simulated by ABAQUS. The simulation results indicate that the matric suction was a concave distribution on top of the expansive soil foundation and that it induced differential deformation of foundation and embankment. The peaks of tensile stress on top of the embankment are not located at a fixed site, but gradually move towards the shoulder following the evaporation duration. When the evaporation intensity is larger, the peak of tensile stress on top of embankment increases at a faster rate following the evaporation duration,and its location is closer to the shoulder. The thicker expansive soil layer helps the peaks of tensile stress to reach the critical tensile stress quickly, but the embankment cannot crack when the expansive soil layer is no more than 1.5m after 30d soil surface evaporation; the higher the embankment, the smaller the peak of tensile stress occurring on top of the highway embankment, and its location will be further away from the shoulder. Therefore, a higher embankment constructed on a thinner expansive soil layer can reduce the crack generation within the highway embankment.
文摘Based on analysis of additional horizontal stress in the soil underembankment load, the behavior of the lateral deformation of the soil along the depth is studied. Theresult shows that the distribution of lateral deformation along the depth is arch-shaped, whichcorresponds nicely with the observed data. According to this, a new prediction model is establishedto forecast the lateral deformation. The shapes of the model curve with three parameters in themodel a, b and c are presented. The three parameters can easily be determined by three measured data(s_0, 0), (s_1, h_0)and (s_2, 2h_0). This model is applied to study two cases. The comparisonsillustrate that the displacement predicted by the model corresponds nicely with the measured data.
文摘The reinforcement effects of geosynthetics in thick soft subsoil case and thin soft subsoil case are studied in this paper,and a Duncan Chang nonlinear numerical model based on the finite element method (FEM) is developed.Moreover,an important conclusion that the thickness of soft subsoil affects greatly the geotechnical behavior of geosynthetic reinforced embankments is drawn.A series of embankment built on soft subsoil is calculated using the FEM program.The results of the computer program,such as the lateral displacements,settlements,and stress level and shear stresses in the subsoil,are presented in great detail and the comparison of those results disposes clearly the huge discrepancy of reinforce benefit between the thick subsoil embankment and thin subsoil embankment.Reinforcement mechanism of geosynthetics is also discussed in this paper and several conclusions are reached.This paper also gives recommendations for design.
文摘Ecological embankment is a new bank protection technique.The present domestic and international studies on ecological embankment mainly focus on its definition,type,implementation procedures,problems as well as attentions.The authors put forward an evaluation method based on Group Analytic Hierarchy Process(GAHP) to establish an evaluation index system,comprehensively evaluate late works of a project,and prove the rationality of the model.
基金National Natural Science Foundation of China under Grant Nos.51622803,51378177 and 51420105013the 111 Project under Grant No.B13024
文摘Piled embankments,which offer many advantages,are increasingly popular in construction of high-speed railways in China.Although the performance of piled embankment under static loading is well-known,the behavior under the dynamic train load of a high-speed railway is not yet understood.In light of this,a heavily instrumented piled embankment model was set up,and a model test was carried out,in which a servo-hydraulic actuator outputting M-shaped waves was adopted to simulate the process of a running train.Earth pressure,settlement,strain in the geogrid and pile and excess pore water pressure were measured.The results show that the soil arching height under the dynamic train load of a high-speed railway is shorter than under static loading.The growth trend for accumulated settlement slowed down after long-term vibration although there was still a tendency for it to increase.Accumulated geogrid strain has an increasing tendency after long-term vibration.The closer the embankment edge,the greater the geogrid strain over the subsoil.Strains in the pile were smaller under dynamic train loads,and their distribution was different from that under static loading.At the same elevation,excess pore water pressure under the track slab was greater than that under the embankment shoulder.
基金Project(200231800032) supported by Research on Transportation Construction in Western, China
文摘The objective of this work is to compare the responses of geosynthetically-reinforced embankment and unreinforced embankment due to road widening by using the centrifuge model tests and a two-dimensional(2D) finite element(FE) model. The measured and calculated responses of the embankment and foundation exposed to road widening include the settlement,horizontal displacement,pore water pressure,and shear stresses. It is found that the road widening changed the transverse slope of the original pavement surface resulting from the nonuniform settlements. The maximum horizontal movement is found to be located at the shoulder of the original embankment. Although the difference is small,it is clearly seen that the geosynthetic reinforcement reduces the nonuniform settlements and horizontal movements due to road widening. Thus the reinforcement reduces the potential of pavement cracking and increases the stability of the embankment on soft ground in road widening.
