期刊文献+
共找到2,680篇文章
< 1 2 134 >
每页显示 20 50 100
Life Cycle Assessment of CCA-Treated Wood Highway Guard Rail Posts in the US with Comparisons to Galvanized Steel Guard Rail Posts 被引量:1
1
作者 Christopher A. Bolin Stephen T. Smith 《Journal of Transportation Technologies》 2013年第1期58-67,共10页
A cradle-to-grave life cycle assessment is done to identify the environmental impacts of chromated copper arsenate (CCA)-treated timber used for highway guard rail posts, to understand the processes that contribute to... A cradle-to-grave life cycle assessment is done to identify the environmental impacts of chromated copper arsenate (CCA)-treated timber used for highway guard rail posts, to understand the processes that contribute to the total impacts, and to determine how the impacts compare to the primary alternative product, galvanized steel posts. Guard rail posts are the supporting structures for highway guard rails. Transportation engineers, as well as public and regulatory interests, have increasing need to understand the environmental implications of guard rail post selection, in addition to factors such as costs and service performance. This study uses a life cycle inventory (LCI) to catalogue the input and output data from guard rail post manufacture, service life, and disposition, and a life cycle impact assessment (LCIA) to assess anthropogenic and net greenhouse gas (GHG), acidification, smog, ecotoxicity, and eutrophication potentially resulting from life cycle air emissions. Other indicators of interest also are tracked, such as fossil fuel and water use. Comparisons of guard rail post products are made at a functional unit of one post per year of service. This life cycle assessment (LCA) finds that the manufacture, use, and disposition of CCA-treated wood guard rails offers lower fossil fuel use and lower anthropogenic and net GHG emissions, acidification, smog potential, and ecotoxicity environmental impacts than impact indicator values for galvanized steel posts. Water use and eutrophication impact indicator values for CCA-treated guard rail posts are greater than impact indicator values for galvanized steel guard rail posts. 展开更多
关键词 Life Cycle Assessment LCA LCI Environmental Impact Treated Wood Chromated Copper ARSENATE CCA Guard Rail post Greenhouse Gas GHG Galvanized steel
下载PDF
Comparative analysis of cast-in-place post-tensioned and steel-concrete composite bridge bent caps 被引量:1
2
作者 Nur Yazdani Francisco D.B.Ruiz 《Journal of Modern Transportation》 2017年第3期194-204,共11页
