期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
PLANNED LEAD TIME OPTIMIZATION IN MATERIAL REQUIREMENT PLANNING ENVIRONMENT FOR MULTILEVEL PRODUCTION SYSTEMS 被引量:1
1
作者 Faicel HNAIEN Alexandre DOLGUI Mohamed-Aly OULD LOULY 《Journal of Systems Science and Systems Engineering》 SCIE EI CSCD 2008年第2期132-155,共24页
This paper deals with the problem of planned lead time calculation in a Material Requirement Planning (MRP) environment under stochastic lead times. The objective is to minimize the sum of holding and backlogging co... This paper deals with the problem of planned lead time calculation in a Material Requirement Planning (MRP) environment under stochastic lead times. The objective is to minimize the sum of holding and backlogging costs. The proposed approach is based on discrete time inventory control where the decision variables are integer. Two types of systems are considered: multi-level serial-production and assembly systems. For the serial production systems (one type of component at each level), a mathematical model is suggested. Then, it is proven that this model is equivalent to the well known discrete Newsboy Model. This directly provides the optimal values for the planned lead times. For multilevel assembly systems, a dedicated model is proposed and some properties of the decision variables and objective function are proven. These properties are used to calculate lower and upper limits on the decision variables and lower and upper bounds on the objective function. The obtained limits and bounds open the possibility to develop an efficient optimization algorithm using, for example, a Branch and Bound approach. The paper presents the proposed models in detail with corresponding proofs and se'~eral numerical examples. Some advantages of the suggested models and perspectives of this research are discussed. 展开更多
关键词 Multilevel assembly and production control model planned lead time optimization systems MRP random lead times discrete inventory
原文传递
Discontinuation of Recycled Lead Refineries Planned in Jiangxi Province
2
《China Nonferrous Metals Monthly》 2018年第6期9-9,共1页
The first round of rectification action of the Central Environmental Inspection Group will be fully implemented in the near future.Six Central Environmental Inspection Groups will successively station in 10 provinces,... The first round of rectification action of the Central Environmental Inspection Group will be fully implemented in the near future.Six Central Environmental Inspection Groups will successively station in 10 provinces,including Henan,Hebei,Inner Mongolia,Heilongjiang,Jiangsu,Jiangxi,Guangdong,Guangxi。 展开更多
关键词 Discontinuation of Recycled Lead Refineries Planned in Jiangxi Province
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部