State Key Power Construction Projects in 1999 Issued from the State Development Planning Commission
1
《Electricity》 1999年第3期35-35,共1页
关键词 State Key Power Construction projects in 1999 Issued from the State Development planning Commission
下载PDF
Network Analysis for Projects with High Risk Levels in Uncertain Environments
2
作者 Mohamed Abdel-Basset Asmaa Atef +2 位作者 Mohamed Abouhawwash Yunyoung Nam Nabil M.AbdelAziz 《Computers, Materials & Continua》 SCIE EI 2022年第1期1281-1296,共16页
The critical path method is one of the oldest and most important techniques used for planning and scheduling projects.The main objective of project management science is to determine the critical path through a networ... The critical path method is one of the oldest and most important techniques used for planning and scheduling projects.The main objective of project management science is to determine the critical path through a network representation of projects.The critical path through a network can be determined by many algorithms and is useful for managing,monitoring,and controlling the time and cost of an entire project.The essential problem in this case is that activity durations are uncertain;time presents considerable uncertainty because the time of an activity is not always easily or accurately estimated.This issue increases the need to use neutrosophic theory to solve the critical path problem.Real-world problems are characterized by a lack of precision,consistency,and completeness.The concept of neutrosophic sets has been introduced as a generalization of fuzzy,intuitionistic fuzzy,and crisp sets to overcome the ambiguity surrounding real-world problems.Truth-,falsity-,and indeterminacy-membership functions are used to express neutrosophic elements.This study was performed to examine a neutrosophic event-oriented algorithm for determining the critical path in activity-on-arc networks.The activity time estimates are presented as trapezoidal neutrosophic numbers,and score and accuracy functions are used to obtain a crisp model of the problem.An appropriate numerical example is then used to explain the proposed method. 展开更多
关键词 Project management project life cycle project planning project scheduling CPM neutrosophic set theory trapezoidal neutrosophic number
下载PDF
Information on Power Projects Planned in China
3
《Electricity》 2009年第3期53-54,共2页
关键词 PROJECT 2010 III HEAT Information on Power projects Planned in China
下载PDF
Information on Power Projects Planned in China
4
《Electricity》 2009年第4期52-54,共3页
关键词 2010 HEAT PROJECT Information on Power projects Planned in China
下载PDF
Information on Power Projects Planned in China
5
《Electricity》 2009年第1期52-54,共3页
关键词 PROJECT 2010 Information on Power projects Planned in China
下载PDF
Information on Power Projects Planned in China
6
《Electricity》 2010年第1期51-53,共3页
关键词 2010 PROJECT Information on Power projects Planned in China
下载PDF
Seven Projects Planned for Huabei Oilfield
7
《China Oil & Gas》 CAS 1997年第2期127-127,共1页
关键词 Seven projects Planned for Huabei Oilfield
下载PDF
Project Planning and Scheduling in the Face of the Fourth Industrial Revolution(4IR)
8
作者 Masithembe Kafile 《Journal of Business Administration Research》 2021年第3期51-61,共11页
This paper addresses the integrated processes of planning and scheduling of projects using technologies advanced tools as means for managing change in the era of the 4IR.The paper explores the traditional project mana... This paper addresses the integrated processes of planning and scheduling of projects using technologies advanced tools as means for managing change in the era of the 4IR.The paper explores the traditional project management planning and scheduling tools in conjunction with what technology has to offer,to bridge the gap between the traditional project management planning and scheduling tools and what the modern-day business market demands.An analysis of literature covering a wide range of theoretic and empirical studies was performed.The theories underlying various planning and scheduling methods were analysed in relation to the design of projects.A descriptive quantitative secondary data was used as a tool to assess the impact of technology on project planning for scheduling.The analysis of the study’s data was conducted using the principles of cross-tabulation.Inferences were drawn on the significant impact of the use of advanced technological tools on project planning for scheduling in current business time.Organisations can make use of the findings of this study to correctly apply the available advanced technological tools for more efficient schedule management planning to enhance the successful delivery of their projects.Further,this research can be used to provide learning opportunities for new and inexperienced planners and schedulers,and as a basis for further research in this field of knowledge. 展开更多
关键词 Project planning Schedule management Project management Advanced project management tools Fourth industrial revolution(4IR)
下载PDF
SHAANXI'S KEY PROJECTS FOR FIXED ASSETS INVESTMENT DURING THE NINTH FIVE-YEAR PLAN
9