The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two altern... The complexity of the IH-635 Managed Lanes Project, located in Dallas County, Texas, posed several technical and constructive challenges, leading to the adoption of solutions different from the traditional. Two alternative solutions for the pier cap on one of the bridge crossings over IH-35E in the IH-635 project were analyzed in this case study, a cast-in-place post-tensioned concrete cap and an innovative prefabricated steel-concrete com- posite cap. The approach was to use an estimation of direct costs for material and labor and consideration of con- struction time schedules. A supplementary numerical modeling confirmed that both alternatives behave elasti- cally under imposed loads. The direct cost of material and labor for the two alternatives were close. However, the composite alternative required 13 days less construction time, resulting in substantial cost savings from traffic closing in the very busy traffic corridor. Traffic closing costs were substantially higher than the direct costs, especially for the post-tensioned cap. The quantification of the benefits allows more confidence in the utilization of the composites caps, leading to faster completion of bridge projects and substantial economic savings. 展开更多
关键词 Bridge pier cap Bridge bent - post-tensionedstructure steel-concrete cap Cost estimation Construction schedule Traffic closing cost
下载PDF
New Technology of Installing the Attached Self-Climbing Tower Steel Gantry Cranes
3
《International English Education Research》 2013年第12期224-228,共5页
The Liujiaxia Bridge is 536 m span steel truss stiffening Girder Bridge, tower with double-column steel concrete slructure, which is the world's largest diameter, the largest steel plate thickness of concrete pylon. ... The Liujiaxia Bridge is 536 m span steel truss stiffening Girder Bridge, tower with double-column steel concrete slructure, which is the world's largest diameter, the largest steel plate thickness of concrete pylon. Sarasota manufactured using standard pipe segment, group fight scene segment piecewise hoisting tower segment perfusion within the micro-expansion concrete construction technology, tower maximum height of 61.5 meters. This paper describes a piecewise Sarasota steel installation, piecewise perfusion within the micro-expansion concrete tower new construction method - attached to a self-climbing tower bridge ganlry crane mounted pylon construction technology of large steel components. Of the "entity attached to the pylon installation of equipment by section climb" design, composition and construction applications are described in detail. 展开更多
