The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode...The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode of the two can better meet the needs of the electric power system. This article first presents an analysis of the necessity and superiority of such mode, then explains its meaning and analyzes the working routes. Finally, it proposes the business modes as follows: low price pumping water electricity plus nuclear power in the near term;nuclear power shifted to pumped storage power participating in market competition in the middle term;and, in the long term, nuclear power shifted to pumped storage power as primary and serving as an electric power system when needed.展开更多
随着第五代移动通信(5th generation mobile communication,5G)基站建设数量的剧增,5G基站的备用电池将是一个具有巨大潜能的储能资源。我国电力市场化改革正不断推进,研究5G基站的备用储能参与电力市场交易是实现电网和通信运营商互利...随着第五代移动通信(5th generation mobile communication,5G)基站建设数量的剧增,5G基站的备用电池将是一个具有巨大潜能的储能资源。我国电力市场化改革正不断推进,研究5G基站的备用储能参与电力市场交易是实现电网和通信运营商互利共赢的有效途径。考虑到5G基站备用储能参与电力市场的特殊性,建立了计及退化成本和可调度容量的基站储能电池模型,并将零散的基站聚合成5G基站虚拟电厂(virtual power plant,VPP)。然后,将5G基站VPP作为独立的竞价主体,构建双层的电能量-调频辅助服务市场交易决策模型,并利用KKT(Karush-Kuhn-Tucker)条件和对偶理论将双层模型转化为可解的混合整数规划问题。最后,通过算例评估了5G基站备用储能的可调度容量以及所提交易决策模型的有效性。展开更多
在新型电力系统中,亟待深度挖掘需求侧资源以提升系统灵活性和新能源消纳能力。在“新基建”背景下,5G基站作为一种新型需求侧资源正迅速发展。研究如何在保证基站备用需求的前提下,由铁塔公司组建含大规模5G基站的虚拟电厂(virtual pow...在新型电力系统中,亟待深度挖掘需求侧资源以提升系统灵活性和新能源消纳能力。在“新基建”背景下,5G基站作为一种新型需求侧资源正迅速发展。研究如何在保证基站备用需求的前提下,由铁塔公司组建含大规模5G基站的虚拟电厂(virtual power plant,VPP)并常态化参与需求响应。首先,提出了考虑储能动态备用容量的5G基站运行可行域构建方法,建立了5G基站VPP的聚合模型。然后,建立了5G基站VPP响应负荷准线的日前优化模型,提出了适合对大规模5G基站进行协调控制的日内解聚合方法。最后,建立了含高比例新能源的区域电网仿真算例。仿真结果表明,聚合大规模基站参与准线型需求响应,可以显著降低5G基站的运行成本,同时提高电网的新能源消纳能力。展开更多
BIM(Building Information Modeling,建筑信息模型)技术是建筑行业数字化转型的重要工具。BIM应用具有诸多可能性,对参建各方均有较大的应用价值。摒弃传统的二维设计理念,探究高效的BIM正向设计流程是行业的客观要求和发展方向。论文...BIM(Building Information Modeling,建筑信息模型)技术是建筑行业数字化转型的重要工具。BIM应用具有诸多可能性,对参建各方均有较大的应用价值。摒弃传统的二维设计理念,探究高效的BIM正向设计流程是行业的客观要求和发展方向。论文通过分析市政厂站工程中结构设计的特点,基于Robot有限元软件与Revit三维设计软件的信息交互接口,充分利用BIMspace等三维设计插件,提出了某市政厂站工程中结构专业的BIM正向设计解决方案。展开更多
基金funded by the Project “Resource Characteristics of Main Watersheds and Key Issues in Development and Utilization of Hydroelectricity in South America and Africa”the National Science Foundation of China (U1766201)
文摘The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode of the two can better meet the needs of the electric power system. This article first presents an analysis of the necessity and superiority of such mode, then explains its meaning and analyzes the working routes. Finally, it proposes the business modes as follows: low price pumping water electricity plus nuclear power in the near term;nuclear power shifted to pumped storage power participating in market competition in the middle term;and, in the long term, nuclear power shifted to pumped storage power as primary and serving as an electric power system when needed.
文摘随着第五代移动通信(5th generation mobile communication,5G)基站建设数量的剧增,5G基站的备用电池将是一个具有巨大潜能的储能资源。我国电力市场化改革正不断推进,研究5G基站的备用储能参与电力市场交易是实现电网和通信运营商互利共赢的有效途径。考虑到5G基站备用储能参与电力市场的特殊性,建立了计及退化成本和可调度容量的基站储能电池模型,并将零散的基站聚合成5G基站虚拟电厂(virtual power plant,VPP)。然后,将5G基站VPP作为独立的竞价主体,构建双层的电能量-调频辅助服务市场交易决策模型,并利用KKT(Karush-Kuhn-Tucker)条件和对偶理论将双层模型转化为可解的混合整数规划问题。最后,通过算例评估了5G基站备用储能的可调度容量以及所提交易决策模型的有效性。
文摘在新型电力系统中,亟待深度挖掘需求侧资源以提升系统灵活性和新能源消纳能力。在“新基建”背景下,5G基站作为一种新型需求侧资源正迅速发展。研究如何在保证基站备用需求的前提下,由铁塔公司组建含大规模5G基站的虚拟电厂(virtual power plant,VPP)并常态化参与需求响应。首先,提出了考虑储能动态备用容量的5G基站运行可行域构建方法,建立了5G基站VPP的聚合模型。然后,建立了5G基站VPP响应负荷准线的日前优化模型,提出了适合对大规模5G基站进行协调控制的日内解聚合方法。最后,建立了含高比例新能源的区域电网仿真算例。仿真结果表明,聚合大规模基站参与准线型需求响应,可以显著降低5G基站的运行成本,同时提高电网的新能源消纳能力。
文摘BIM(Building Information Modeling,建筑信息模型)技术是建筑行业数字化转型的重要工具。BIM应用具有诸多可能性,对参建各方均有较大的应用价值。摒弃传统的二维设计理念,探究高效的BIM正向设计流程是行业的客观要求和发展方向。论文通过分析市政厂站工程中结构设计的特点,基于Robot有限元软件与Revit三维设计软件的信息交互接口,充分利用BIMspace等三维设计插件,提出了某市政厂站工程中结构专业的BIM正向设计解决方案。