期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
World’s first implementation of close-fit pipe jacking of twin tunnels for construction of subway station--Innovation in equipment and construction technology
1
作者 Xiangsheng CHEN Bo SUN +8 位作者 Wei LI Yongzhao WU Wenpeng ZHOU Meng FENG Lei WANG Wensheng YANG Xiang WU Weiyi LONG Dong SU 《Frontiers of Engineering Management》 2024年第2期369-376,共8页
1 Project overview The Shasan station of Phase II of Shenzhen’s urban rail transit Line 12 is situated in Bao’an District,Shenzhen.It comprises a two-level underground island platform station,measuring 212 m in leng... 1 Project overview The Shasan station of Phase II of Shenzhen’s urban rail transit Line 12 is situated in Bao’an District,Shenzhen.It comprises a two-level underground island platform station,measuring 212 m in length,and 22.6 m in width,with an overburden thickness of about 7.0 m.Fig.1 illustrates the presence of a large underground reinforced concrete stormwater culvert,measuring 11.5 m by 3.6 m,traversing the station’s center. 展开更多
关键词 Subway station close-fit pipe jacking of twin tunnels modular rectangular pipe jacking machine Structural Transformation equipment construction
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部