关键词 Self-Climbing Tower steel Structure Attached to the Gantry Crane instalLATION Technology
下载PDF
Construction Management and Installation Quality Control Strategy of Steel Bridges
4
作者 Tieyuan Sun 《Journal of World Architecture》 2022年第6期24-28,共5页
At present,China’s bridges are mostly made of concrete,which contain a large amount of cement,sand and gravel and other materials,which can easily cause environmental pollution.At the same time,China’s total steel p... At present,China’s bridges are mostly made of concrete,which contain a large amount of cement,sand and gravel and other materials,which can easily cause environmental pollution.At the same time,China’s total steel production continues to rank first in the world.The construction and development of steel bridges have sufficient basic support.At the same time,steel is more environmental-friendly than concrete,with higher strength,lower weight,and can reduce construction waste significantly,so the development of steel bridges has been on the rise.To optimize the application effect of steel structure bridges,it is necessary to analyze the construction management and installation quality control strategies of steel bridges for reference. 展开更多
关键词 steel bridge Construction management installation quality Control strategy
下载PDF
Influence of post-weld heat treatment on microstructure and properties in heat-affected zone of KMN steel joint
5
作者 Hao Xiaohu Dong Honggang Deng Dewei 《China Welding》 EI CAS 2014年第2期1-6,共6页
The influence of temperature during post-weld heat treatment on the microstructure and properties of KMN steel joints was investigated. The results reveal that after heat treatment, the martensite transformed to tempe... The influence of temperature during post-weld heat treatment on the microstructure and properties of KMN steel joints was investigated. The results reveal that after heat treatment, the martensite transformed to tempered sorbite, causing the softening of the resultant joints. XRD test shows that the residual austenite content decreased obviously when the joint was heattreated at 550 ℃ and 580 ℃, which degraded the impact toughness of heat-affected zone ( HAZ). When the heat treatment temperature increased further, the dispersion strengthening from the precipitation of alloying elements improved the impact toughness of HAZ. The aggregation and coarsening of carbide also contributed to the improvement of impact toughness of HAZ. 展开更多