《China's Foreign Trade》 1996年第9期24-24,共1页
During the Eighth Five-Year Planperiod, Shaanxi Province intensifiedthe restructuring of investment andmacro-control in fixed assets investment byimplementing the policy of "limiting totalamount, readjusting stru... During the Eighth Five-Year Planperiod, Shaanxi Province intensifiedthe restructuring of investment andmacro-control in fixed assets investment byimplementing the policy of "limiting totalamount, readjusting structure, rectifying orderand improving efficiency". The wholeprovince realized RMB 110 billion in fixedassets investment, (including RMB 86.5 billionby state-owned units, RMB 14.23 billionthrough loans from the construction bank,making up 16.5 percent), RMB 67 billionmore than in the Seventh Five-Year Planperiod, with an annual increase of 26.5 percent.Thanks to the support, a group of medium-to-large and key projects have been put 展开更多
关键词 WILL SHAANXI’S KEY projects FOR FIXED ASSETS INVESTMENT DURING THE NINTH FIVE-YEAR PLAN than
下载PDF
Practice of Smart Grid in China ①
10
作者 Wang Yimin Director,Department of Smart Grid,SGCC Zhang Sufang 《Electricity》 2010年第3期-,共6页
An exclusive interview with the author was published in Issue 2,2010 of this journal,in which the starting point and macro-strategy to construct smart grid in China was presented.Meanwhile,the three periods of smart g... An exclusive interview with the author was published in Issue 2,2010 of this journal,in which the starting point and macro-strategy to construct smart grid in China was presented.Meanwhile,the three periods of smart grid construction were also mentioned,namely planning and pilot project construction period,overall construction period,and improving and upgrading period as it is planned by SGCC.At the invitation of this journal,the author wrote an article further introducing the implementation in the first period of SGCC smart grid program.The article will be published in two consecutive issues. 展开更多
关键词 smart grid planning demonstration project
下载PDF
Discussion about the standard system on urban domestic water saving technology in China
11
作者 YANG Shujun, REN Xiaoli ,GAO Benhu 《China Standardization》 2007年第2期2-5,共4页
Standard is the technical foundation of national economic and social development, and it is the basic rule of establishing social regulation. Researching and constituting the standard system of urban domestic water sa... Standard is the technical foundation of national economic and social development, and it is the basic rule of establishing social regulation. Researching and constituting the standard system of urban domestic water saving technology is to offer important science basis for revising standard plan and standardize research plan. This paper introduces the present situation of our urban domestic water saving technical standard system, problem and the development direction in the future, as well as project planning of constructing urban domestic water saving technical standard system. 展开更多
关键词 Standard system urban domestic water saving technology water shortage Project plan
下载PDF
A Study of Flue Cas Desulfurization Plan for a Power Plant Project
12
《Electricity》 1997年第4期26-28,共3页
关键词 A Study of Flue Cas Desulfurization Plan for a Power Plant Project
下载PDF
Three Gorges Dam project in great progress as planned
13
《Electricity》 1996年第3期26-26,共1页
It hasn’t been easy, but almost all of the work on the Three Gorges Project is on schedule, according to a corporation overseeing construction of the dam. The China Yangtze Three Gorges Project Development Corporatio... It hasn’t been easy, but almost all of the work on the Three Gorges Project is on schedule, according to a corporation overseeing construction of the dam. The China Yangtze Three Gorges Project Development Corporation has reported that contractors and other staff are working hard to ensure that the flood season does not slow the dam project. The company recently detailed the mammoth tasks that have taken place so 展开更多
关键词 Three Gorges Dam project in great progress as planned
下载PDF
Partipatory Methodologies in the Planning And Design of Forestry Projects
14
《Forestry and Society Newsletter》 1998年第2期11-14,共4页
关键词 DESIGN Partipatory Methodologies in the planning And Design of Forestry projects
原文传递
Funding of Major Research Plan Projects in 2011
15
《Science Foundation in China》 CAS 2011年第2期40-54,共15页
关键词 Funding of Major Research Plan projects in 2011
原文传递
Practical Application of Participatory Approach in Land Conversion Project Planning: A Case in Quxian County, Sichuan Province
16
作者 LI Weichang DENG HuafengResearch Institute of Forestry Policy and Information. Chinese Academy of Forestry. Beijing 100091. China eiiine Forestrv Universuty. Beiiine 100081. China 《Chinese Forestry Science and Technology》 2003年第4期50-57,共8页