基金supported by the Western Project Program of the Chinese Academy of Sciences (No. KZCX2-XB3-19)the National Key Basic Research Program of China, 973 Program (No. 2012CB026101)
文摘For the purpose of enhancing air convection and controlling solar radiation, a new crushed-rock slope embankment design combined with a sun-shade measure is proposed. A newly designed embankment was constructed in the Tuotuohe section of the Qinghai-Tibet Railway and a field-testing experiment was carried out to determine its convection and temperature characteristics. The results show that distinct air convection occurred in the crushed-rock layer of the new embankment, especially in cold seasons, which was enhanced when it flowed upwards along the slope. This preliminarily indicated that the new design of the embankment slope was good for reinforcing air convection in the crushed-rock layer. The frequent fluctuations of the convection speed and the environmental wind speed were in good agreement, suggesting that the convection in the crushed rock primarily came from the ambient wind. It was also preliminarily determined that the new embankment had a better cooling effect and sun-shade effect for decreasing the temperature of the embankment slope compared with a traditional crushed-rock slope embankment, and the mean temperature difference between them was up to 1.7 °C. The mean annual temperature at the bottom boundary of the crushed-rock layer was obviously lower than that at the top boundary, and heat flux calculation showed that the shallow soil beneath the embankment slope was weakly releasing heat, all of which indicated that the new embankment slope design was beneficial to the thermal stability of the embankment. This study is helpful in providing some references for improved engineering design and maintenance of roadbeds in permafrost regions.
基金supported by the National Natural Science Foundation of China(Grant Nos.41571064,41630636 and 41471061)the Independent Research of the State Key Laboratory of Frozen Soil Engineering(SKLFSE-ZT-09)
文摘The formation of thawed interlayer beneath embankment can result in embankment settlement in permafrost regions. Based on the data on ground temperatures and deformations beneath the embankment, observed in-situ along the QinghaiTibet Railway in permafrost regions from 2006 to2013, characteristics of the thawed interlayer beneath the embankment and its influence on the embankment settlement are studied. The results indicate that the thawed interlayer hardly forms beneath the natural field, and beneath the embankments from the Qinghai-Tibet Railway the thawed interlayer develops widely, and it can be refrozen totally in the regions with lower mean annual ground temperature, and developed further in the regions with higher mean annual ground temperature.The thawed interlayer is closely related to the embankment settlement. The ice content of permafrost underlying the thawed interlayer influences the settlement of embankment. The higher the ice content is, the larger the settlement is, and vice versa. The increase in thickness of thawed interlayer mainly results from the decline of artificial permafrost table in high-temperature permafrost regions.
基金Project(41030742) supported by the National Natural Science Foundation of ChinaProject(2009G010-c) supported by the Technological Research and Development Programs of the Ministry of Railways,China
文摘Based on the vehicle track coupling dynamics theory, a new spatial dynamic numerical model of vehicle track subgrade coupling system was established considering the interaction among different structural layers in the subgrade system. The dynamic responses of the coupled system were analyzed when the speed of train was 350 km/h and the transition was filled with graded broken stones mixed with 5% cement. The results indicate that the setting form of bridge-approach embankment section has little effect on the dynamic responses, thus designers can choose it on account of the practical circumstances. Because the location about 5 m from the bridge abutment has the greatest deformation, the stiffness within 0 5 m zone behind the abutment should be specially designed. The results of the study from vehicle track dynamics show that the maximum allowable track deflection angle should be 0.09% and the coefficient of subgrade reaction(K30) is greater than 190 MPa within the 0 5 m zone behind the abutment and greater than 150 MPa in other zones.
基金This work was financially supported by the National Natural Science Foundation of China
文摘Two and three-dimensional finite element analysis programs for pile-soil interaction are compiled. Duncan-Chang's Model is used. The construction sequence of the pier is modeled. The pile-soil interface element is used. The influence of the combination type of piles on the deformation of bank slope and pile behaviour is analyzed. Different designs of a pile-supported pier are compared thoroughly. Calculation results show that the stresses and displacements of the pile are directly related to the distance from the bank slope and the direction of inclination. An inclined prop pile set in the rear platform would remarkably reduce the stresses of piles and the displacement of the pier.