关键词 KMN steel post-weld heat treatment MICROSTRUCTURE HARDNESS impact toughness
下载PDF
Correlation between Process Variables in Shielded Metal-Arc Welding (SMAW) Process and Post Weld Heat Treatment (PWHT) on Some Mechanical Properties of Low Carbon Steel Welds
6
作者 J. O. Olawale S. A. Ibitoye +2 位作者 K.M. Oluwasegun M. D. Shittu R. C. Ofoezie 《Journal of Minerals and Materials Characterization and Engineering》 2012年第9期891-895,共5页
This investigation was conducted to correlate process variables in shielded metal-arc welding (SMAW) and post weld heat treatment on some mechanical properties of low carbon steel weld. Three hundred and sixty pieces ... This investigation was conducted to correlate process variables in shielded metal-arc welding (SMAW) and post weld heat treatment on some mechanical properties of low carbon steel weld. Three hundred and sixty pieces of weld samples were prepared. The samples were welded together using AWS E6013 electrodes with DC arc welding process. Varying welding currents of 100 A, 120 A, 140 A were used with a terminal voltage of 80 V. The weld samples were prepared for hardness, tensile and impact test. The prepared samples were then subjected to normalising heat treatment operation at temperatures of 590°C, 600°C, 620°C, 640°C, 660°C, 680°C, and 700°C. It was observed that increase in welding current led to an increase in hardness and ultimate tensile strength values of as-weld samples while impact strength de-creases. After post heat treatment operation the hardness and ultimate tensile strengths decreases while impact strength increases. From this outcome we conclude that there is correlation between the welding current and mechanical proper-ties of weld metal on one hand and normalising temperatures and mechanical properties on the other hand. As the cur-rent increases the hardness and strength increases but impact strength reduces, while hardness and strength continuously reduces but impact strength increases as normalising temperatures increases. 展开更多
关键词 post-Welding Normalising Current steel HARDNESS STRENGTH
下载PDF
马鞍山长江公铁大桥Z3号桥塔施工关键技术 被引量:1
7
作者 潘博 李维 刘爱林 《世界桥梁》 北大核心 2024年第2期29-35,共7页