Application of participatory approaches in governmental forestry projects is a bran-new forestry design method. The purpose is to plan the utilization of land correctly, and to determine planting sites, planting speci... Application of participatory approaches in governmental forestry projects is a bran-new forestry design method. The purpose is to plan the utilization of land correctly, and to determine planting sites, planting species, participating households and management models, based on the projects' requirements and the farmers' demands. Participatory approaches are now practiced in some of the counties in Land Conversion Project. The paper presents the significance and necessity of practicing community mechanis... 展开更多
关键词 participatory approaches Land Conversion Project planning
原文传递
Decision with Grey Correlation and AHP 被引量:3
17
作者 ZHA Jingmin and ZHONG Donghua(Dept.of Hydraulicic Engin.,Tianjin University,Tianjin 300072,China) 《Systems Science and Systems Engineering》 CSCD 1996年第1期103-110,共8页
On the basis of the theories of grey system correlation degree and analytic hierarchy process,this paper studies the problem of plan decision for the exploitation of water conservancy project.According to the data arm... On the basis of the theories of grey system correlation degree and analytic hierarchy process,this paper studies the problem of plan decision for the exploitation of water conservancy project.According to the data army of correlation degree,the optimized plan can be selected objectively and scientifically.Practical example given in this paper have proved the validity of the method. 展开更多
关键词 exploitation plan of water conservancy project DECISION correlation degree AHP
原文传递
Improving Internationally Core Competences Based on the Capabilities of Precise and Accurate Project Management 被引量:1
18
作者 Zhen-you Li Ji-shan He Meng-jun Wang 《Frontiers of Engineering Management》 2016年第3期231-238,共8页
Modern international project management has entered the phase of precise and accurate project management after the global financial crisis broke out at the beginning of the 21 stcentury. However, its development has f... Modern international project management has entered the phase of precise and accurate project management after the global financial crisis broke out at the beginning of the 21 stcentury. However, its development has faced new challenges since there has been lack of explicitly unanimous definition for the capability dimensions of precise and accurate project management, as well as the models and their process control parameters. The required core capabilities based on the precise and accurate project management for various rings are involved in the project life cycle, namely, the required internationally core competences and their components for the phases of project strategic planning and decision making in the early project phase, as well as the value engineering, and the project supervision and controls during the execution phase.Through studying the effects of the internationally core competences based on precise and accurate project management capabilities for the success and excellence of projects and configuring such models, the goal is to help the main contractors continuously obtain project success and excellence, thus improve its internationally core competences with continuous project success and excellence. 展开更多
关键词 precise and accurate project management project strategic planning DECISION-MAKING project supervision and controls project execution value engineering
原文传递
Valley-resolved transport in zigzag graphene nanoribbon junctions
19
作者 Ming Li Zi-Liang Cai +1 位作者 Zhi-Bo Feng Zheng-Yin Zhao 《Communications in Theoretical Physics》 SCIE CAS CSCD 2021年第11期157-164,共8页
Applying the transfer matrix and Green’s function methods,we study the valley-resolved transport properties of zigzag graphene nanoribbon(ZGN_(R))junctions.The width of the left and right ZGN_(R)s are N_(L)and N_(R),... Applying the transfer matrix and Green’s function methods,we study the valley-resolved transport properties of zigzag graphene nanoribbon(ZGN_(R))junctions.The width of the left and right ZGN_(R)s are N_(L)and N_(R),and N_(L)≥N_(R).The step/dip positions of the conductance G,the intravalley transmission coefficients(TKKand TK’K’),and the valley polarization efficiency PK’K correspond to the subband edges of the right/left ZGN_(R)that are controlled by N_(R)/N_(L).The intervalley transmission coefficients(TKK and TK’K)exhibit peaks at most of the subband edge of the left and right ZGN_(R)s.In the bulk gap of the right ZGN_(R),TKK’=TK’K=0,and PKK’=±1,the valley polarization is well preserved.As N_(R)increases,the energy region for PK’K=±1 decreases.When N_(L)is fixed and N_(R)decreases,G,TKK,TK’K’and PKK’exhibit more and more dips,and the peaks of TKK’(TK’K)become more and more high,especially when(N_(L)-N_(R))/2 is odd.These characters are quite useful for manipulating the valley dependent transport properties of carriers in ZGN_(R)junctions by modulating N_(L)or N_(R),and our results are helpful to the design of valleytronics based on ZGN_(R)junctions. 展开更多
关键词 transfer matrix method ZGNR junction valley polarization Landauer-Büttiker formula edge state Fund:supported by the Natural Science Foundation of Henan Province under Grant No.212300410388 the“316”Project Plan of Xuchang University