It is inevitable to cut reinforced concrete(RC)appeared in cross passage of city metro by cutting tools when constructing in densely populated area.The previous cutters employed to cut RC are insufficient and easily d...It is inevitable to cut reinforced concrete(RC)appeared in cross passage of city metro by cutting tools when constructing in densely populated area.The previous cutters employed to cut RC are insufficient and easily damaged,so a new polycrystalline diamond compact(PDC)cutter is used to solve this question.Based on the theoretical analysis of cutting mechanism,both circular and tapered PDC cutters with cutting edge angle of 90and negative front rack angle of 10are used to cut RC.The peeling and breaking patterns of cutting concrete are proposed,the nodular and grainy chips are the preferred modes in cutting steel bars.The LS-DYNA is employed to investigate the cutting performance in advance.The simulation results show that the average and peak cutting forces increase with the growth of penetration depth,cutting speed,and roundness,and subsequently the recommended penetration depth less than 1.2 mm is obtained to cut RC due to the existence of steel bars.Moreover,the linear cutting platform is adopted to investigate the force ability and damage state of PDC cutters.It is concluded that the cutting force increases abruptly and fluctuates heavily when cutting the coarse aggregates.The patterns occurred in both numerical and experimental results are generally similar.Notably,the steel bar is pulled out and the PDC cutter is damaged at the penetration depth of 0.8 mm,while a good cut occurs at the penetration depth of 0.3 mm.The tapered PDC cutter with a relatively low cutting force is prone to be broken compared with circular PDC cutter.It is suggested that the circular PDC cutter at the penetration depth of 0.3 mm should be used to cut RC in practical engineering.展开更多
1 Project overview The Shasan station of Phase II of Shenzhen’s urban rail transit Line 12 is situated in Bao’an District,Shenzhen.It comprises a two-level underground island platform station,measuring 212 m in leng...1 Project overview The Shasan station of Phase II of Shenzhen’s urban rail transit Line 12 is situated in Bao’an District,Shenzhen.It comprises a two-level underground island platform station,measuring 212 m in length,and 22.6 m in width,with an overburden thickness of about 7.0 m.Fig.1 illustrates the presence of a large underground reinforced concrete stormwater culvert,measuring 11.5 m by 3.6 m,traversing the station’s center.展开更多
基金supported by the Shanghai Science and Technology Development Funds(Grant No.20QB1401800)Xuzhou Science and Technology Plan Social Development Key Special Project(Grant No.SHFZZDZX20210017)Yunlong Lake Laboratory of Deep Underground Science and Engineering Project(Grant No.104023006).
文摘It is inevitable to cut reinforced concrete(RC)appeared in cross passage of city metro by cutting tools when constructing in densely populated area.The previous cutters employed to cut RC are insufficient and easily damaged,so a new polycrystalline diamond compact(PDC)cutter is used to solve this question.Based on the theoretical analysis of cutting mechanism,both circular and tapered PDC cutters with cutting edge angle of 90and negative front rack angle of 10are used to cut RC.The peeling and breaking patterns of cutting concrete are proposed,the nodular and grainy chips are the preferred modes in cutting steel bars.The LS-DYNA is employed to investigate the cutting performance in advance.The simulation results show that the average and peak cutting forces increase with the growth of penetration depth,cutting speed,and roundness,and subsequently the recommended penetration depth less than 1.2 mm is obtained to cut RC due to the existence of steel bars.Moreover,the linear cutting platform is adopted to investigate the force ability and damage state of PDC cutters.It is concluded that the cutting force increases abruptly and fluctuates heavily when cutting the coarse aggregates.The patterns occurred in both numerical and experimental results are generally similar.Notably,the steel bar is pulled out and the PDC cutter is damaged at the penetration depth of 0.8 mm,while a good cut occurs at the penetration depth of 0.3 mm.The tapered PDC cutter with a relatively low cutting force is prone to be broken compared with circular PDC cutter.It is suggested that the circular PDC cutter at the penetration depth of 0.3 mm should be used to cut RC in practical engineering.
基金This engineering is a demonstration project for Key Research and Development Project of Guangdong Province under Grant No.2019B111105001part of research related to this engineering was financially supported by the project.
文摘1 Project overview The Shasan station of Phase II of Shenzhen’s urban rail transit Line 12 is situated in Bao’an District,Shenzhen.It comprises a two-level underground island platform station,measuring 212 m in length,and 22.6 m in width,with an overburden thickness of about 7.0 m.Fig.1 illustrates the presence of a large underground reinforced concrete stormwater culvert,measuring 11.5 m by 3.6 m,traversing the station’s center.