巢马城际铁路马鞍山长江公铁大桥主航道桥为(112+392+2×1120+392+112)m三塔钢桁梁斜拉桥,Z3号桥塔为超高多肢钢-混组合塔,高308 m。上塔柱钢结构高87.5 m,分13个吊装节段,最重505 t;中、下塔柱混凝土结构高217.5 m,分38个节段液压... 巢马城际铁路马鞍山长江公铁大桥主航道桥为(112+392+2×1120+392+112)m三塔钢桁梁斜拉桥,Z3号桥塔为超高多肢钢-混组合塔,高308 m。上塔柱钢结构高87.5 m,分13个吊装节段,最重505 t;中、下塔柱混凝土结构高217.5 m,分38个节段液压爬模施工;钢-混结合段高3 m,内部采用PBL键+剪力钉+高强度钢锚杆+高强度混凝土结构形式。在中塔柱设置钢管临时横撑控制塔柱线形及应力;下横梁采用落地支架法分层施工,与对应塔柱同步浇筑;钢-混结合段混凝土采用C60细石补偿收缩混凝土+高强度灌浆料,保证了混凝土施工质量;采用工厂“2+1”立体匹配制造、“提升站+运输栈桥”钢塔节段转运等技术,并研制15000 t•m超大型塔吊,实现了钢塔柱大节段的制造、整体滩地运输和吊装;钢塔节段间采用栓焊组合连接形式,通过设置工艺隔板、双面坡口等措施控制了钢塔焊接变形;利用定位桁架临时锁定钢塔合龙段实现了钢塔的精确合龙,定位桁架受力及变形均满足要求。 展开更多
关键词 斜拉桥 钢-混组合桥塔 超高多肢 钢-混结合段 整体吊装 钢塔合龙 栓焊组合连接 施工技术
下载PDF
轻量化整体液压顶升式钢平台在宁波曼哈顿大厦项目中的应用
8
作者 刘玉涛 陈万里 +2 位作者 黄苏梦 何骏炜 黄政哲 《施工技术(中英文)》 CAS 2024年第14期35-40,46,共7页
宁波曼哈顿大厦标准层核心筒采用自主研发的轻量化整体液压顶升式钢平台,其以刚性桁架结构为主体,顶部整体钢平台可安装集成布料机,并悬挂核心筒墙体模板及4~5层操作平台,通过全作业面防护保障了多作业面穿插作业。介绍了该钢平台安装... 宁波曼哈顿大厦标准层核心筒采用自主研发的轻量化整体液压顶升式钢平台,其以刚性桁架结构为主体,顶部整体钢平台可安装集成布料机,并悬挂核心筒墙体模板及4~5层操作平台,通过全作业面防护保障了多作业面穿插作业。介绍了该钢平台安装、运行、拆除施工流程及重难点管理。实践表明,采用该钢平台施工,缩短了主要工序时间,从而有效缩短了核心筒标准层工期。 展开更多
关键词 高层建筑 核心筒 钢平台 安装 运行 拆除
下载PDF
高速铁路大跨度钢桁架桥接触网腕臂安装技术研究 被引量:1
9
作者 卢广苗 《铁道标准设计》 北大核心 2024年第4期186-192,共7页
高速铁路大跨度钢桁架桥纵向伸缩量大且变位复杂,是影响接触网腕臂偏移等系统能否正常、安全运行的重要因素,如何解决接触网腕臂安装、偏移调整与钢梁伸缩之间的协同配合,目前国内在此方面鲜有研究。通过阐述受导线伸缩影响的腕臂偏移... 高速铁路大跨度钢桁架桥纵向伸缩量大且变位复杂,是影响接触网腕臂偏移等系统能否正常、安全运行的重要因素,如何解决接触网腕臂安装、偏移调整与钢梁伸缩之间的协同配合,目前国内在此方面鲜有研究。通过阐述受导线伸缩影响的腕臂偏移机理和大跨度钢桁架桥梁体纵向伸缩机理,分析在不同接触网锚段布置方式下大跨度钢桁架桥梁体伸缩对腕臂偏移的影响,并采用逐工点分析法总结不同工况下钢梁伸缩与导线伸缩对腕臂偏移影响的相互关系,揭示了接触网腕臂安装曲线在导线伸缩及钢梁伸缩共同作用下的计算方法。结合典型案例计算分析,建议采用不同钢梁跨度下的推荐锚段布置方式能有效降低腕臂偏移量,并提出应重点关注伸缩缝两侧锚段腕臂偏移问题、腕臂偏移为叠加关系时缩小半锚长度、钢梁跨度大于720 m时应重点计算伸缩缝两侧双腕臂间距等优化事项。研究内容及计算公式可为系统性解决高速铁路大跨度钢桁架桥接触网腕臂偏移设计、施工及运营维护等技术难题提供理论支持。 展开更多
关键词 高速铁路 大跨度桥 钢桁架桥 钢梁伸缩 接触网 腕臂偏移 腕臂安装曲线
下载PDF
起重船用高强钢大厚板焊接残余应力的试验研究
10
作者 王信 刘勇 王斌 《宇航材料工艺》 CAS CSCD 北大核心 2024年第3期98-102,共5页
以某型起重船结构为研究对象,采用焊接后热作为焊接残余应力消除措施,研究结构的残余应力情况及消除措施的有效性。首先采用焊态和经过焊接后热的两组试板进行焊接残余应力检测并对比,结果表明焊态的试板焊接纵向残余应力最高达552.5 M... 以某型起重船结构为研究对象,采用焊接后热作为焊接残余应力消除措施,研究结构的残余应力情况及消除措施的有效性。首先采用焊态和经过焊接后热的两组试板进行焊接残余应力检测并对比,结果表明焊态的试板焊接纵向残余应力最高达552.5 MPa,接近材料的屈服强度;经后热的试板纵向残余应力最大为385.3MPa,与焊态相比降低了167.2 MPa,下降约30%;同时获取了残余应力分布情况。进一步对起重船导向基座结构的焊缝进行后热并进行应力检测,其纵向焊接残余应力最大值为310.8 MPa,远低于母材屈服强度。本文研究表明:起重船高强钢大厚板在焊态时焊接残余应力较大,需采取措施消除残余应力;采用焊接后热可以大幅降低高强钢大厚板的焊接残余应力水平,焊接后热具有较好的经济性和操作便捷性,在起重船建造过程中建议考虑对大厚板焊缝进行后热以消除焊接残余应力消除。 展开更多
关键词 起重船 高强钢 焊接残余应力 后热
下载PDF
预应力耗能钢框架抗连续倒塌机制研究
11
作者 王述红 陈浩 +1 位作者 单思镝 魏崴 《建筑结构》 北大核心 2024年第16期52-59,共8页
针对预应力耗能(PTED)钢框架结构的连续倒塌问题,采用ABAQUS软件建立精细化有限元模型,对框架结构拆除承重构件后不平衡荷载重分配的行为展开研究。并将有限元结果与1/3缩尺PTED钢框架的准静态试验结果进行对比分析,验证了模型的准确性... 针对预应力耗能(PTED)钢框架结构的连续倒塌问题,采用ABAQUS软件建立精细化有限元模型,对框架结构拆除承重构件后不平衡荷载重分配的行为展开研究。并将有限元结果与1/3缩尺PTED钢框架的准静态试验结果进行对比分析,验证了模型的准确性。在此基础上,进一步开展了PTED钢框架抗连续倒塌受力机制的研究,并分析了初始预应力、预应力钢绞线数量、钢构件材料强度和梁翼缘宽厚比四种因素对钢框架抗连续倒塌机制的影响。结果表明:PTED钢框架抗连续倒塌过程主要包括三个阶段:初始阶段、压拱机制有利阶段和压拱机制不利阶段;倒塌抗力由预应力钢绞线拉力和梁柱之间的竖向作用力共同提供;提高初始预应力、预应力钢绞线数量、钢材屈服强度和降低梁翼缘宽厚比,均会使峰值荷载增大;钢绞线数量的增多使框架在失效柱位移较小时可以提供较大的抗力;增强梁柱构件抵抗局部屈曲变形的能力会提升预应力钢框架抗连续倒塌能力。 展开更多
关键词 自复位结构 预应力耗能钢框架 连续倒塌机制 抗力
下载PDF
火灾后全取代率型钢再生混凝土梁抗弯性能
12
作者 刘晓 王刘杰 +2 位作者 王兵 回彦川 侯东序 《沈阳大学学报(自然科学版)》 CAS 2024年第2期153-162,共10页
为了研究火灾后全取代率型钢再生混凝土(SRRAC)梁的受弯性能,利用有限元模型分析了受火时间、再生粗骨料取代率、钢材及再生混凝土强度参数对构件受弯性能的影响。结果表明:受火时间对构件的抗弯性能影响较为显著,受火时间在30~60 min... 为了研究火灾后全取代率型钢再生混凝土(SRRAC)梁的受弯性能,利用有限元模型分析了受火时间、再生粗骨料取代率、钢材及再生混凝土强度参数对构件受弯性能的影响。结果表明:受火时间对构件的抗弯性能影响较为显著,受火时间在30~60 min时混凝土承载力下降幅度在17.9%~29.4%,受火时间在60 min以上时混凝土承载力下降幅度在10%以内;取代率、型钢强度与混凝土强度对承载力影响较小;在受火时间相同而不同取代率的构件内部温度相差不大。 展开更多
关键词 火灾后 型钢再生混凝土梁 有限元分析 剩余承载力 取代率
下载PDF
后植筋组合梁锚固法静载荷试验技术研究
13
作者 郝志鹏 梁大伟 +1 位作者 李艳 郝红军 《山西建筑》 2024年第19期69-72,共4页
以山西首例素混凝土桩后植筋组合梁锚固法静载荷试验为背景,介绍了后植筋组合梁锚固法静载荷试验基本原理、检测工序等,着重阐述了其计算方法和技术要点。对检测方案的设计计算、控制因素和检测结果进行了分析总结,为今后该方法在本地... 以山西首例素混凝土桩后植筋组合梁锚固法静载荷试验为背景,介绍了后植筋组合梁锚固法静载荷试验基本原理、检测工序等,着重阐述了其计算方法和技术要点。对检测方案的设计计算、控制因素和检测结果进行了分析总结,为今后该方法在本地区的应用提供参考,同时也为该检测方法在本地区的推广提供依据。 展开更多
关键词 后植筋组合梁锚固法 静载试验 检测方法
下载PDF
挪威贝特斯塔德大桥钢箱梁吊装施工技术
14
作者 杨定军 任海滨 +1 位作者 黄靓 杜传鹏 《中国高新科技》 2024年第15期117-119,共3页
贝特斯塔德大桥为挪威新建地方公路Fv.17/720(迪雷斯塔德至马尔姆项目)的一部分,位于挪威中部斯泰恩谢尔市,跨越贝斯塔德峡湾。该桥上部结构为钢混凝土叠合梁桥,全长580m,桥宽11m,共6跨,主跨为112m×2,建成时,为中国施工企业建造的... 贝特斯塔德大桥为挪威新建地方公路Fv.17/720(迪雷斯塔德至马尔姆项目)的一部分,位于挪威中部斯泰恩谢尔市,跨越贝斯塔德峡湾。该桥上部结构为钢混凝土叠合梁桥,全长580m,桥宽11m,共6跨,主跨为112m×2,建成时,为中国施工企业建造的最大跨度钢箱混凝土叠合梁桥,基础采用钢管外壳钢筋混凝土斜桩,水中承台采用薄壁圆角承台,墩柱采用实心钢筋混凝土。 展开更多
关键词 钢箱混凝土叠合梁桥 履带吊+泊船安装 超长节段吊装 抗剪牛腿 欧洲桥梁施工
下载PDF
大跨公铁两用钢桁拱桥边跨施工关键技术
15
作者 周仁忠 康学云 +1 位作者 唐震 刘华龙 《世界桥梁》 北大核心 2024年第5期30-36,共7页
常泰长江大桥天星洲专用航道桥为(168+388+168)m大跨重载公铁两用钢桁拱桥。主梁采用2片主桁双层板桁组合结构,边跨钢梁施工采用架梁吊机悬臂散件拼装。为确保边跨钢梁架设轴线和竖曲线线形,按照最快形成稳定桁片结构原则拼装,上墩前悬... 常泰长江大桥天星洲专用航道桥为(168+388+168)m大跨重载公铁两用钢桁拱桥。主梁采用2片主桁双层板桁组合结构,边跨钢梁施工采用架梁吊机悬臂散件拼装。为确保边跨钢梁架设轴线和竖曲线线形,按照最快形成稳定桁片结构原则拼装,上墩前悬臂拼装并形成三角桁片稳定结构后再实施抄垫;在钢梁架设过程中对钢梁标高进行调整,精确控制钢梁上墩标高;为确保边跨钢梁架设结构受力满足要求,通过有限元理论分析比选,确定临时墩最优脱空时机;采用“基于空间六点调位法”对边跨钢梁进行整体精确定位;主墩支座采用重力法灌浆;基于多点变形协调,通过优化杆件安装工艺,解决了超静定结构杆件带力安装难题。 展开更多
关键词 钢桁拱桥 悬臂散件拼装 上墩标高 临时墩脱空 钢梁调位 支座灌浆 杆件带力安装 施工技术
下载PDF
回应公众关切的既有住宅加装电梯使用后评估研究 被引量:1
16
作者 李宛蓉 宋昆 +2 位作者 王珂钰 程丽 冯琳 《西部人居环境学刊》 CSCD 北大核心 2024年第1期122-128,共7页
通过获取既有住宅加装电梯中公众关切的问题,作为使用后评估的评价要素,结合天津市老旧小区加装电梯的案例,由客观数据测量和主观意愿评价相结合的方式,在功能、经济、运维方面进行使用后评估。一方面对天津市既有住宅加装电梯项目进行... 通过获取既有住宅加装电梯中公众关切的问题,作为使用后评估的评价要素,结合天津市老旧小区加装电梯的案例,由客观数据测量和主观意愿评价相结合的方式,在功能、经济、运维方面进行使用后评估。一方面对天津市既有住宅加装电梯项目进行评估与反馈,另一方面对全国范围的公众关切进行回应,更正公众认知的误区、解释居民关心的问题,助力既有住宅加装电梯工作的推行。 展开更多
关键词 老旧小区改造 加装电梯 使用后评估 公众关切
下载PDF
大型叠拼钢连廊整体同步累减提升施工技术 被引量:1
17
作者 陈少军 郑巍 +2 位作者 冯振川 陈燕安 罗广 《建筑施工》 2024年第2期173-176,共4页
为解决大型钢连廊高空散装焊接量大、焊接质量不可控和作业安全风险大的难题,提出了叠拼钢连廊整体同步累减提升施工技术,主要包括支座预埋及安装、钢连廊现场叠拼、提升设备安装、试提升施工、整体提升施工、逐层悬停安装和提升设备卸... 为解决大型钢连廊高空散装焊接量大、焊接质量不可控和作业安全风险大的难题,提出了叠拼钢连廊整体同步累减提升施工技术,主要包括支座预埋及安装、钢连廊现场叠拼、提升设备安装、试提升施工、整体提升施工、逐层悬停安装和提升设备卸载拆除。实践表明,该技术具有焊接质量好、吊装效率高和施工安全可靠的优势,无需借助大型机械设备,降低了安全风险,缩短了安装时间,节省了建造成本。 展开更多
关键词 钢连廊 叠拼 同步累减提升 悬停安装
下载PDF
钢结构建筑工程施工工序碳排放定额研究
18
作者 黄祖坚 林波荣 +2 位作者 周浩 陈华周 张相勇 《建筑节能(中英文)》 CAS 2024年第1期7-17,共11页
针对钢结构建筑工程装配式施工过程特点,提出基于工序的钢结构建筑工程施工碳排放计算方法,结合某多层钢结构建筑开展钢结构基础、钢构件吊装和安装工序的碳排放定额研究。现场计测所得10种钢结构建筑基础施工工序碳排放为17.72~151.26(... 针对钢结构建筑工程装配式施工过程特点,提出基于工序的钢结构建筑工程施工碳排放计算方法,结合某多层钢结构建筑开展钢结构基础、钢构件吊装和安装工序的碳排放定额研究。现场计测所得10种钢结构建筑基础施工工序碳排放为17.72~151.26(kgCO_(2)/个基础);首节柱和二节柱吊装工序碳排放分别为10.52(kgCO_(2)/根钢柱)和14.59(kgCO_(2)/根钢柱);三种截面尺寸钢柱安装工序碳排放为38.16~69.18 (kgCO_(2)/根钢柱);主梁和次梁汽车吊吊装工序碳排放分别为7.73(kgCO_(2)/根钢梁)和4.52(kgCO_(2)/根钢梁),采用塔吊吊装时,相应碳排放降低至2.40 (kgCO_(2)/根钢梁)和2.22(kgCO_(2)/根钢梁);主梁安装节点共14种,工序碳排放为13.84~125.96(kgCO_(2)/根钢梁);次梁安装节点共11种,工序碳排放为10.39~43.49(kgCO_(2)/根钢梁)。研究提出的工序碳排放计测方法,所得结果可呈现钢结构建筑分部分项工程碳排放源构成特征;计测获得的工序碳排放定额参数,可支持多层钢结构建筑工程建造阶段的碳排放计算,以及施工方案的低碳优化。 展开更多
关键词 钢结构建筑 装配式 施工 吊装 安装 工序 碳排放 定额
下载PDF
凿毛植筋新老混凝土结合面抗剪性能试验研究
19
作者 李逢林 唐亚东 +3 位作者 王苏 张晓华 王强斌 卢文良 《铁道建筑》 北大核心 2024年第8期72-77,共6页
新老混凝土结合面是结构整体受力,尤其是剪切受力的关键。以植筋率(0.17%、0.34%、0.51%)和植入钢筋深度(10、15 cm)为变量,制作5组10个Z形试件进行剪切试验,分析植筋率和植入钢筋深度对新老混凝土试件剪切性能的影响规律。结果表明:植... 新老混凝土结合面是结构整体受力,尤其是剪切受力的关键。以植筋率(0.17%、0.34%、0.51%)和植入钢筋深度(10、15 cm)为变量,制作5组10个Z形试件进行剪切试验,分析植筋率和植入钢筋深度对新老混凝土试件剪切性能的影响规律。结果表明:植筋及整体浇筑试件的破坏面上均伴有骨料剪断和砂浆-骨料脱黏现象,呈典型的脆性破坏特征;植筋试件开裂后,抗剪承载力主要由结合面植入钢筋承担;增加植筋率及植筋深度,试件抗裂性能及抗剪强度均有所提高;整体浇筑试件的开裂、极限剪应力分别为2.98、7.22 MPa,是所有试件的最大值,表明整体浇筑试件的抗裂性能最优,抗剪强度最高。 展开更多
关键词 桥梁工程 新老混凝土 剪切试验 植入钢筋 结合面
下载PDF
离子后氧化对渗氮层结构与性能的调控
20
作者 倪嘉 麻恒 +3 位作者 于民华 胡静 安旭龙 魏坤霞 《表面技术》 EI CAS CSCD 北大核心 2024年第17期170-175,共6页
目的调控离子渗氮层的结构和性能,获得少无化合物层且满足需求厚度的有效硬化层,同时具有良好的韧性和耐蚀性的离子渗层。方法将42CrMo4钢在温度500℃下离子渗氮5 h后,再进行不同工艺条件下的后氧化处理。通过调整后氧化的实验参数,探... 目的调控离子渗氮层的结构和性能,获得少无化合物层且满足需求厚度的有效硬化层,同时具有良好的韧性和耐蚀性的离子渗层。方法将42CrMo4钢在温度500℃下离子渗氮5 h后,再进行不同工艺条件下的后氧化处理。通过调整后氧化的实验参数,探索它们对渗氮层结构和性能的影响规律。使用金相显微镜、XRD衍射仪、维氏显微硬度计及电化学工作站分析截面渗层结构、物相、硬度、韧性和耐蚀性。结果在相同的离子渗氮条件(500℃,5 h)下,随着后氧化的温度和时间的改变,离子渗氮形成的化合物层逐渐分解,化合层的厚度逐渐减小,可由9.41μm减薄至3.62μm;经离子渗氮+后氧化处理后,形成的有效硬化层的厚度和表面硬度相较于常规离子渗氮有所提高,其中有效硬化层的厚度由300μm增至378μm,截面最高硬度由765HV0.05增至825HV0.05;渗层表面形成由Fe_(3)O_(4)、Fe_(2)O_(3)组成的氧化膜,提高了其耐蚀性,自腐蚀电位由-658.72 mV提升至-429.23 mV。结论42CrMo4钢经过离子渗氮及后氧化处理后,化合物层显著减薄,有效硬化层显著增厚,且截面硬度、韧性和耐蚀性等指标均得到改善,在后氧化工艺参数为400℃、2 h时获得了最优的综合性能,包括硬度、韧性、耐蚀性。 展开更多
关键词 42CrMo4钢 离子渗氮 离子后氧化 硬度 韧性 耐蚀性
下载PDF
上一页 1 2 134 下一页 到第
使用帮助 返回顶部